3. Due to the old basement could not support those<br />

heavy plants which were required for the construction<br />

of the foundation using other mechanical means,<br />

hand-dug caissons were being used in this case.<br />

4. Temporary ground support and shoring were to be<br />

erected to take up the lateral pressure of soil while<br />

doing the demolition.<br />

5. Because of the inevitable sectioning and phasing<br />

arrangement involved in the demolition of the old<br />

basement, and, at the same time, to replace it with a<br />

new structure, complicated planning and construction<br />

jointing provisions were required.