to download for Details and Application format - Andhra Pradesh ...
to download for Details and Application format - Andhra Pradesh ...
to download for Details and Application format - Andhra Pradesh ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
10<br />
be<strong>for</strong>e the committee along with the recommendations. The least cost<br />
proposal (L-1) can be approved / invited <strong>for</strong> negotiation <strong>and</strong> <strong>for</strong> final<br />
award of contract The cost of preparing proposals <strong>and</strong> of negotiating a<br />
contract including visits <strong>to</strong> the including site visits, survey etc., <strong>for</strong><br />
submission of proposals, if any is not reimbursable as a direct cost of'<br />
the assignment. The consultants shall hold their proposal valid <strong>for</strong><br />
120 days from the date of submission without change in the personnel<br />
proposed <strong>for</strong> the assignment <strong>and</strong> their proposed price.<br />
Rejection of All Proposals:<br />
AMR-APARD will have the right <strong>to</strong> reject all proposals in whole or in<br />
part in cases where the bids are in deviation <strong>to</strong> the TOR or considered<br />
unreasonably high in cost or if the lowest qualified bidder during<br />
negotiations fails <strong>to</strong> reduce the costs <strong>to</strong> a reasonable level.<br />
General instructions <strong>for</strong> submission of in<strong>for</strong>mation:<br />
1. All in<strong>for</strong>mation called <strong>for</strong> should be furnished against the<br />
relevant columns in the <strong>for</strong>ms. If any in<strong>for</strong>mation is furnished on<br />
a separate sheet, this fact should be mentioned against the<br />
relevant column.<br />
2. The applicants will be required <strong>to</strong> submit the necessary details<br />
with authenticated documents, credentials in support of<br />
Qualifying Requirements.<br />
3. The applicant should sign on each page of the application.<br />
4. The applicant may furnish any additional in<strong>for</strong>mation, which is<br />
deemed necessary <strong>to</strong> establish capability <strong>to</strong> successfully<br />
complete the envisaged project.<br />
5. Any in<strong>for</strong>mation furnished by the applicant found <strong>to</strong> be incorrect<br />
either immediately or at a later date, would render the applicant<br />
liable <strong>to</strong> be debarred from taking up the project.<br />
6. The EOI document in prescribed <strong>for</strong>m duly completed should be<br />
submitted in a sealed cover <strong>to</strong> the Commissioner AMR-APARD<br />
Rajendernagar Hyderabad-500030. on or be<strong>for</strong>e:20/02/2010<br />
7. The sealed cover should be super scribed “EOI – Interest <strong>to</strong><br />
Participate in Preparation of Master Plan”.<br />
8. Interested consultants may note that this is not a request <strong>for</strong><br />
bids. After review <strong>and</strong> scrutiny of Expression of Interest, the<br />
committee constituted <strong>for</strong> these purpose will shortlist suitable<br />
Architects/ Consultants, who will be furnished with the required