Expression of Interest<br />
Selection of Architect Planner/ Consultant <strong>for</strong> preparing L<strong>and</strong><br />
Use plan <strong>and</strong> the Master Plan of Academic / Residential<br />
Campus <strong>for</strong> AMR- APARD Hyderabad.<br />
AMR_APARD invites eligible Architect Planners /consultants <strong>for</strong><br />
preparing L<strong>and</strong> Use plan <strong>and</strong> the Master Plan of Academic / Residential<br />
Campus at its Extension Training Centre (ETC) Rajendranagar,<br />
Hyderabad. Interested consultants may provide in<strong>for</strong>mation indicating<br />
that they are qualified <strong>to</strong> per<strong>for</strong>m the services by giving description of<br />
similar assignments, experience in similar conditions, availability of<br />
appropriate skills among staff, etc. A consultant will be selected in<br />
accordance with the procedures set out below. Expressions of interest<br />
must be submitted <strong>to</strong> commissioner AMR-APARD, Rajendranagar,<br />
Hyderabad - 500030 .<br />
This EOI document contains the following<br />
(I) Introduction about the project: Introduction about AMR-<br />
APARD <strong>and</strong> the need <strong>for</strong> this project.<br />
(II) Objectives <strong>and</strong> scope of work : A brief description about<br />
objective of carrying out the assignment, broad scope of work<br />
<strong>and</strong> expected deliverables of the assignment.<br />
(III) Instructions <strong>to</strong> the Consultants: Instructions regarding<br />
nature of job <strong>and</strong> submission requirements.<br />
(IV) Qualification Criteria; The pre qualification criteria <strong>for</strong> short<br />
listing the consultants.<br />
(V) Final selection criteria: The process that will be followed <strong>for</strong><br />
final selection of consultants<br />
(VI) Formats <strong>for</strong> submission. The <strong>for</strong>mat in which the consultants<br />
have <strong>to</strong> submit their EOI.<br />
INTRODUTION ABUOT THE PROJECT:<br />
Training is a crucial input <strong>for</strong> the success of any planned<br />
development intervention. AMR-A.P. Academy of Rural Development<br />
is an Apex Training Institute in the State, in the field of Panchayat Raj,<br />
Rural Development, Disaster Management <strong>and</strong> L<strong>and</strong> Administration<br />
etc. The Institution was started in the year 1954. In the last (55) yeas<br />
it has trans<strong>for</strong>med itself in<strong>to</strong> a Premier institution <strong>for</strong> Capacity Building<br />
in the areas of policy <strong>for</strong>mulation, Programme implementation,<br />
training, research, evaluation, documentation <strong>and</strong> dissemination of<br />
in<strong>for</strong>mation. AMR-APARD is situated in Rajendranagar Hyderabad
2<br />
adjacent <strong>to</strong> ANGRAU <strong>and</strong> other national institutions like NIRD, NARM,<br />
MANAGE etc.<br />
There are five regional training centres called Extension Training<br />
Centres (ETCs) under the control of AMR-APARD. These are located at<br />
Rajendranagar, Bapatla Srikalahasti, Samalkota <strong>and</strong> Hasanparthy.<br />
The Campus of ETC Rajendranagar campus is spread over 118 acres<br />
on the Himayatsagar main road connecting <strong>to</strong> outer ring Road <strong>and</strong> <strong>to</strong><br />
Rajiv G<strong>and</strong>hi International Airport Hyderabad.<br />
Government has recently taken a decision <strong>to</strong> locate the Training<br />
facilities of all departments at one place <strong>for</strong> optimum utilization of<br />
scarce l<strong>and</strong> resources. This common training infrastructure including<br />
recreation facilities will be shared by all the participating departments.<br />
In order <strong>to</strong> achieve this objective, Government have constituted a<br />
committee under the Chairmanship of Secretary (Rural Development)<br />
<strong>to</strong> take a decision on the modalities of the construction of common<br />
training facilities <strong>and</strong> issues relating there<strong>to</strong>. Preparation of l<strong>and</strong> use<br />
