21.11.2014 Views

9 Bioclimatic Designs - Low Carbon Materials Processing

9 Bioclimatic Designs - Low Carbon Materials Processing

9 Bioclimatic Designs - Low Carbon Materials Processing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Winter-time ventilation strategy.<br />

1 = Dampers at the intake, 2 = dampers and heating elements at the perimeter of the<br />

light well base, 3 = fully glazed light well base, 4 = light well fills with warmed air, 5 =<br />

air enters each floor through a bottom-hung opening window across a secondary heat<br />

source, 6 = acoustically treated transfer ducts in deep partitions at high and low levels,<br />

7 = first and second floor exits coupled, 8 = third and fourth floor exits coupled, 9 = fifth<br />

floor dedicated vent stack, 10 = street-side spaces exhaust into the stair hall, double<br />

façade, 11 = stair hall exhaust via the ‘breathing parapet’, 12 = third floor dedicated<br />

exhaust, 13 = fourth floor dedicated exhaust, 14 = lower ground floor is exhausted by<br />

a dedicated full height stack

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!