22.11.2014 Views

AB-513, Repair Alteration Requirements - ABSA

AB-513, Repair Alteration Requirements - ABSA

AB-513, Repair Alteration Requirements - ABSA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the pressure equipment safety authority<br />

Any contracted inspection services must be provided by an organization that has an<br />

Alberta CAP per PESR section 11(2) and <strong>AB</strong>SA authorization for the scope of repair<br />

inspection that is to be done. This scope is defined on form <strong>AB</strong>-515a. Note: <strong>AB</strong>-506<br />

Appendix A provides guidance as to when an inspection company must hold a CAP.<br />

<strong>AB</strong>-512 and <strong>AB</strong>-515 establish the quality management system requirements for<br />

owner-users and inspection companies.<br />

Appendix 1 shows the scope of inspection and certification of repairs and alterations<br />

of boilers and pressure vessels that can be done by an owner-user and what must be<br />

inspected and certified by <strong>AB</strong>SA.<br />

7.0 NOTIFICATION AND AUTHORIZATION OF REPAIR OR ALTERATION<br />

All repairs and alterations must be authorized by a competent person (e.g. Inspector),<br />

designated by the owner prior to the start of work.<br />

7.1 Notification to <strong>AB</strong>SA for <strong>Repair</strong>s and <strong>Alteration</strong>s to Pressure Vessels and Boilers<br />

PESR section 40(3) states that no repair shall be undertaken without the prior<br />

agreement of a Safety Codes Officer and 40(6) requires that the owner must notify an<br />

<strong>AB</strong>SA Safety Codes Officer reasonably in advance of each repair or alteration to a<br />

boiler, fired-heater pressure coil, thermal liquid heating system, or pressure vessel.<br />

When repairs are inspected under an owner-user s CAP, notification may be limited to<br />

ensuring that the <strong>AB</strong>SA Inspector is made aware of the repair.<br />

Note, the repair organization is required, under the terms of their Alberta quality<br />

program Certificate of Authorization Permit, to notify an <strong>AB</strong>SA Inspector prior to the<br />

start of each repair or alteration that they will be doing.<br />

Notification of repairs and alterations will assist <strong>AB</strong>SA in ensuring that all repairs and<br />

alterations are done in accordance with <strong>AB</strong>-<strong>513</strong>, and to complete their required<br />

inspection and certification activities when the inspection is not covered under the<br />

scope of an owner-user s CAP.<br />

All alterations to boilers and pressure vessels and all repairs that are not inspected<br />

and certified by an owner-user must be authorized, inspected and certified by an<br />

<strong>AB</strong>SA Inspector. Refer to Section 11 of this document.<br />

The Appendix 1 flowchart illustrates responsibilities for notification, inspection and<br />

certification of repairs and alterations.<br />

Issued 2012-12-13 <strong>AB</strong>-<strong>513</strong> Edition 2, Rev 1 Page 12 of 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!