1.01 SUMMARY<br />
A. Work Included:<br />
1. New brick sidewalk in areas designated Oil Plans.<br />
2. Remove and reset existing brick sidewalk on new concrete pad in areas<br />
designated on Plans.<br />
B. Related work:<br />
1. Other sections of the Specifications, not referenced below, shall also apply<br />
to the extent required for proper perfOnlHlnCe of this work.<br />
2. Secfion 02220: ExcavClting, Filling and Grading<br />
3. Seciioll 02533: Roadw(~v Concrete<br />
References:<br />
I. American Society for Testing and Materials:<br />
a. ASTM C-270; Standard Specification for Mortar for Unit<br />
Masonry.<br />
c. AS'T'M C-902; Standard Specification for Pedestrian and Light<br />
Traffic Paving Brick<br />
d. ASTM D-1752; Standard Specification 1'01' [)rcl()l'Jlled Sponge<br />
Rubber and Cork Expansion Joint Fillers for Concrete Paving and<br />
Structural Construction.<br />
1.02 SUBMITI'ALS<br />
A. Comply with provisions of S'ectiotl OJ 330, S'hop Drawings. Product Data and<br />
5,'amples.<br />
MOORESTOWN TWI'.<br />
Contrnct No. 2012-7<br />
}\-0730-0044-000/S20S6<br />
September 10. 2012<br />
Brick Unit Paving<br />
<strong>02522</strong>-1
B. Manufacturer's product data:<br />
J. Complete materials list of all materials proposed to be furnished and<br />
installed under this section.<br />
2. Specifications and other data required that demonstrate compliance with<br />
the specified requirements.<br />
3. Submit sieve analyses for grading of bedding and joint sand.<br />
Samples:<br />
I. Submit two (2) full size samples of brick unit pavers proposed for usc.<br />
1.03 QUALITY A~SURANCE<br />
A. Qualil~cations of manufacturer:<br />
I .<br />
Products used in the work 0 f this section sha II be produced by<br />
manufacturers regularly engaged in the manufacture of similar items and<br />
with a history of successful production acceptable to the ENGINEER.<br />
B. Quajifications ofwol'kmcn:<br />
I. Provide at least one person who shall be prcscnt at aU times during<br />
execution of the work ofthis section, who shall be thoroughly familiar<br />
with the specified requirements and the materials and methods needed flir<br />
their execution, and who shall direct all work: performed tmder this<br />
section.<br />
2. Provide adequate numbers ofworkmcn skilled in the necessary eratls and<br />
properly informed ofthe method and materials to be used.<br />
3. In acceptance or rejection o1't11c work of this section, the ENGINEER. \vitl<br />
make no allowance f(x lack of skill on the part of workmen.<br />
C. Basis of acceptance:<br />
I. The manuf~lctUl'Cr's installation instructions will provide the basis for<br />
acceptance or rejection ofthe work performed under this section.<br />
ivlOORESTOWN "('\Vf'.<br />
Contract No. 20 J 2-7<br />
;\-()730.... 0044-000/S20S6<br />
September 10,2012<br />
Brick Unit P
1.04 DELIVERY, STORAGE AND HANDLING<br />
A. Store brick off ground and cover to protect from elements.<br />
B. Deliver aggregates to and store in segregated areas to prevent mixing with foreign<br />
materials.<br />
J .05<br />
PROJECT CONDITIONS<br />
A. Environmental requirements:<br />
I. Do not place concrete or brick during rain, snow or when atmospheric<br />
temperature is at or below 36 degrees F. (36F), or when conditions are<br />
otherwise unfavorable as determined by the ENGINEER.<br />
2. Do not install sand and pavers over frozen base materials.<br />
3. Do no! install frozen or saturated sand.<br />
<strong>PA</strong>RT 2 -<br />
2.01 MATERIALS<br />