plan <strong>for</strong> the entire l<strong>and</strong> belonging <strong>to</strong> Extension Training Centre,<br />
Rajendranagar <strong>and</strong> APARD precedes this activity.<br />
AMR-APARD is looking <strong>for</strong> a reputed Architectural Planner <strong>to</strong> provide<br />
<strong>for</strong> the following services which consists of two parts<br />
PART – I<br />
Preparation of detailed prospective l<strong>and</strong> use plan <strong>for</strong> the<br />
entire l<strong>and</strong> of ETC Rajendranagar.<br />
The Master Plan <strong>for</strong> l<strong>and</strong> use needs <strong>to</strong> be prepared <strong>to</strong> prevent<br />
haphazard growth of structures. Such plan will take in<strong>to</strong> account<br />
the requirements of space <strong>for</strong> office / training area, residential area<br />
<strong>for</strong> faculty <strong>and</strong> staff, area <strong>for</strong> student hostels, recreational area <strong>and</strong><br />
open spaces. Proposed buildings will come up in areas set apart <strong>for</strong><br />
them.<br />
PART – II<br />
Architectural Design <strong>for</strong> the required infrastructure<br />
The proposed campus will comprise three complexes:<br />
a. Academic/training complex: comprising Academic/training<br />
Buildings, Administrative offices, Library, Computer Centre,<br />
labora<strong>to</strong>ry, demonstration centers etc. keeping in view the<br />
possible evolution of APARD in<strong>to</strong> a University.<br />
b. Residential Complex: Accommodation <strong>for</strong> staff <strong>and</strong> faculty,<br />
Guest House, crèche, Community hall <strong>and</strong> parking area etc.
c. Hostel complex: Hostels <strong>and</strong> Recreational Centre.<br />
OBJECTIVES AND SCOPE OF WORK:<br />
PART - I<br />
3<br />
The Architect Planner is expected <strong>to</strong> examine the project in detail<br />
<strong>and</strong> carryout such studies as may be required <strong>to</strong> submit proposals <strong>for</strong><br />
L<strong>and</strong> use plan first.<br />
When a decision is taken <strong>to</strong> construct the proposed facilities, the<br />
same consultants who has prepared L<strong>and</strong> use plan shall prepare<br />
Architectural Plan <strong>for</strong> new construction.<br />
1. The objective of this assignment is the preparation of L<strong>and</strong> use<br />
Master plan <strong>for</strong> the entire campus. The l<strong>and</strong> use plan <strong>and</strong> buildings<br />
should be ecologically sustainable resulting in more efficient use of<br />
energy, water <strong>and</strong> other resources. All the complexes in the<br />
campus must be planned in an integrated manner <strong>to</strong> result in<br />
aesthetically appealing, nature friendly, functionally efficient green<br />
campus.<br />
2. Preparation of L<strong>and</strong> use <strong>and</strong> layout plan indicating soil type <strong>and</strong><br />
<strong>to</strong>pography. The layout plan should also contain location of all<br />
proposed buildings <strong>and</strong> the possible future extensions, l<strong>and</strong>scaping<br />
areas, water bodies etc. The detailed layout plan shall include all<br />
necessary data relating <strong>to</strong> the existing structures, adjoining<br />
properties <strong>and</strong> boundaries.<br />
PART – II<br />
1. The consultants/ firm which has provided L<strong>and</strong> use plan will have<br />
<strong>to</strong> provide Engineering & Design Consultancy <strong>for</strong> the following<br />
services including of all drawings. The drawings should be<br />
submitted in soft copy <strong>and</strong> four numbers of hard copies<br />
incorporating all changes wherever necessary<br />
a) Detail Planning <strong>and</strong> Design (3D view) of the new<br />
complexes.<br />
b) Designing water supply network <strong>and</strong> drainage systems.<br />
c) Interior Design, Electrical, HVAC <strong>and</strong> fire protection etc.<br />
d) L<strong>and</strong>scaping.<br />
2. Preparation of preliminary architectural design/ sketches within<br />
the available area <strong>and</strong> limitations prescribed <strong>to</strong> ensure<br />
economical <strong>and</strong> functional design concept.
