Charter Court Reception <strong>Refurbishment</strong> Apr 09<br />

1.00 STRIP OUT AND PREPARATION WORKS<br />

1.01 Install temporary reception desk to secondary entrance. Adequately screen off<br />

main reception to protect the building users from the construction works but<br />

maintain access to the stairwell and lift cars.<br />

1.02 Isolate all services to the existing reception desk and relocate all required<br />

services to temporary reception desk for the duration of the project.<br />

1.03 Strip out required floor finishes to the reception and lift cars as identified on<br />

drawing 26289/Apr09/Dwg01. Also allow for the strip out of any underlying<br />

redundant floor finishes. Fully prepare floor screed to receive new floor<br />

finishes.<br />

1.04 Include and E/O amount for the application of a self levelling screed to the floor<br />

if required.<br />

1.05 Strip out existing wall finishes as identified on drawing 26289/Apr09/Dwg02.<br />

Fully prepare wall surface to receive new painted finish.<br />

1.06 Include and E/O amount for re-skimming walls following strip-out.<br />

1.07 Remove and dispose of existing reception desk complete. Make good any<br />

resulting damage to floor and wall finishes.<br />

1.08 Remove and dispose of existing signage and artwork in the reception. Make<br />

good any resulting damage to wall finishes.<br />

1.09 Contractor to provide Specialist Mechanical Consultation Advice to ascertain if<br />

directional air vents to reception ceiling can be removed without adversely<br />

affecting the reception air quality.<br />

1.10 Cap off air vents and make good ceiling (subject to Contractor's M&E<br />

Consultant's advice and details).<br />

1.11 Remove redundant light fittings, associated wiring and controls as identified in<br />

26289/Apr09/Dwg03 and 26289/Apr09/Dwg04. Re-plaster resulting holes and<br />

make good ceiling in preparation for redecoration.<br />

1.12 Remove and dispose of existing chairs and table to reception seating area.<br />

2.00 FLOORING<br />

2.01 Install new 'Plynol' sheet floor covering to lift cars and behind reception desk<br />

as shown in 26289/Apr09/Dwg01. Allow for all necessary trims and adhesives,<br />

etc as per the manufacturers recommendations.<br />

2.02 Install new 'Interface - Fast Forward' carpet tiles to the corridor areas as shown<br />

in 26289/Apr09/Dwg01. Allow for all necessary trims, adhesives, etc as per<br />

the manufacturers recommendations.<br />

2.03 Install new 'Swedecor' ceramic floor tiles to the main reception area as shown<br />

in 26289/Apr09/Dwg01. Allow for all necessary trims, adhesives, grouting, etc<br />

as per the manufacturers recommendations.<br />

1 26289/Apr09/EmployReqrmnts