2009 Refurbishment Works - Home - Start
2009 Refurbishment Works - Home - Start
2009 Refurbishment Works - Home - Start
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Charter Court Reception <strong>Refurbishment</strong> Apr 09<br />
2.04 Install new Barrier Matting as specified in 26289/Apr09/Dwg01 to the main<br />
entrance.<br />
3.00 CEILINGS<br />
3.01 Carefully remove existing mineral fibre ceiling tiles identified in<br />
26289/Apr09/Dwg03 and apply proprietary cleaning system to remove all<br />
surface soiling and stains. Allow for deep clean of existing grid and associated<br />
trims. Carefully reinstate ceiling tiles.<br />
3.02 Fully prepare and redecorate plaster ceilings in reception with 2 coats Brilliant<br />
White Dulux Diamond Matt Emulsion.<br />
4.00 LIGHTING<br />
4.01 Supply and install new Zumtobel light fittings as shown on drawing<br />
26289/Apr09/Dwg04. Contractor to provide Specialist Lighting Consultation<br />
design and advice and confirm that all requirements in relation to Lux levels<br />
and Part L of the Building Regulations have been met.<br />
4.02 Supply and install new feature pendant light fittings above reception desk and<br />
seating area as shown on drawing 26289/Apr09/Dwg03. Feature pendant<br />
fittings to be controlled on separate switches.<br />
4.03 Clean all original light fittings and rebulb.<br />
4.04 Supply and install strip feature lighting to reception desk as shown on drawing<br />
26289/Apr09/Dwg07. Separate switch controls required.<br />
5.00 JOINERY / FURNITURE<br />
5.01 Supply & install new reception desk as shown in drawing 26289/Apr09/06 and<br />
26289/Apr09/07.<br />
5.02 Allow a provisional sum of £5,000 for the supply cupboard behind reception<br />
desk (design required)<br />
5.03 Supply 4no new chairs and 1no new table to seating areas as specified on<br />
Drawing 26289/Apr09/05.<br />
6.00 ELECTRICAL SERVICES<br />
6.01 Reinstate all services to new reception desk including data, small power,<br />
telecoms, etc. Supply new stainless steel switching plates to reception desk<br />
services.<br />
6.02 Supply O&M documentation detailing all alterations to the electrical services<br />
including switching controls for light fittings, small power, distribution boards,<br />
etc.<br />
2 26289/Apr09/EmployReqrmnts