19.11.2014 Views

Framework for Action on - Department of Taoiseach

Framework for Action on - Department of Taoiseach

Framework for Action on - Department of Taoiseach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DEPARTMENT OF THE TAOISEACH<br />

FRAMEWORK FOR ACTION ON INFRASTRUCTURAL DEVELOPMENT AND PPPS<br />

(ii) Public Transport<br />

Mode Project Indicative Completi<strong>on</strong> Timetable<br />

LUAS<br />

Lines A and C (Tallaght to end 2002<br />

C<strong>on</strong>nolly Stati<strong>on</strong>)<br />

Line B (Sandy<str<strong>on</strong>g>for</str<strong>on</strong>g>d to St. Stephens<br />

Green)<br />

Lines D and E (St.Stephens Green<br />

to Dublin Airport)<br />

Bus Project Additi<strong>on</strong>al bus capacity (275<br />

buses)<br />

Local Bus Networks (11 locati<strong>on</strong>s,<br />

80 buses)<br />

Rail Project<br />

mid 2003<br />

decide indicative timetable by end<br />

1999<br />

phased provisi<strong>on</strong> 2000-2006<br />

Phase 1 (7 locati<strong>on</strong>s): end 2000<br />

Phase 2 (4 locati<strong>on</strong>s): end 2003<br />

5 New Quality Bus Corridors Phased provisi<strong>on</strong> to 2006<br />

Additi<strong>on</strong>al DART rolling stock (46<br />

cars)<br />

16 by end 2002,<br />

30 by end 2006<br />

Additi<strong>on</strong>al Diesel Railcars (58) phased provisi<strong>on</strong> to 2006<br />

Upgrade Greyst<strong>on</strong>es to Arklow line end 2001<br />

Resignal and upgrade Howth to<br />

Barrow Street<br />

Upgrade Kildare to C<strong>on</strong>nolly line<br />

(including Phoenix Park tunnel)<br />

New stati<strong>on</strong>s and l<strong>on</strong>ger plat<str<strong>on</strong>g>for</str<strong>on</strong>g>ms<br />

at existing stati<strong>on</strong>s<br />

Suburban rail development<br />

programme (Dublin Airport, Navan,<br />

etc.)<br />

Integrati<strong>on</strong> Park & Ride (8 sites, 3,700<br />

spaces)<br />

Public transport interchange (19<br />

locati<strong>on</strong>s)<br />

to be decided in c<strong>on</strong>text <strong>of</strong><br />

c<strong>on</strong>sultants report<br />

end 2002<br />

Integrated ticketing and fares end 2002<br />

phased provisi<strong>on</strong> to end 2003<br />

projects and indicative timetable by<br />

end 1999<br />

phased provisi<strong>on</strong> to 2005<br />

phased provisi<strong>on</strong> to end 2002<br />

The Implementati<strong>on</strong> <strong>of</strong> transport infrastructure projects in the greater Dublin Area will need to<br />

be accompanied by a demand management strategy, the details <strong>of</strong> which will be developed<br />

by the Dublin Transportati<strong>on</strong> Office.<br />

All new buses, railcars, light rail vehicles and stati<strong>on</strong>s provided under the public transport<br />

programme <str<strong>on</strong>g>for</str<strong>on</strong>g> the Greater Dublin Area will be accessible to mobility impaired and disabled<br />

people.<br />

- 13 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!