4<br />
3. To participate in the discussions <strong>for</strong> clearing the preliminary<br />
designs where the modifications required are <strong>to</strong> be carried out.<br />
4. Clearance from APARD should be obtained first <strong>for</strong> the<br />
preliminary designs, be<strong>for</strong>e taking up the work of detailed<br />
Architectural drawings <strong>for</strong> elevations, staircases, railing <strong>and</strong><br />
st<strong>and</strong>ard amenities etc.,<br />
5. Preparation of electrical layout showing the entire distribution<br />
system including internal <strong>and</strong> external electrification details,<br />
designs of substation <strong>and</strong> genera<strong>to</strong>rs etc.<br />
6. Preparation of detailed estimates <strong>and</strong> specifications <strong>for</strong> all<br />
proposed constructions including all internal <strong>and</strong> external<br />
services, such as water supply, sanitary <strong>and</strong> electrical,<br />
External drainage, sewerage <strong>and</strong> garbage disposal systems.<br />
7. Preparation of schematic drawings <strong>for</strong> inviting tenders on<br />
quotations from various lift agencies <strong>and</strong> air conditioning firms<br />
<strong>and</strong> preparation of their estimates.<br />
8. Preparation of schematic proposals <strong>to</strong> meet requirements <strong>for</strong><br />
fire fighting regulations.<br />
9. All interior design <strong>and</strong> drawings including furniture/ equipment<br />
locations, design wall paneling <strong>and</strong> false ceiling etc., if<br />
necessary, are <strong>to</strong> be provided.<br />
10. Positioning of an Architect <strong>for</strong> the contract period at site <strong>for</strong><br />
day <strong>to</strong> day co-ordination with AMR-APARD <strong>to</strong> ensure smooth<br />
supply of construction drawings <strong>and</strong> documents should a<br />
decision <strong>to</strong> construct the proposed facilities is taken.<br />
QUALIFYING REQUIREMENTS<br />
1. The Architects / Consultants shall have adequate in house<br />
expertise <strong>and</strong> experience in<br />
a. Surveying <strong>and</strong> estimation.<br />
b. Architectural <strong>and</strong> structural planning <strong>and</strong> design.<br />
c. Planning <strong>and</strong> design of all services including water supply,<br />
sanitation, electrical, interiors <strong>and</strong> HVAC etc., incorporating<br />
relevant <strong>and</strong> latest emerging features in the field.
5<br />
2. They should have a good track record of rendering architectural<br />
concept / design services <strong>for</strong> at least three large<br />
Academic/Residential campus.<br />
3. The Firms showing interest, should have at least one Town<br />
Planner with qualifications recognized by the Institute of Town<br />
Planners INDIA or a member of the Town Planning Institute<br />
having at least five years professional experience.<br />
4. Firms showing interest must have been in operation <strong>for</strong> at least<br />
five years.<br />
5. They should have experience of preparing City Development<br />
Plans or Area Development Plans.<br />
6. The minimum turnover of the Firms should be over of Rs. 1.5<br />
crore annual consultancy fee.<br />
7. The Firm should have proven capacity of organizing all aspects of<br />
preparing comprehensive integrated development Plans, i.e l<strong>and</strong><br />
survey, Dem<strong>and</strong> survey & <strong>for</strong>ecast, liasoning with various<br />
Authorities involved, finalization <strong>and</strong> presentation of Report.<br />
8. They should be able <strong>to</strong> conduct feasibility study in terms of<br />
project phasing.<br />
9. In case the Architects / Consultants do not have in house<br />
capability <strong>for</strong> a particular field of specialization mentioned above,<br />
they may avail the services of external agencies as ‘Associates’<br />
<strong>for</strong> providing <strong>to</strong>tal support <strong>and</strong> expertise. The details of<br />
Associates shall be furnished by the Principal Architect /<br />
Consultant. However, the responsibility <strong>for</strong> the quality of work<br />
etc of the associate architect rests with the principal architect.<br />
10. The consultants will be short listed based on their past<br />
experience of h<strong>and</strong>ing similar types of projects, strength of their<br />
man power <strong>and</strong> financial strength etc. The broad parameters are<br />
as follows. The Committee will short list all the consultants who<br />
