The <strong>2008</strong>–09 year has seen the strengthening of<br />
This is an excellent result considering that three of our<br />
partnerships between V/<strong>Line</strong>, our staff and the many<br />
five rail corridors were shut down by the 7 February ‘Black<br />
regional communities we serve.<br />
Throughout the year we met with 34 regional councils, a<br />
range of government departments, MPs, business groups<br />
and community organisations to better understand the<br />
changing transport needs of country Victoria. We also<br />
continued our successful on-train consultations to give<br />
Saturday’ bushfires. Fires swept through the township<br />
of Wandong, destroying the station’s platform, pit, 1200<br />
sleepers and two rail bridges on the Seymour line. Fire also<br />
burned more than 3000 sleepers on the Warrnambool line<br />
near Camperdown; and although the Gippsland line was not<br />
damaged, it closed for a day due to the proximity of fires.<br />
Track works at Maryborough Station.<br />
v<br />
our customers direct access to senior management, and<br />
we continued to work with hundreds of local suppliers and<br />
service providers across the state to further spread the<br />
economic benefits of our service.<br />
More than $1 million worth of damage was caused to<br />
V/<strong>Line</strong> infrastructure, and considering the scale of the<br />
damage, the fact that Seymour and Warrnambool line<br />
services were disrupted for just nine days was nothing<br />
CEO's <strong>report</strong><br />
r V/<strong>Line</strong> CEO Rob Barnett and infrastructure worker Terry Pring at Maryborough Station.<br />
These partnerships have not only helped us improve<br />
our service dramatically in recent years and facilitated<br />
unprecedented growth, but they have also paved the<br />
way for us to continue to grow.<br />
MEETING E THE CHALLENGE L E OF EXTREME E E WEATHER<br />
E Perhaps the greatest test of our staff was the heat wave that<br />
swept Victoria during January and February, with several<br />
days above 40 degrees, power black-outs, heat-related train<br />
speed restrictions and the devastating impact of bushfires.<br />
A proactive, well-planned and coordinated response with<br />
government agencies and other transport operators saw<br />
nearly all V/<strong>Line</strong> services run. All but 41 out of 11,834<br />
scheduled services over those two months either ran<br />
normally or were replaced with road coaches. Of this 20 of<br />
those couldn’t be replaced as road access was cut off during<br />
the peak of the bushfires.<br />
short of remarkable. Without our dedicated, in-house<br />
infrastructure team (which has only been part of V/<strong>Line</strong> for<br />
the past two years), it is highly unlikely that such a quick<br />
recovery would have been possible. I am extremely proud<br />
of the response not only of our infrastructure workers, but<br />
also our operations team who were constantly in touch with<br />
emergency services to safely plan road coaches.<br />
EXPANDING N OUR SERVICES<br />
E S<br />
Customer confidence is demonstrated not only in our high<br />
satisfaction rating of 78.4, but in our record patronage –<br />
the ultimate guide to how we’re performing as an operator.<br />
Such massive support for regional train services has<br />
encouraged further state government investment in<br />
infrastructure, including the opening of Ballarat’s second<br />
railway station at Wendouree during the year. In December,<br />
the government also made an unprecedented commitment<br />
to public transport in its Victorian Transport Plan, which<br />
V/LINE ANNUAL N A REPORT R <strong>2008</strong>-<strong>2009</strong><br />
0 2 0 0 CEO'S REPORT 10/11