Untitled - Zorlu Enerji
Untitled - Zorlu Enerji
Untitled - Zorlu Enerji
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Investments<br />
The first power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is the dual fuel (natural gas<br />
and liquid fuel) cogeneration<br />
facilities in Lüleburgaz. Power<br />
plant consists of two x 7 MW EGT<br />
Tempest and 1 x MW gas turbine<br />
unit (GE, LM 6000 PC). In<br />
November 2000, 9 MW reverse<br />
pressure gas turbine started to be<br />
operated and steam production<br />
capacity reached to 162 t/h.<br />
The second power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is again a dual fuel<br />
combined cycle power plant in<br />
Bursa Organized Industrial Zone.<br />
Power plant consists of 1 x 26<br />
MW gas turbine (GE, LM2500+)<br />
with 9 MW steam turbine and 1 x<br />
43 MW gas turbine (GE, LM6000<br />
PC) with 12 MW steam turbine.<br />
The third power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is also a dual fuel combined<br />
cycle power plant in Ankara<br />
Chamber of Commerce First<br />
Organized Industrial Zone. Power<br />
plant consists of 1 x 39.7 MW gas<br />
turbine (GE, LM6000 PC) with<br />
10.6 MW steam<br />
turbine.<br />
On 21 March,<br />
2003, EPDK<br />
granted<br />
this power plant<br />
an autoproducer<br />
license for 10<br />
years period.<br />
<strong>Zorlu</strong> <strong>Enerji</strong> is the first company<br />
awarded with this license, our<br />
power plant started operation in<br />
second quarter of 2003.<br />
The fourth power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is a combined cycle dual<br />
fuel power plant in Kayseri First<br />
Organized Industrial Zone. Power<br />
plant consists of 3 x 42.5 MW gas<br />
turbine (GE, LM6000 PC) and<br />
33.5 MW steam turbine.<br />
The fifth power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is a cogeneration power<br />
plant built for Yalova ‹pek Ka¤›t.<br />
This power plant is at a capacity<br />
of 16 MW electricity and 20 t/h<br />
steam, consists of 1 Wartsila<br />
engine, 1 Turbo mach gas turbine<br />
and 1 excess heat boiler.<br />
The sixth power plant of <strong>Zorlu</strong><br />
<strong>Enerji</strong> is cogeneration power plant<br />
constructed for Kayseri Birlik<br />
Mensucat. Power plant has the<br />
capacity of 7.2 MW electricity and<br />
15 t/h steam, with 1 Turbo mach<br />
gas turbine and 1 excess heat<br />
boiler. Powerplant is in<br />
commercial operation since the<br />
second quarter of 2006.<br />
(See Table 1)<br />
26 <strong>Zorlu</strong> <strong>Enerji</strong> 2006 Annual Report