Water Main Construction - the City of Rockford
Water Main Construction - the City of Rockford
Water Main Construction - the City of Rockford
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Erosion and Sediment Control<br />
• All <strong>City</strong> projects must follow IEPA ILR10 General <strong>Construction</strong><br />
Permit & Illinois Urban Manual<br />
• <strong>City</strong> projects must implement Best Management Practices<br />
(BMP’s) in prepared plans and specifications.<br />
• Weekly inspections <strong>of</strong> all BMP’s are required by <strong>the</strong> field<br />
inspector and/or contractor.<br />
• Inspection must be completed within 24 hours <strong>of</strong> a<br />
precipitation event <strong>of</strong> ½” or more. Rain OR Snow<br />
equivalent.<br />
• All Erosion & Sediment Control inspection reports and o<strong>the</strong>r<br />
related documents must be submitted to <strong>the</strong> <strong>City</strong> <strong>of</strong><br />
<strong>Rockford</strong>.