Bruce Heavy Water Plant Decommissioning<br />

Environmental Assessment Study Report<br />

Ontario Power Generation<br />

Final Submission to CNSC<br />

LIST OF TABLES<br />

Page No.<br />

2.1 Comparison of the Decommissioning Options........................................................... 2-2<br />

2.2 Comparison of the Decommissioning Options for the Enriching Unit Towers.......... 2-7<br />

3.1 Chemicals Remaining in Use on the BHWP Site ....................................................... 3-7<br />

3.2 Structures that will be Demolished During the BHWP Decommissioning Project.. 3-11<br />

3.3 Buildings that will be Demolished During the BHWP Decommissioning Project .. 3-13<br />

3.4 Site Services that will be Demolished During the BHWP Decommissioning<br />

Project ....................................................................................................................... 3-16<br />

3.5 Principal Hazardous Wastes ..................................................................................... 3-19<br />

3.6 Summary of the Wastes Produced During the Demolition of Enriching Units<br />

Nos. 3 and 8 (Mg) ..................................................................................................... 3-20<br />

3.7 Scrap Estimate for the Proposed BHWP Decommissioning Project (Mg)............... 3-21<br />

3.8 Approximate Schedule for BHWP Decommissioning ............................................. 3-31<br />

3.9 Buildings and Structures that will Remain on the BHWP Site at the end of the<br />

BHWP Decommissioning Project............................................................................. 3-33<br />

3.10 Pipe Racks that will Remain on the BHWP Site at the end of the BHWP<br />

Decommissioning Project ......................................................................................... 3-35<br />

5.1 Stakeholder Briefings.................................................................................................. 5-3<br />

5.2 Comments from Stakeholders – Period 1 ................................................................... 5-4<br />

5.3 Comments from Government Agencies – Period 2 .................................................... 5-7<br />

5.4 Comments from Stakeholders – Period 3 ................................................................... 5-8<br />

6.1 Frequency Distribution (%) of Synoptic Weather Patterns at the Regional Level..... 6-2<br />

6.2 Mean Temperature and Precipitation Normals (1961-1990): Regional Study Area .. 6-3<br />

6.3 Wind Speed and Wind Direction Normals (1961-1990): Regional Study Area......... 6-4<br />

6.4 Estimated Background Pollutant Concentrations in the Regional Study Area........... 6-9<br />

6.5 Ambient Noise Levels at Noise-Sensitive Receptors ............................................... 6-12<br />

6.6 Metal Parameters Exceeding MOE Guidelines ........................................................ 6-24<br />

6.7 Summary of Groundwater Chemistry by Stratigraphic Unit .................................... 6-25<br />

6.8 Groundwater Chemistry Upstream and Downstream of BHWP-1998..................... 6-27<br />

6.9 Groundwater Chemistry on BHWP Site - 1998........................................................ 6-28<br />

6.10 VECs and VSCs Selected for BHWP Decommissioning Project............................. 6-44<br />

7.1 Bruce Heavy Water Plant Decommissioning Environmental Assessment........ follows 7-2<br />

7.2 Potential Project/Environment Interactions (Indirect Effects).................................... 7-5<br />

8.1 Assumed/Estimated Parameter Values for Emissions Estimation.............................. 8-2<br />

8.2 Maximum Measured Soil Contaminant Concentrations............................................. 8-3<br />

8.3 Estimated 24 Hour Average Soil Constituent Concentrations in Air Due to<br />

Demolition Activities.................................................................................................. 8-5<br />

8.4 Annual Project-Related Employment ....................................................................... 8-22<br />

8.5 Property Tax Assessment on BHWP Buildings - 1998 ............................................ 8-26<br />

8.6 Identification and Screening of Credible Events ...................................................... 8-30<br />

viii December 2002