13.11.2014 Views

media manual_low res final

media manual_low res final

media manual_low res final

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

What is the process to get the benefit from<br />

this project?<br />

The project will run as a private business<br />

model and will supply secure electricity to<br />

people when it is needed. However, there<br />

are set of rules which need to be adhered to<br />

get the maximum benefit out of the project.<br />

The community neesd to provide maximum<br />

support to the project as it is for direct benefit<br />

of the village.<br />

First and foremost, in order to enhance the effectiveness, a nominal<br />

joining fee will be charged so that the community can also provide<br />

guarantee to equipment and machinery. Inte<strong>res</strong>ted households<br />

can approach the local office in the village to get connection after<br />

depositing the joining fee and form. Based on the assessment and<br />

requirement, electricity connection will be provided which comes with<br />

an electricity meter.<br />

What all equipment can one run on the connection<br />

one takes?<br />

Whatever machines need to be used by the<br />

customers, they should get prior approval<br />

or agreement with the operators, BASIX and the village electrification<br />

committees. There will be technical people to advice on what sort of<br />

machinery can be used.<br />

Is there any risk in terms of electrical shock?<br />

There are very less chances of severe<br />

electricity shocks as these systems are <strong>low</strong><br />

voltage and not high voltage, and as part of<br />

the installation process we will be giving safety demonstrations<br />

and ensure equipment used are shock-proof. Also, there will be<br />

technical people in the village who will be <strong>res</strong>ponsible for handling<br />

these situations.<br />

Who will be <strong>res</strong>ponsible for such risk?<br />

The company will not be <strong>res</strong>ponsible for<br />

any person being impacted by shocks or<br />

accidents, as it would be the fault of the<br />

person. The company will only be <strong>res</strong>ponsible for the successful<br />

operation of the plant and ensure it provides the agreed quantity of<br />

energy.<br />

Who will be <strong>res</strong>ponsible for technical assistance?<br />

The operating company, BASIX, will be will take care of any technical aspects that may arise. BASIX will be<br />

<strong>res</strong>ponsible for the complete system and <strong>res</strong>ponsible for all the operation and maintenance work.<br />

What is the system or technology of this project?<br />

Currently, the project will be using solar supply to the village and it will use latest technology in terms of wi<strong>res</strong><br />

photovoltaic technology to produce energy to and metering system.<br />

MEDIA MANUAL | Micro-grid in Dharnai<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!