03.11.2014 Views

the Guide - VP Buildings

the Guide - VP Buildings

the Guide - VP Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Varco Pruden <strong>Buildings</strong> Systems <strong>Guide</strong><br />

advantage over manual design and detailing of <strong>the</strong><br />

structure.<br />

Hips and Valleys are generally more economical if<br />

symmetrical (45º), ra<strong>the</strong>r than skewed.<br />

The ability to utilize <strong>the</strong> pre-defined shapes in <strong>VP</strong><br />

Command minimizes <strong>the</strong> input for <strong>the</strong> project.<br />

Custom shapes can be input as required.<br />

Starting Eave Height for Clearances in <strong>VP</strong><br />

Command<br />

Many projects require a minimum or specified<br />

clearance under <strong>the</strong> frame of <strong>the</strong> building.<br />

To get <strong>the</strong> dimension that is required is a “trial<br />

and error” procedure. There are various ways to achieve<br />

<strong>the</strong> required frame clearance on a Building using <strong>VP</strong><br />

Command. Use <strong>the</strong> following chart to determine an<br />

additional dimension to add to <strong>the</strong> required clear<br />

dimension to get a starting eave height dimension when<br />

inputting <strong>the</strong> job into <strong>VP</strong> Command. Once <strong>the</strong> job is run,<br />

review <strong>the</strong> clear dimension designed and make and<br />

adjustments as needed. Rerun <strong>the</strong> job until you are<br />

satisfied with <strong>the</strong> dimensions.<br />

Ano<strong>the</strong>r method is to specify <strong>the</strong> depth of <strong>the</strong><br />

rafter that will yield <strong>the</strong> required clearance. This method<br />

will usually result in a non-competitive (pricewise) design<br />

if you restrict <strong>the</strong> depth less than <strong>the</strong> program chooses.<br />

Input <strong>the</strong> job and transfer <strong>the</strong> project for Interactive<br />

Frame Design (IA) assistance with a note in <strong>the</strong> “frames<br />

note” section describing what you want. The designer<br />

will attempt to design <strong>the</strong> frame for what is required and<br />

return <strong>the</strong> frame to you based on <strong>the</strong> starting eave<br />

height you have input.<br />

Request assistance from your <strong>VP</strong> Service Team<br />

to help determine <strong>the</strong> correct eave height to satisfy <strong>the</strong><br />

requirements.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!