26.11.2014 Views

Water Main Construction - the City of Rockford

Water Main Construction - the City of Rockford

Water Main Construction - the City of Rockford

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Erosion and Sediment Control<br />

• Projects with Land Disturbance <strong>of</strong> one (1) acre or more<br />

- Requires SWPPP documents to be located on site and<br />

updated for current construction activities<br />

- Inspections are <strong>the</strong> same as previously discussed.<br />

Inspections must continue weekly until <strong>the</strong> construction site<br />

is deemed stabilized.<br />

- Once site is deemed “stabilized”, a Notice <strong>of</strong> Termination<br />

(NOT) must be submitted to <strong>the</strong> IEPA to notify <strong>the</strong>m <strong>of</strong><br />

construction completion.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!