26.11.2014 Views

Water Main Construction - the City of Rockford

Water Main Construction - the City of Rockford

Water Main Construction - the City of Rockford

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 1.61 - Requirements for<br />

Unscheduled <strong>Water</strong> <strong>Main</strong> Valve Shut Off:<br />

a) In <strong>the</strong> event <strong>the</strong> Contractor must perform an<br />

unscheduled water main valve shut <strong>of</strong>f; <strong>the</strong><br />

Contractor shall notify <strong>the</strong> <strong>Water</strong> Division<br />

Operations Center Operator (987-5712) as soon<br />

as possible.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!