16.11.2014 Views

Department of Urban Development, Housing and

Department of Urban Development, Housing and

Department of Urban Development, Housing and

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

document/ working drawings <strong>of</strong> the project to<br />

execute at site.<br />

4. Services to be provided during the execution <strong>of</strong> work (if<br />

required under scope <strong>of</strong> work) :-<br />

(i) Visit the site <strong>of</strong> work as <strong>and</strong> when necessary, subject<br />

to minimum one visit per month, to clarify <strong>and</strong><br />

interpret the drawings <strong>and</strong> specification that may be<br />

necessary <strong>and</strong> attend conferences <strong>and</strong> meetings as<br />

<strong>and</strong> when required <strong>and</strong> to ensure that the scheme<br />

proceeds generally in accordance with conditions <strong>of</strong><br />

contract <strong>and</strong> furnish a report on observations <strong>and</strong><br />

recommendation.<br />

(ii) Maximum time for completion <strong>of</strong> project would be<br />

as per the requirement <strong>of</strong> the project.<br />

(iii) On completion <strong>of</strong> the scheme, furnish a report stating<br />

therein guidelines for phased construction <strong>and</strong><br />

instruction for the maintenance <strong>of</strong> the property<br />

including painting, outer finishes, l<strong>and</strong>scaping etc.<br />

(iv) Prepare all the drawings required for legal<br />

documentation (especially for execution <strong>of</strong><br />

agreement purpose) <strong>and</strong> all such drawings required<br />

by the local body.<br />

(v) Graphic signages<br />

(vi) Furnish PERT/CPM bar chart <strong>of</strong> all the project<br />

components before commencing the work.<br />

Note: a) The Designs <strong>of</strong> all the items shall be as per<br />

ISI/IRC/NBC/Other applicable code.<br />

b) All specialized worked shall be got done through<br />

pr<strong>of</strong>essional experts in the respective fields.<br />

2.4.2 PROFESSIONAL FEES AND PAYMENT SCHEDULE<br />

Fee may be quoted on the basis <strong>of</strong> cost <strong>of</strong> the project.<br />

The payment schedule shall be as follows or as may be decided on<br />

mutually agreed terms between consultant <strong>and</strong> local body.<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!