5. Book Reference followed<br />
6. Methodology<br />
7. Description<br />
b. Log Register with following details:-<br />
1. S1.No.<br />
2. Batch No.<br />
3. Quantity of starting materials<br />
4. Quantity of Avapa Dravya<br />
5. Quantity of Bhavana Dravya<br />
6. Date & Time of Starting of Bhavana/mardana<br />
7. Date & Time of completion of Bhavana/Mardana<br />
8. Num<strong>be</strong>r of Samputas (Quantity of material in each samputa)<br />
9. Type & Num<strong>be</strong>r of Puta<br />
10. Time and Date of ignition<br />
11. Time and Date of evacuation<br />
12. Time and Date of completion of Puta<br />
13. Obtained quantity<br />
14. Colour and texture of the product/Standards<br />
15. In process tests followed.<br />
B. Product Quality Control:-<br />
The specifications for finished Rasaushadhi are primarily intended to define the<br />
quality rather than to establish full characterization, and should focus on those characteristics<br />
found to <strong>be</strong> useful in ensuring the safety and efficacy. Consistent quality for Rasaushadhi can<br />
only <strong>be</strong> assured if the starting metals and minerals are defined in a rigorous and detailed<br />
manner. In some cases more detailed information may <strong>be</strong> needed on aspects of their<br />
collection. The manufacture will ensure in-house standards for the uniform reproducible end<br />
products.<br />
Quality testing will <strong>be</strong> carried out as per official texts namely colour, taste, varitaratwa,<br />
Rekhapurnatwa, Laghutva, Nirdhumatwa, Dntagre Kachakacha, Niruttha, Apunarbhava and<br />
Nischandratwa.