Bruce Heavy Water Plant Decommissioning<br />

Environmental Assessment Study Report<br />

Ontario Power Generation<br />

Final Submission to CNSC<br />

conducted. A Comprehensive Study Report (CSR) is to be prepared and submitted to the federal<br />

Minister of Environment and the Canadian Environmental Assessment Agency (Agency),<br />

pursuant to section 21 of the Act, before the proposed licensing decision can be made pursuant to<br />

the NSCA.<br />

Pursuant to the Federal Coordination Regulations under the Act, Environment Canada and<br />

Health Canada declared themselves as expert Federal Authorities with interests in the<br />

decommissioning project. Fisheries and Oceans Canada initially indicated an interest in<br />

participating as an expert Federal Authority, but subsequently withdrew when it determined that<br />

there were no environmental assessment issues associated with the project involving fish or fish<br />

habitat.<br />

CNSC, pursuant to subsection 17(1) of the Act, has delegated to OPG the conduct of the<br />

technical support studies for the EA and the public consultation program as well as the<br />

preparation of the EA Study Report. CNSC and the expert Federal Authorities will review the<br />

EA Study Report. Once accepted, it will be used by the CNSC as the basis for the preparation of<br />

the Comprehensive Study Report under the Act for this project.<br />

1.2.1.3 Public Registry<br />

CNSC has established a public registry for the EA as required by section 55 of the Act. This<br />

includes identification of the EA in the Federal Environmental Assessment Index, which can be<br />

accessed on the website of the Canadian Environmental Assessment Agency (www.ceaa.gc.ca).<br />

The Federal Environmental Assessment Index reference number for this project is 16968.<br />

1.2.1.4 Stakeholder Consultation<br />

OPG undertook a number of community and stakeholder communications and consultation<br />

activities. These activities were undertaken with the following objectives:<br />

• To update key stakeholders on plans to decommission the BHWP;<br />

• To provide the Bruce Community with opportunities to learn about the BHWP<br />

decommissioning project;<br />

• To ensure public comments are documented and addressed in the EA Study Report; and<br />

• To maintain and build upon existing key stakeholder and local community support for ongoing<br />

operations on the Bruce nuclear site.<br />

1.2.2 Canadian Nuclear Safety Commission Licences<br />

1.2.2.1 Nuclear Facility Licences<br />

The BHWP is regulated by the CNSC under a Heavy Water Plant Operating Licence issued<br />

pursuant to the NSCA. A portion of the facility, for which construction was started but never<br />

1-5 December 2002