FRAMEWORK FOR ACTION ON INFRASTRUCTURAL DEVELOPMENT AND PPPS<br />
(ii) Public Transport<br />
Mode Project Indicative Completi<strong>on</strong> Timetable<br />
LUAS<br />
Lines A and C (Tallaght to end 2002<br />
C<strong>on</strong>nolly Stati<strong>on</strong>)<br />
Line B (Sandy<str<strong>on</strong>g>for</str<strong>on</strong>g>d to St. Stephens<br />
Green)<br />
Lines D and E (St.Stephens Green<br />
to Dublin Airport)<br />
Bus Project Additi<strong>on</strong>al bus capacity (275<br />
buses)<br />
Local Bus Networks (11 locati<strong>on</strong>s,<br />
80 buses)<br />
Rail Project<br />
mid 2003<br />
decide indicative timetable by end<br />
1999<br />
phased provisi<strong>on</strong> 2000-2006<br />
Phase 1 (7 locati<strong>on</strong>s): end 2000<br />
Phase 2 (4 locati<strong>on</strong>s): end 2003<br />
5 New Quality Bus Corridors Phased provisi<strong>on</strong> to 2006<br />
Additi<strong>on</strong>al DART rolling stock (46<br />
cars)<br />
16 by end 2002,<br />
30 by end 2006<br />
Additi<strong>on</strong>al Diesel Railcars (58) phased provisi<strong>on</strong> to 2006<br />
Upgrade Greyst<strong>on</strong>es to Arklow line end 2001<br />
Resignal and upgrade Howth to<br />
Barrow Street<br />
Upgrade Kildare to C<strong>on</strong>nolly line<br />
(including Phoenix Park tunnel)<br />
New stati<strong>on</strong>s and l<strong>on</strong>ger plat<str<strong>on</strong>g>for</str<strong>on</strong>g>ms<br />
at existing stati<strong>on</strong>s<br />
Suburban rail development<br />
programme (Dublin Airport, Navan,<br />
etc.)<br />
Integrati<strong>on</strong> Park & Ride (8 sites, 3,700<br />
spaces)<br />
Public transport interchange (19<br />
locati<strong>on</strong>s)<br />
to be decided in c<strong>on</strong>text <strong>of</strong><br />
c<strong>on</strong>sultants report<br />
end 2002<br />
Integrated ticketing and fares end 2002<br />
phased provisi<strong>on</strong> to end 2003<br />
projects and indicative timetable by<br />
end 1999<br />
phased provisi<strong>on</strong> to 2005<br />
phased provisi<strong>on</strong> to end 2002<br />
The Implementati<strong>on</strong> <strong>of</strong> transport infrastructure projects in the greater Dublin Area will need to<br />
be accompanied by a demand management strategy, the details <strong>of</strong> which will be developed<br />
by the Dublin Transportati<strong>on</strong> Office.<br />
All new buses, railcars, light rail vehicles and stati<strong>on</strong>s provided under the public transport<br />
programme <str<strong>on</strong>g>for</str<strong>on</strong>g> the Greater Dublin Area will be accessible to mobility impaired and disabled<br />