19.11.2014 Views

2009 Refurbishment Works - Home - Start

2009 Refurbishment Works - Home - Start

2009 Refurbishment Works - Home - Start

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Lighting to Double Height Space<br />

Remove existing fittings, re-plaster and make good.<br />

Miros System By Zumtobel<br />

System whereby the light source can be located to the front face of the balcony bulkhead and<br />

light is directed up to reflectors on the ceiling.<br />

This provides an indirect wash of light to the atrium space and allows for easy access to the<br />

light source for maintenance.<br />

Contact: Tony Smith 07971 382 747<br />

*NB specialist lighting consultant to advise on<br />

all Part L requirements and Lux level<br />

requirements<br />

26289/Apr09/Dwg04<br />

Charter Court Reception, Slough<br />

Date: 16 th March <strong>2009</strong> O:\2609\G1\powerpoints\2609-RL-Charter Court Reception-Concept updated 090316.ppt

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!