Payment Periods in Europe - Euler Hermes
Payment Periods in Europe - Euler Hermes
Payment Periods in Europe - Euler Hermes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Economic Outlook n° 1182 | Special Dossier | <strong>Payment</strong> periods<br />
<strong>Euler</strong> <strong>Hermes</strong><br />
Aeronautic components:<br />
stability <strong>in</strong> payment periods –<br />
sign of a healthy sector<br />
The sample on which we base our conclusions <strong>in</strong><br />
this study is drawn for civil and military aeronautics<br />
activities <strong>in</strong> the different countries exam<strong>in</strong>ed.<br />
▶ What sets this sector apart is the extremely high<br />
level of concentration among aeronautics constructors<br />
both <strong>in</strong> <strong>Europe</strong> and the United States, whose<br />
levels of activity set the tone for subcontract<strong>in</strong>g. At<br />
the end of the cha<strong>in</strong>, civil aviation constructors (bus<strong>in</strong>ess<br />
or commercial aircraft, essentially <strong>in</strong> the zones<br />
exam<strong>in</strong>ed) benefit from advances paid by the airl<strong>in</strong>es<br />
order<strong>in</strong>g aircraft, staged from the sign<strong>in</strong>g of contracts<br />
until delivery, <strong>in</strong> order to f<strong>in</strong>ance the production cycle<br />
(with very high <strong>in</strong>ventories and exposure). Moreover,<br />
at times there are payments on account, higher upstream<br />
<strong>in</strong> the cha<strong>in</strong>, help<strong>in</strong>g to ease cash flows.<br />
With the notable exception of<br />
Spa<strong>in</strong>, the last three years have<br />
seen relative stability <strong>in</strong> payment<br />
periods.<br />
▶ France, however, seems to show the impact of the<br />
entry <strong>in</strong>to force of the LME, with supplier payment<br />
periods fall<strong>in</strong>g from 77 days <strong>in</strong> 2008 to 49 days <strong>in</strong><br />
2010, while <strong>in</strong> the United States, 2008 reflected the<br />
destabilisation <strong>in</strong> the sector brought about by the<br />
long strike at Boe<strong>in</strong>g. This overall resistance, <strong>in</strong> the<br />
face of the difficult economic situation that affected<br />
all <strong>in</strong>dustrial sectors, is the sign of the excellent health<br />
of the commercial aviation sector, buoyed by nearly<br />
constantly <strong>in</strong>creas<strong>in</strong>g production, by contrast with<br />
bus<strong>in</strong>ess aviation, which was seriously affected by fall<strong>in</strong>g<br />
production and order books over the same<br />
period.<br />
▶ Not contradict<strong>in</strong>g the dist<strong>in</strong>ction between<br />
Northern and Southern <strong>Europe</strong>, already well demonstrated<br />
<strong>in</strong> many sectors, and despite the convergence<br />
<strong>in</strong> the sector towards a restricted number of customers,<br />
the longest payment periods are <strong>in</strong> Italy (with<br />
supplier payment periods of 60 days’revenue <strong>in</strong><br />
2010) and especially Spa<strong>in</strong> (131 days <strong>in</strong> 2010). This<br />
situation is grounded <strong>in</strong> local practices but is also<br />
clearly due to the domestic economic environment<br />
– particularly <strong>in</strong> the case of the big lengthen<strong>in</strong>g <strong>in</strong><br />
Spa<strong>in</strong>, where supplier payment periods doubled between<br />
2008 and 2010. Operators <strong>in</strong> both these countries<br />
are thus exposed to penalis<strong>in</strong>g consequences<br />
from the approach<strong>in</strong>g application of the <strong>Europe</strong>an<br />
Directive. ▣<br />
Client payment periods: aeronautic components<br />
Client payment periods <strong>in</strong> days’ revenue, 2010<br />
Supplier payment periods <strong>in</strong> days’ revenue, 2010<br />
200<br />
150<br />
100<br />
50<br />
160<br />
140<br />
120<br />
100<br />
80<br />
60<br />
40<br />
20<br />
0<br />
IT<br />
67<br />
IT<br />
60<br />
GB<br />
40<br />
ES<br />
131<br />
FR<br />
65<br />
FR<br />
49<br />
US<br />
42<br />
ES<br />
153<br />
DE<br />
20<br />
Change<br />
0<br />
-30% -10% 10% 30% 50%<br />
Source: <strong>Euler</strong> <strong>Hermes</strong><br />
Supplier payment periods: aeronautic components<br />
-40% -30% -20% -10% 0% 10% 20% 30% 40%<br />
Source: <strong>Euler</strong> <strong>Hermes</strong><br />
GB<br />
44<br />
US<br />
67<br />
DE<br />
51<br />
Change<br />
25