ALEXANDER HENRY HIGH SCHOOL<br />

232 Northern Ave. E.<br />

Sault Ste Marie, Ontario<br />

Phone (705) 945-7179<br />

Fax (705) 945-7866


PURPOSE OF THE FACILITY PROFILE<br />

The <strong>Algoma</strong> <strong>District</strong> <strong>School</strong> <strong>Board</strong>’s mission statement states that the <strong>Board</strong> “exists to provide<br />

positive learning opportunities of the highest standards for all learners to realize their full<br />

potential.”<br />

The <strong>Board</strong> currently has 51 schools serving a student population of approximately 13,000.<br />

With the underutilization of capacity in many of the <strong>Board</strong>’s facilities and with continued<br />

declining enrolment projected, the <strong>Board</strong> has been trying to balance the need to provide<br />

neighbourhood and/or community schools with the need to provide quality cost efficient<br />

programs for all students.<br />

As a result, in 2003, the <strong>Board</strong> established an Accommodation Review Committee consisting<br />

of trustees and staff to develop a plan that would address this issue. The committee’s plan<br />

included creating a profile for all board facilities to which the <strong>Board</strong> gave approval. Staff was<br />

directed to gather all pertinent data needed to produce the profiles that would describe the<br />

program offered, the physical condition and other relevant information for each facility. This<br />

profile would be provided for the review of all stakeholders: trustees, staff, parents/guardians,<br />

school councils and the community.<br />

The purpose of the review is to position the <strong>Board</strong> to consider the best and most effective ways<br />

in which the facilities can accommodate the students and their learning needs. This review<br />

would assist the <strong>Board</strong> in its commitment to provide a comprehensive range of educational<br />

opportunities, and providing this in an equitable fashion across a broad and diverse geographic<br />

area.<br />

The phases of this review are as follows:<br />

Phase I: The review and validation of the profiles by all stakeholders would serve as a starting<br />

point for considering the most effective ways in which our facilities can ensure a continued<br />

high standard of education for our students.<br />

Phase II: This review would allow for all stakeholders to provide input, reactions and options<br />

for consideration.<br />

Phase III: Based on the information gathered in Phase II the Accommodation Review<br />

Committee will prepare a report on available options for better use of our facilities.<br />

Phase IV: The Committee will present the report to the <strong>Board</strong> for the purpose of discussion<br />

and further direction.<br />

Phase V: This phase will serve to develop recommendations for the effective use of facilities.<br />

Phase VI: The <strong>Board</strong> would make decisions based on the recommendations from Phase V for<br />

implementation by staff.<br />

The following is the individual profile for this facility.<br />

1


ALEXANDER HENRY HIGH SCHOOL<br />

<strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong> is located at 232 Northern Avenue East in Sault Ste. Marie.<br />

Geographically just west of Great Northern Road beside what is known as the Zeller’s Plaza.<br />

<strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong> measures 12,070 square metres or 129,925 square feet.<br />

Constructed in 1965 with two (2) additions in 1971, the facility focuses on work programs such<br />

as job shadowing, work experience and cooperative education, as well as foods, television arts,<br />

graphic arts, manufacturing and transportation. The building also houses an Adult Education<br />

Centre and two daycare centres. .<br />

With an existing enrolment of 326 students, <strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong> is rated at 41.37%<br />

of capacity. Enrolment projections for 2007 indicate that capacity usage will further decrease<br />

to 23%.<br />

Community use at <strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong> is high with such uses as OSAID, Youth<br />

Hope, Apostolic Church, Community Living <strong>Algoma</strong>, Special Olympics, Power Squadron,<br />

