12.11.2014 Views

Climate Change - Cohen Commission

Climate Change - Cohen Commission

Climate Change - Cohen Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

database) and from grey literature (e.g. technical reports by government and fishery<br />

management agencies, theses).<br />

3.3 Key words in the literature search will include but not be limited to effects of climaterelated<br />

variables such as temperature, flow, salinity, pH, currents, primary productivity<br />

and interspecific interactions on Fraser River sockeye survival, behaviour and distribution<br />

in both freshwater and marine habitats and life stages in each environment.<br />

3.4 Literature will also be sought in this compilation related to how Pacific salmon<br />

(especially sockeye salmon) are or may be showing potential adaptive responses to<br />

climate change, or climate related variables, and for how potential mitigation measures<br />

could be taken by salmon management agencies.<br />

Deliverables<br />

4.1 The Contractor will organize a Project Inception meeting to be held prior to June 1,, 2010<br />

in the <strong>Commission</strong> office.<br />

4.2 The primary deliverable is an electronic database that compiles all literature dealing with<br />

climate change and climate related variables on Pacific salmon, with a key focus on<br />

sockeye salmon and where possible, Fraser River sockeye. This database will be provided<br />

to the UBC contractor who is preparing the technical report and analysis of the<br />

documented and projected effects of climate related variables and climate change on<br />

Fraser River sockeye in freshwater and marine environments across all life stages. The<br />

Contractor for the literature compilation will meet regularly with, and provide input,<br />

feedback and guidance to, the UBC Contractor conducting the climate change analysis<br />

and report.<br />

4.3 The electronic database will be delivered to the UBC Contractor and the Scientific<br />

Authority by August 15, 2010,<br />

4.4 The Consultant will make themself available to <strong>Commission</strong> Counsel during hearing<br />

preparation and may be called as a witness.<br />

4.5 The Consultant will participate in a 2-day scientific workshop in late-November, 2010<br />

with the Scientific Advisory Panel and other consultants preparing <strong>Cohen</strong> <strong>Commission</strong><br />

Technical Reports to address cumulative effects and to initiate discussions about the<br />

possible causes of the decline and of the 2009 run failure.<br />

97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!