Four broad criteria relating to safety, environmental protection, cost and schedule were<br />

considered in the analysis. The preferred option that was selected from this process<br />

involves the demolition to grade of all structures, buildings and site services, followed by<br />

site remediation.<br />

7.0 PUBLIC AND STAKEHOLDER CONSULTATION<br />

Section 5.0 of the EASR describes the public and stakeholder consultation program<br />

conducted by OPG during the environmental assessment. A number of consultative<br />

activities involving local communities, aboriginal peoples, government departments and<br />

other stakeholders were conducted. Communication activities included project<br />

notification letters, public information open houses, newsletters, tours of the site, and<br />

project briefings to stakeholder committees. The consultation occurred in three periods:<br />

(i) an initial period from September 1998 to December 1998; (ii) an interim period from<br />

January 1999 to June 2002 that primarily involved governmental consultation; and (iii) a<br />

third period from July 2002 to September 2002 which involved distribution of a<br />

preliminary draft of the EASR to interested stakeholders in the local community for<br />

comment.<br />

Issues raised by stakeholders during the consultation, and the consideration of these<br />

issues in the assessment, are identified in section 5.0 of the EASR. No public concerns<br />

associated with the decommissioning project were identified which would warrant a need<br />

to have the project referred to a mediator or review panel pursuant to section 25 of the<br />

CEAA.<br />

8.0 <strong>PROJECT</strong> DESCRIPTION<br />

Section 3.0 of the EASR describes the proposed decommissioning project that was<br />

assessed.<br />

The current status of the site is described, including an identification of the structures and<br />

buildings associated with the BHWP (eg., enrichment and degassing towers, pipe racks);<br />

site services (eg., surface water treatment facility, process effluent lagoons, sludge<br />

lagoons); and substances (nuclear, chemical) remaining on site.<br />

The proposed decommissioning project works and activities are described in Section 3.0<br />

of the EASR, including:<br />

(i) demolition methods;<br />

(ii) decommissioning of structures;<br />

(iii) decommissioning of buildings;<br />

(iv) decommissioning of site services;<br />

(v) land remediation; and<br />

(vi) management of wastes generated during the project.<br />