08.11.2014 Views

BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT

BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT

BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bruce Heavy Water Plant Decommissioning<br />

Environmental Assessment Study Report<br />

Ontario Power Generation<br />

Final Submission to CNSC<br />

LIST OF FIGURES<br />

Page No.<br />

1.1 Location of Bruce Nuclear Site............................................................................... follows 1-4<br />

1.2 Location of Bruce Heavy Water Plant on Bruce Nuclear Site................................ follows 1-4<br />

1.3 Areas of the Bruce Heavy Water Plant Currently Regulated Under CNSC<br />

Licences .................................................................................................................. follows 1-6<br />

3.1 Aerial View of Bruce Heavy Water Plant............................................................... follows 3-2<br />

3.2 Solid Waste Management at the BHWP Decommissioning Project ............................. 3-18<br />

4.1 Regional and Local Study Areas for the BHWP Decommissioning Project.......... follows 4-2<br />

4.2 Site Study Area for BHWP Decommissioning Project........................................... follows 4-2<br />

6.1 Location of Meteorological Stations....................................................................... follows 6-2<br />

6.2 Wind Speed Distribution at Bruce Nuclear Site 10 m Meteorological Tower<br />

(1991-1995)...................................................................................................................... 6-5<br />

6.3 Wind Direction Frequency (%) (1998-2000)................................................................... 6-6<br />

6.4 Average Monthly Air Temperature (1991-1995) on Bruce Nuclear Site........................ 6-7<br />

6.5 Average Frequency Distribution of Atmospheric Stability (1991-1995)<br />

at Bruce Nuclear Site ....................................................................................................... 6-8<br />

6.6 Locations of Soil Sampling on BHWP Site.......................................................... follows 6-22<br />

6.7 Water Level Contours on Bruce Nuclear Site (1998-1999).................................. follows 6-26<br />

6.8 Land Use on the Bruce Nuclear Site..................................................................... follows 6-36<br />

6.9 Location of First Nation Communities ................................................................. follows 6-42<br />

8.1 Maximum Predicted Incremental 24 Hour Average TSP Concentrations (µg/m 3 )<br />

Due to Excavation Activities ........................................................................................... 8-6<br />

8.2 Maximum Predicted Incremental 24 Hour Average PM 10 Concentrations (µg/m 3 )<br />

Due to Excavation Activities ........................................................................................... 8-7<br />

8.3 Frequency of Occurrence of Predicted Incremental 24 Hour Average TSP<br />

Concentrations and 24 Hour Average PM 10 Concentrations at Inverhuron Park ............ 8-8<br />

8.4 Frequency of Occurrence of Predicted Incremental 24 Hour Average TSP<br />

Concentrations and 24 Hour Average PM 10 Concentrations at Baie du Doré................. 8-9<br />

x December 2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!