Nipissing University Registration, Christmas events and various sports groups such as<br />

badminton, soccer, volleyball, basketball and floor hockey.<br />

292 students are transported to <strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong> via 41 individual routes. The<br />

longest travel time is 80 minutes, affecting one (1) student.<br />

2


PROGRAM PROFILE<br />

ALEXANDER HENRY HIGH SCHOOL<br />

FACILITY USAGE: Program<br />

Grades 9 - 12<br />

STAFFING: Current Program Staff:<br />

(F.T.E.)<br />

Principal 1 Vice Principal 1 Library Technician(s) .5<br />

Teachers 30.34 Educational Assistants 8.5 Noon Hour Assistant(s) 0<br />

Secretarial 3.5 Custodial 8<br />

SPECIAL PHYSICAL FEATURES:<br />

Other – Restaurant Service Assistants<br />

Gymnasium 2 Cafeteria 1<br />

Library 1 Computer Lab(s)<br />

Day Care 2 Other 1 - Academy of Reading Lab<br />

PROGRAM FEATURES:<br />

• Work Programs (Job Shadowing, Work Experience, ½ Day & Full Day Coop)<br />

• 3 Off Site Classrooms – (Davey Home, Station Mall, Water Tower Inn)<br />

• Spirited Hawks, Foods, Television Arts, Graphic Arts, Manufacturing, Transportation<br />

• Emphasis on Literacy (Special Programs for those who struggle with reading)<br />

• Articulate on with Foods’ Programs and Sault College<br />

EXTRA CURRICULAR:<br />

• Students can participate in activities in their neighbourhood high schools.<br />

• We focus on Intramural Programs at noon hour, including Gyms, Activity Room, and Computer<br />

Lab.<br />

3


Program Profile – <strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong><br />

COMMUNITY USE:<br />

• Heavy Use – OSAID, Youth Hope, Apostolic Church, CLA, Special Olympics, Power<br />

Squadron, Nipissing University Registration, Xmas Events (Children’s Party, Seniors’<br />

Light Tour), and Sport Groups (Badminton Club, Soccer, Volleyball, Basketball, Floor<br />

Hockey), Police/Fire Fighter testing<br />

ENROLMENT HISTORY – SEPTEMBER 30 TH<br />

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002<br />

331 333 324 307 316 322 361 301 295 307<br />

PROJECTED ENROLMENT<br />

2003 2004 2005 2006 2007<br />

326 289 260 206 183<br />

CAPACITY<br />

ENROLMENT<br />

CLASSROOM<br />

CAPACITY<br />

CAPACITY<br />

OF<br />

PORTABLES<br />

ON SITE<br />

CAPACITY<br />

OF<br />

PORTABLES<br />

IN USE<br />

TOTAL<br />

CAPACITY<br />

WITH<br />

PORTABLES<br />

TOTAL<br />

CAPACITY<br />

WITHOUT<br />

PORTABLES<br />

PROGRAM<br />

CAPACITY WITH<br />

PORTABLES<br />

PROGRAM<br />

CAPACITY<br />

WITHOUT<br />

PORTABLES<br />

326 788 0 0 788 788 41.37% 41.37%<br />

4


PHYSICAL PROFILE<br />

ALEXANDER HENRY HIGH SCHOOL<br />

General Description<br />

<strong>Alexander</strong> <strong>Henry</strong> is a secondary school constructed in 1965 with two additions in 1971. It is a<br />

two storey, masonry block walled structure with a flat roof and a brick veneer. The school<br />

contains 31 classrooms, two science laboratories, seven technical shops, one double<br />

gymnasium, one single gymnasium, one library, a cafetorium, two greenhouses, a paint room,<br />

two daycares and numerous offices and meeting areas. The facility is shared by the Adult<br />

Learning Centre (300 students enrolled), which utilizes nine classrooms and one of the daycare<br />

centres. All of the school is handicapped accessible via ramps and an elevator. The ramps<br />

were constructed for audiovisual carts and are now used for handicapped access. They are<br />

constructed of wood and are at a much steeper grade than the building code allows.<br />