secure a minimum of 50 marks out a <strong>to</strong>tal of 100<br />
· Past Experience of the firm ( weightage..50%)<br />
· Experience of Key Personnel ( weightage..40%)<br />
· Financial Strength of the Consultant ( weightage..10%)
6<br />
Once the short listing of consultants is completed, the process of<br />
final selection of the consultant will be taken up. In this stage, the<br />
short-listed consultant will be invited <strong>to</strong> submit (Request <strong>for</strong><br />
Proposals or RFP) which include Technical <strong>and</strong> Financial Proposals.<br />
The consultant shall be selected based on evaluation of their<br />
Technical <strong>and</strong> Financial bids.<br />
FINAL SELECTION OF CONSULTANT:<br />
The final selection process includes the following steps:<br />
(a) preparation of Terms of Reference (TOR);<br />
(b) preparation of cost estimate.(RFP);<br />
(c) pre-bid meeting;<br />
(d) receipt of proposals;<br />
(e) evaluation of technical proposals:<br />
(f) opening of financial proposals;<br />
(g) evaluation of financial proposal;<br />
(h) selection of the winning proposal;<br />
(i) negotiations with the selected consultant, if required<br />
(j) award of the contract <strong>to</strong> the selected firm.<br />
Terms of reference<br />
It explains the objectives, scope of work, activities, tasks <strong>to</strong> be<br />
per<strong>for</strong>med, respective responsibilities of AMR-APARD <strong>and</strong> the<br />
consultant, <strong>and</strong> expected results <strong>and</strong> deliverables of the assignment<br />
The TOR shall include:<br />
i) Purpose/ objective of the assignment;<br />
ii) Detailed scope of work;<br />
iii) Expected input of key professionals<br />
iv) Proposed schedule <strong>for</strong> completing the assignment;<br />
v) Reports/deliverables required from the consultant.<br />
vi) Procedure <strong>for</strong> review of the work of consultant after award of<br />
contract
Preparation <strong>and</strong> Issuance of the Request <strong>for</strong> Proposals (RFP)<br />
7<br />
Request For Proposal (RFP) is the bidding document in which the<br />
technical <strong>and</strong> financial proposals from the consultants are obtained..<br />
The RFP will provide all the in<strong>for</strong>mation necessary <strong>for</strong> the short-listed<br />
consultants <strong>to</strong> prepare their proposals. It identifies the evaluation<br />
criteria, selection method, <strong>and</strong> procedures that will be used <strong>to</strong> evaluate<br />
them. The RFP also contains the Terms of Reference (TOR) <strong>and</strong> the<br />
draft contract <strong>for</strong> the assignment. The RFP document will be sent only<br />
<strong>to</strong> the short listed consultants<br />
It contains the following:<br />
i) A letter of invitation (LOI)<br />
ii) Instructions <strong>to</strong> consultants (ITC)<br />
iii) Terms of Reference (TOR).<br />
iv) List of key positions / professionals required <strong>for</strong> the<br />
assignment<br />
v) Requirement of qualification <strong>and</strong> experience of the firm <strong>and</strong><br />
of the key professional staff.<br />
vi) Criteria of bid evaluation <strong>and</strong> selection procedure<br />
vii) St<strong>and</strong>ard <strong>for</strong>mats <strong>for</strong> technical <strong>and</strong> financial proposal<br />
Letter of Invitation (LOI)<br />
The LOI shall state the intention of the AMR-APARD <strong>to</strong> enter in<strong>to</strong> a<br />
contract <strong>for</strong> the provision of consulting services contains all necessary<br />
in<strong>for</strong>mation that would help the consultants prepare responsive<br />
proposals,. This will also contain in<strong>for</strong>mation on the evaluation process<br />
<strong>and</strong> the evaluation criteria along with weights <strong>and</strong> the minimum<br />
passing score.<br />
St<strong>and</strong>ard <strong>for</strong>mats <strong>for</strong> technical <strong>and</strong> financial proposals<br />
The st<strong>and</strong>ard <strong>for</strong>mats <strong>for</strong> technical proposal include:<br />
i) Letter of Proposal submission<br />
ii)<br />
iii)<br />
iv)<br />
Consultant’s organization <strong>and</strong> experience<br />
Team Composition<br />
Curriculum Vitae of key professionals<br />
The st<strong>and</strong>ard <strong>for</strong>mats <strong>for</strong> financial proposal include:<br />
i) A summary sheet of the cost estimate <strong>to</strong> be quoted by the<br />
consultant.<br />
ii) Remuneration payable.
