Water Main Construction - the City of Rockford
Water Main Construction - the City of Rockford
Water Main Construction - the City of Rockford
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 1.61 - Requirements for<br />
Unscheduled <strong>Water</strong> <strong>Main</strong> Valve Shut Off:<br />
a) In <strong>the</strong> event <strong>the</strong> Contractor must perform an<br />
unscheduled water main valve shut <strong>of</strong>f; <strong>the</strong><br />
Contractor shall notify <strong>the</strong> <strong>Water</strong> Division<br />
Operations Center Operator (987-5712) as soon<br />
as possible.