Physical Structure<br />

The roofs at <strong>Alexander</strong> <strong>Henry</strong> are tar and gravel. This roofing was installed in 1965 and 1971<br />

and has therefore exceeded its life expectancy. Replacement should be considered within five<br />

years before failure occurs. The metal flashing is in poor condition and should be replaced at<br />

the same time as the roof.<br />

The brick and block work is in good condition with only minor spalling of the bricks. Stucco<br />

on the poured concrete pillars requires attention. The windows are original, in poor condition,<br />

and should be replaced.<br />

Flooring consists of terrazzo, vinyl coated tile and carpeting. The tiles in the 1971 addition are<br />

in fair condition but the tiles in the 1965 addition are in poor to very poor condition. Carpeting<br />

in the library is in fair condition. The foundation walls in the main electrical control room and<br />

the boiler room leak due to cracks in the foundation and improper drainage around the<br />

periphery of the school.<br />

The painting on the interior walls is in fair condition but an ongoing painting schedule must be<br />

developed. The lockers are original and in fair to poor condition. Ceiling tiles are mainly of<br />

the T-bar type; they are showing their age but are still in fair to good condition.<br />

5


Physical Profile – <strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong><br />

Electrical and Mechanical<br />

The electrical equipment is original and many of the individual panels are full. The main<br />

switchgear was serviced in 2002. The lights have been upgraded to the energy efficient<br />

fluorescent type T-8’s. The fire alarm system has been upgraded. The emergency lights in the<br />

shop wing have been upgraded but all other areas are original. The master clock system is<br />

problematic. The PA system is in fair condition.<br />

Four natural gas boilers were installed in 1997. All circulation pumps require ongoing<br />

maintenance. Shut off and control valves are original and should be repaired or replaced.<br />

Individual classroom heat ventilators are noisy and in poor condition. None of the computer<br />

classrooms have air conditioning or even proper ventilation. The science laboratories do not<br />

have fume hoods.<br />

The automotive shop has two original in-ground single pole hoists. One has been taken out of<br />

service due to failure of a component and the inability to locate replacement parts.<br />

Site<br />

The asphalt in the parking areas is in fair to poor condition. The lighting in the parking lot is<br />

low but adequate. The playing fields in the back of the school are well maintained and used<br />

throughout the summer by the city soccer league. There is no running track. A tennis court on<br />

the north side of the school is in fair condition.<br />

6


COMPARATIVE FINANCIAL DATA<br />

PLANT OPERATION COSTS<br />

ALEXANDER HENRY HIGH SCHOOL<br />

Note: Financial data indicates facility operational costs only, and excludes capital<br />

expenditures and plant administration/support.<br />

FUNCTION 2001 2002 2003<br />

General Repairs & Maintenance 19,456 28,041 12,735<br />

Miscellaneous Maintenance (grass, snow) 9,481 10,315 11,420<br />

Health & Safety, Security 3,460 1,560 1,988<br />

Buildings & Grounds 15,583 32,491 14,905<br />

Utilities 154,062 115,019 156,486<br />

Caretaking Supplies 24,884 17,991 13,315<br />

Caretaking Salaries 245,199 240,655 235,263<br />

Miscellaneous - Elevator 2,190 2,365 3,037<br />

Cafeteria – (Net) 31,300 38,122 34,734<br />

Energy Management 0 667 0<br />

TOTALS $505,615 $487,226 $483,883<br />

7


TRANSPORTATION PROFILE<br />

ALEXANDER HENRY HIGH SCHOOL<br />

NUMBER OF STUDENTS TRANSPORTED 292<br />

NUMBER OF SPECIAL NEEDS STUDENTS INCLUDED 0<br />

NUMBER OF INDIVIDUAL ROUTES 41<br />

LONGEST TRAVEL TIME (minutes) 80 AFFECTING 1 STUDENT<br />

SAFETY ISSUES:<br />

NUMBER OF OUT OF BOUNDS STUDENTS 0<br />

8


REAL ESTATE CAPITAL ASSET PRIORITY PLANNING<br />

(RECAPP)<br />

ALEXANDER HENRY HIGH SCHOOL<br />

This space is reserved for inclusion of the Ministry of Education independent facility audit<br />

describing physical conditions in each of our facilities.<br />

9


PHYSICAL STATUS SUMMARY<br />

<strong>Alexander</strong> <strong>Henry</strong> High <strong>School</strong><br />