8<br />
Pre-bid meeting:<br />
The date <strong>and</strong> time <strong>for</strong> such a meeting will be after 15 <strong>to</strong> 30 days<br />
of issue of RFP During this meeting, the scope of assignment,<br />
responsibilities of either parties <strong>and</strong> other details will be clearly<br />
explained <strong>to</strong> the prospective bidders so that there is no ambiguity later<br />
on at the time of submission of technical/financial bids. In case any<br />
significant changes are made in the terms/scope of RFP as a result of<br />
pre bid meeting or otherwise considered necessary by AMR_APARD a<br />
<strong>for</strong>mal Corrigendum <strong>to</strong> RFP will be issued, <strong>to</strong> all short listed<br />
consultants.<br />
Receipt of proposal:<br />
The short listed consultants will be allowed enough time <strong>to</strong><br />
prepare their proposals. The technical <strong>and</strong> financial proposals shall be<br />
submitted at the same time in separate sealed envelopes.. Any<br />
proposal received after the closing time <strong>for</strong> submission of proposals<br />
shall be returned unopened.<br />
Evaluation of Proposals:<br />
The following is the broad criteria on which RFPs will be evaluated<br />
Underst<strong>and</strong>ing of the Objectives of the Assignment: The extent<br />
<strong>to</strong> which the consultants’ technical approach <strong>and</strong> work plan respond <strong>to</strong><br />
the objectives indicated in the TOR.<br />
Completeness <strong>and</strong> Responsiveness: Does the proposal respond<br />
exhaustively <strong>to</strong> all the requirements of the TOR?<br />
Creativity <strong>and</strong> Innovation: Does the proposal suggest any new<br />
approaches <strong>to</strong> the assignment or new methodologies that help achieve<br />
better outcomes?<br />
Clarity: Are the various elements coherent <strong>and</strong> the decision points<br />
well defined?<br />
Efficiency <strong>and</strong> Resource Utilization: Is the staffing schedule<br />
appropriate, that will be deployed on the project.<br />
Flexibility <strong>and</strong> Adaptability: Are the methodology <strong>and</strong> work plan<br />
flexible <strong>and</strong> easy <strong>to</strong> adapt <strong>to</strong> changes that might occur during<br />
implementation of the assignment?
