media manual_low res final
media manual_low res final
media manual_low res final
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
What is the process to get the benefit from<br />
this project?<br />
The project will run as a private business<br />
model and will supply secure electricity to<br />
people when it is needed. However, there<br />
are set of rules which need to be adhered to<br />
get the maximum benefit out of the project.<br />
The community neesd to provide maximum<br />
support to the project as it is for direct benefit<br />
of the village.<br />
First and foremost, in order to enhance the effectiveness, a nominal<br />
joining fee will be charged so that the community can also provide<br />
guarantee to equipment and machinery. Inte<strong>res</strong>ted households<br />
can approach the local office in the village to get connection after<br />
depositing the joining fee and form. Based on the assessment and<br />
requirement, electricity connection will be provided which comes with<br />
an electricity meter.<br />
What all equipment can one run on the connection<br />
one takes?<br />
Whatever machines need to be used by the<br />
customers, they should get prior approval<br />
or agreement with the operators, BASIX and the village electrification<br />
committees. There will be technical people to advice on what sort of<br />
machinery can be used.<br />
Is there any risk in terms of electrical shock?<br />
There are very less chances of severe<br />
electricity shocks as these systems are <strong>low</strong><br />
voltage and not high voltage, and as part of<br />
the installation process we will be giving safety demonstrations<br />
and ensure equipment used are shock-proof. Also, there will be<br />
technical people in the village who will be <strong>res</strong>ponsible for handling<br />
these situations.<br />
Who will be <strong>res</strong>ponsible for such risk?<br />
The company will not be <strong>res</strong>ponsible for<br />
any person being impacted by shocks or<br />
accidents, as it would be the fault of the<br />
person. The company will only be <strong>res</strong>ponsible for the successful<br />
operation of the plant and ensure it provides the agreed quantity of<br />
energy.<br />
Who will be <strong>res</strong>ponsible for technical assistance?<br />
The operating company, BASIX, will be will take care of any technical aspects that may arise. BASIX will be<br />
<strong>res</strong>ponsible for the complete system and <strong>res</strong>ponsible for all the operation and maintenance work.<br />
What is the system or technology of this project?<br />
Currently, the project will be using solar supply to the village and it will use latest technology in terms of wi<strong>res</strong><br />
photovoltaic technology to produce energy to and metering system.<br />
MEDIA MANUAL | Micro-grid in Dharnai<br />
23