08.11.2014 Views

Optiline Range - Reco

Optiline Range - Reco

Optiline Range - Reco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OPTILINE<br />

SULKY options for tramlining<br />

and drilling management<br />

Pioneer of automatic tramlining, SULKY has gradually widened its range with real drilling management control<br />

boxes, which now provide the operator an easy way to monitor his work over time.<br />

1<br />

ULTRON electronic control box : simple and complete<br />

■ Disconnecting 4 metering wheels (2 x 2 rows, or 2 x 3 rows optional)<br />

depending on the chosen tramlining rhythm (automatic pass counting based on<br />

hydraulic side marker changing);<br />

■ Alarms for the end of hopper and anomaly with the metering rotation;<br />

■ On-screen information : forward speed, area covered (partial and total), the<br />

STOP button enables the counter to be momentarily stopped if the driver has to<br />

lift a marker to go around an obstacle (tree, pylon).<br />

2 ULTRON MS electronic control box :<br />

in addition, modulation<br />

This box has all the same functions as the ULTRON while incorporating the<br />

following additional functions.<br />

■ Rate calibration assistance* : simply display on-screen the weight obtained<br />

during the calibration test, then the required rate/ha, and the control box will<br />

automatically position the setting marker on the variator through an electric<br />

actuator.<br />

■ Rate modulation* : during work, by +/- 10% stages (1), for example to<br />

increase seed rate when approaching a more difficult area or to drill double<br />

density plots (monitoring nitrogen deficiency on arable crops)<br />

■ On/off rate control.<br />

3 MEDION electronic control box :<br />

the fundamentals<br />

This economical box provides the main functions : automatic<br />

tramlining, STOP button, on-screen information.<br />

(1) These 10% stages can, depending on requirements, be adjusted (5% stages for example).<br />

* Except for low rates/ha < 5 kg (ex : Rape)<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!