9<br />
Technology: Does the methodology propose the use of appropriate<br />
technologies <strong>and</strong> the adoption of innovative solutions?<br />
Timeliness of Output: Does the proposed activity schedule provide<br />
the requested outputs in a timely manner?<br />
The evaluation of the proposals shall be carried out in two stages in<br />
full con<strong>for</strong>mity with the provisions of the RFP Viz.,<br />
a) the consultant’s relevant experience <strong>for</strong> the assignment,<br />
b) the quality of the methodology proposed,<br />
c) the qualifications of the key staff proposed <strong>and</strong><br />
Each of the responsive technical proposal will be evaluated <strong>for</strong> the<br />
criteria prescribed in the RFP by awarding marks on a score of 100 as<br />
detailed below.<br />
1. Experience of the firm 20<br />
2. Methodology, work plan <strong>and</strong> underst<strong>and</strong>ing of TOR 25<br />
3. Suitability of the Key personnel <strong>for</strong> the assignment 45<br />
4. Capability <strong>for</strong> Transfer of knowledge/ training 10<br />
TOTAL 100<br />
At the end of the technical evaluation process, the AMR_APARD shall<br />
prepare a technical evaluation report of the “quality” of the proposals.<br />
The report shall substantiate the results of the evaluation <strong>and</strong> describe<br />
the relative strengths <strong>and</strong> weaknesses of the proposals. The financial<br />
proposal of only such bidders will be opened which obtain minimum<br />
qualifying marks prescribed <strong>for</strong> the technical proposal<br />
The AMR-APARD will notify the consultants that have successfully<br />
satisfied the qualifying st<strong>and</strong>ard <strong>and</strong> indicate the date <strong>and</strong> time set <strong>for</strong><br />
opening the financial proposals. The financial proposals shall be<br />
opened in presence of the representatives of the technically qualified<br />
consultants who choose <strong>to</strong> attend. The name of the consultant, the<br />
quality scores, <strong>and</strong> the proposed prices shall be read aloud <strong>and</strong><br />
recorded when the financial proposals are opened. The AMR-APARD<br />
shall prepare the minutes of the public opening.<br />
Selection of the winning consultant:<br />
The financial proposals will be ranked in terms of their <strong>to</strong>tal evaluated<br />
cost. The least cost proposal will be ranked as L-1 <strong>and</strong> the next higher<br />
<strong>and</strong> so on will be ranked as L-2, L-3 etc. AMR-APARD will put up a<br />
report on financial evaluation of the technically qualified consultants
10<br />
be<strong>for</strong>e the committee along with the recommendations. The least cost<br />
proposal (L-1) can be approved / invited <strong>for</strong> negotiation <strong>and</strong> <strong>for</strong> final<br />
award of contract The cost of preparing proposals <strong>and</strong> of negotiating a<br />
contract including visits <strong>to</strong> the including site visits, survey etc., <strong>for</strong><br />
submission of proposals, if any is not reimbursable as a direct cost of'<br />
the assignment. The consultants shall hold their proposal valid <strong>for</strong><br />
120 days from the date of submission without change in the personnel<br />
proposed <strong>for</strong> the assignment <strong>and</strong> their proposed price.<br />
Rejection of All Proposals:<br />
AMR-APARD will have the right <strong>to</strong> reject all proposals in whole or in<br />
part in cases where the bids are in deviation <strong>to</strong> the TOR or considered<br />
unreasonably high in cost or if the lowest qualified bidder during<br />
negotiations fails <strong>to</strong> reduce the costs <strong>to</strong> a reasonable level.<br />
General instructions <strong>for</strong> submission of in<strong>for</strong>mation:<br />
1. All in<strong>for</strong>mation called <strong>for</strong> should be furnished against the<br />
relevant columns in the <strong>for</strong>ms. If any in<strong>for</strong>mation is furnished on<br />
a separate sheet, this fact should be mentioned against the<br />
relevant column.<br />
2. The applicants will be required <strong>to</strong> submit the necessary details<br />
with authenticated documents, credentials in support of<br />
Qualifying Requirements.<br />
3. The applicant should sign on each page of the application.<br />
4. The applicant may furnish any additional in<strong>for</strong>mation, which is<br />
deemed necessary <strong>to</strong> establish capability <strong>to</strong> successfully<br />
complete the envisaged project.<br />