SCHOOL/FACILITY: DATE: 24-Sep-03<br />

ROOF<br />

EXTERIOR WALLS<br />

WINDOWS<br />

Roof # Age Type Condition Addition Age Type Condition Addition Age Condition<br />

1 39 TG P Original 39 B F Original 39 P<br />

2 1 TG G 1 32 B F 1 32 P<br />

3 39 TG P 2 32 B F 2 32 P<br />

4 32 TG P<br />

5 32 TG P<br />

6 32 TG P<br />

HEATING<br />

ELECTRICAL<br />

VENTILATION<br />

Fuel Age<br />

NG 6<br />

Condition<br />

G<br />

General Comments: Boiler room upgraded<br />

with 4 new PK boilers in 1997, remainder of<br />

the heating system is original.<br />

General Comments: Electrical is original,<br />

main switchgear serviced in 2002. Lighting<br />

has been upgraded to energy efficient<br />

fluorescent. Fire alarm system has been<br />

upgraded to a fully addressable system.<br />

General Comments: Ventilation system is<br />

original and in overall poor to fair condition.<br />

Unit ventilators in most areas are noisy and<br />

problematic.<br />

Parking Lot<br />

Play Structures<br />

Play Areas<br />

SITE<br />

Type<br />

Front Paved<br />

Rear Paved<br />

None<br />

Football<br />

Condition<br />

F<br />

P<br />

G<br />

HANDICAPPED ACCESS<br />

General Comments: All areas are<br />

accessible by either a ramp or an elevator.<br />

ADDITIONAL COMMENTS<br />

New dust collector installed in the woodshop<br />

in 2001. Emergency lighting has been<br />

upgraded in the shop wing only all other<br />

areas is original. <strong>School</strong> has a tennis court<br />

and greenhouse. Partial ceiling tile upgrade<br />

has been completed in the corridors.<br />

VP - very poor - immediate replacement<br />

P - poor - replace within 1 to 5 years<br />

F - fair - replace within 6 to 10 years<br />

G - good - replace in excess of 10 years<br />

TG - Tar and Gravel<br />

MM - Modified Membrane<br />

LEGEND<br />

SPM - Single Ply Membrane<br />

PCM - Plastic Coated Metal<br />

W - Wood<br />

B - Brick<br />

M - Metal


Reaching to the Future<br />

829'-10"<br />

1348'-2"<br />

N<br />

1030'-11"<br />

NORTHERN AVENUE<br />

ALEXANER HENRY<br />

ALGOMA DISTRICT<br />

SCHOOL BOARD<br />

ALEXANDER HENRY<br />

SITE PLAN<br />

765'-7"


Reaching to the Future<br />

ALGOMA DISTRICT<br />

SCHOOL BOARD<br />

<strong>Alexander</strong><br />

<strong>Henry</strong><br />

FLOOR PLAN


Reaching to the Future<br />

LEGEND<br />

ADDITION NoYEAR AREA NOTES<br />

ADDITION PLANS<br />

ALGOMA DISTRICT<br />

SCHOOL BOARD<br />

Original 1965 8879msq<br />

Addition #1 1971 2790msq 2 story academic wing, small<br />

gym, library<br />

Addition #2 1971 401msq Small engine and welding shop<br />

<strong>Alexander</strong><br />

<strong>Henry</strong><br />

ADDITION PLAN


Reaching to the Future<br />

6<br />

3<br />

2<br />

1<br />

5<br />

4<br />

ROOF No YEAR AREA LEGEND<br />

NOTES<br />

Roof #1 Roof #2 1964 2002 21,000fsq 8,385fsq B.U.R.<br />

B.U.R.<br />

Roof #3 Roof #4 1964 1971 25,000fsq 28,700fsq B.U.R.<br />

B.U.R.<br />

Roof #5 1971 4,050fsq B.U.R.<br />

Roof #6 1971 6,340fsq B.U.R.<br />

ROOF PLANS<br />

ALEXANDER HENRY<br />

ALGOMA DISTRICT<br />

SCHOOL BOARD<br />