5. Any in<strong>for</strong>mation furnished by the applicant found <strong>to</strong> be incorrect<br />
either immediately or at a later date, would render the applicant<br />
liable <strong>to</strong> be debarred from taking up the project.<br />
6. The EOI document in prescribed <strong>for</strong>m duly completed should be<br />
submitted in a sealed cover <strong>to</strong> the Commissioner AMR-APARD<br />
Rajendernagar Hyderabad-500030. on or be<strong>for</strong>e:20/02/2010<br />
7. The sealed cover should be super scribed “EOI – Interest <strong>to</strong><br />
Participate in Preparation of Master Plan”.<br />
8. Interested consultants may note that this is not a request <strong>for</strong><br />
bids. After review <strong>and</strong> scrutiny of Expression of Interest, the<br />
committee constituted <strong>for</strong> these purpose will shortlist suitable<br />
Architects/ Consultants, who will be furnished with the required
11<br />
details / documents indicating requirements <strong>for</strong> submission of<br />
project Proposals along with financial proposals.<br />
9. The committee reserves the right <strong>to</strong> accept or reject any or all<br />
applications at any time without assigning any reason or<br />
incurring any liability <strong>to</strong> the applicants.<br />
****
12<br />
COVERING LETTER FORMAT<br />
FROM:<br />
To:<br />
The Commissioner<br />
AMR-APARD<br />
Rajendernagar<br />
HYDERABAD-500030<br />
Sir,<br />
Sub: Expression of Interest <strong>to</strong> participate <strong>for</strong> selection of<br />
Architect / Consultant <strong>for</strong> state- of- the art Academic cum<br />
Residential Campus of AMR-APARD-Hyderabad.<br />
-:0:-<br />
Having examined the details given in EOI document <strong>for</strong> the above<br />
project, I submit herewith the relevant in<strong>for</strong>mation.<br />
1. I hereby certify that all the statements made <strong>and</strong> in<strong>for</strong>mation<br />
supplied in the accompanying statements are true <strong>and</strong> correct.<br />
2. I have furnished all in<strong>for</strong>mation <strong>and</strong> details necessary <strong>for</strong> EOI<br />
<strong>and</strong> have no further pertinent in<strong>for</strong>mation <strong>to</strong> supply.<br />
3. I also agree that AMR_APARD, or their authorized<br />
representatives can verify our competence <strong>and</strong> general<br />
reputation.<br />
4. I submit the relevant certificates/documents in support of our<br />
suitability, technical know how <strong>and</strong> capability.<br />
Date :<br />
Place :<br />
Signature of<br />
Applicant<br />
with seal
13<br />
APPLICATION FORM FOR SUBMITTING EOI<br />
1. Name <strong>and</strong> Address of the applicant :<br />
2. Telephone No :<br />
3. Fax No :<br />
4. e-mail id :<br />
5. Web site address, if available :<br />
6. Legal status of the applicant :<br />
(Individual/ Proprietary firm)<br />
7. Has the applicant ever ab<strong>and</strong>oned<br />
consultancy job<br />
8. Has the applicant ever been :<br />
debarred from taking up work<br />
in Govt. Department<br />
9. Applicants field of specialization in :<br />
Architecture<br />
10. Detail Bio-data of Technical personnel :<br />
who will be involved in this project<br />
(Furnish individual wise separately )<br />
11. <strong>Details</strong> of three similar projects done :<br />
previously<br />
(Furnish details in a separate statement)<br />
12. <strong>Details</strong> of similar work on h<strong>and</strong> at :<br />
present <strong>and</strong> value of works<br />
(Furnish details in a separate statement)<br />
13. Financial status indicating annual :<br />
turnover <strong>for</strong> the last three years<br />
14. Latest income tax clearance certificate :<br />
15. List of Survey equipments/computer<br />
aided design facilities etc.,<br />
available with the firm. :<br />
16. Per<strong>for</strong>mance certificate from previous clients :<br />
17. Copy of Registration certificate(if any)<br />
18. Award <strong>and</strong> citations received if any :<br />
19. Any other in<strong>for</strong>mation considered necessary but not included above<br />
Signature of the applicant
14<br />
<strong>Details</strong> of main consultant <strong>and</strong> each associates of main consultant<br />
1. Name :<br />
2. Position held :<br />
3. Date of Birth :<br />
4. Years with Firm :<br />
5. Nationality :<br />
6. Membership in professional societies :<br />
7. Key projects done :<br />
8. Area of specialization :<br />
9. Educational qualifications :<br />
10. Awards won (International <strong>and</strong> National) :<br />
11. Employment Record :<br />
Signature of staff Member or<br />