A. Concrete:<br />
I. Concrete for setting bed shall conform to Section 02533, Roadway<br />
Concrete.<br />
B. Joint filler:<br />
1. Exposed: "Scaltite Sponge Rubber" expansion joint material by 'vV. R.<br />
Meadows or eClual conforming to ASTM D-I Type l.<br />
C<br />
Reinforcing: Conforming to ,')'ection ()2533. Roadway C'ot/crete.<br />
D. Brick: Paving brick conforming to ASTM C-902, Class<br />
selected.<br />
Type 1. Color as<br />
E. Sand: Fine Aggregate conf(xming to Subsection 901.06.02 of the Standard<br />
fications.<br />
MOORESTOWN TWP.<br />
Contract No. 2012-7<br />
1\-0730-0044-000/5205(;<br />
September 10,2012<br />
Briek Unit Paving.<br />
<strong>02522</strong>-3
F. Aluminum Edge Restraint:<br />
1.<br />
Acceptable manufacturers:<br />
a. Sure-lac Edging Corporation<br />
494 64th Street<br />
Holland, MI 49423<br />
Phone (800) 787-3562<br />
Fax (616) 392-5134<br />
b. Perm aloe Corporation<br />
/3505 Barry Street<br />
Holland, Michigan 49424 USA<br />
(800) 356-9660 (US & Canada)<br />
(616) 399-9600<br />
Fax (616) 399-9770<br />
Website: ~~)ermaloc.com<br />
c. Or equivalent.<br />
2.<br />
Materials:<br />
a. Edging shaH be manufactured from mill finish, 6()63, T-50r6063,<br />
T-6 extruded aluminum alloy. M(ltcrial shall be 2W' high with 45°,<br />
"V" cutOll!S in b(lse along with recessed stake pockets every 4<br />
inches.<br />
b. Sections shaLl lock together without offset or overlap. Joining tabs<br />
and hardware to connect sections shall be supplied with edging.<br />
c. Standard 3/8" x 10" steel spikes shall be provided.<br />
2.0:?'<br />
OTHER MATERIALS<br />
A. Provide other materials. not specifically described but required for n complete and<br />
proper installation, as selected by the CONTRACTOR subject to the approval 01<br />
the ENGINEER.<br />
MOORESTOWN TWP.<br />
Contract No. 2012-7<br />
/\ -()7 3 ()-()()44 -OOOlS 2056<br />
September 10,2012<br />
Brick Unit P::lving<br />
<strong>02522</strong>-4
<strong>PA</strong>RT 3 - EXECUTION<br />
3.0 I EXAMINATION<br />
A. Prior to all work of this section, verify that this installation may properly<br />
commence,<br />
B. Verify that the work of this section may be installed in accordance with all<br />
pertinent codes and regulations, the original design, and the referenced standards,<br />
I. Verify that earthwork is completed to correct line and grade.<br />
2. Verify that forms conform to line, grade and dimensions shown on Plans.<br />
3. VerifY that subgrade is smooth, compacted and free of excessive moisture.<br />
C. In the event of discrepancy, immediately notify the ENGINEER.<br />
D. Do not proceed ,vith installation in areas of discrepancy until all such<br />
discrepancies have been fully resolved.<br />
3.02 PRE<strong>PA</strong>RATION<br />
A. Coordinate with ENGINEER for marking out of sidewalk removal limits.<br />
[3. Excavate subgrade and sct forms so that finished sidewalk conforms to lincs and<br />
grades shown on Plans, or as directed by the ENGINEER.<br />
C. Prepare side\valk subgrade as specified in Seclion 31 2300.<br />
3.03 INSTALLATION<br />
A. Performance:<br />
1. Constnlct concrete setting bed in acc()I'{iancc with Section 02533,<br />
Roadway C'Ollcrclc.<br />
2. Construct sidc\valk ,IS shown on the Plans.<br />
13. General:<br />
MOORESTOWN TWP.<br />
Contract No. 2012-7<br />
J. Do not usc brick with chips. cracks, voids, discolorations or other visible<br />
defects.<br />
;\ -()73 O-00'lLl-000/S205 6<br />
Scptcmb
2. Set brick with unifonn joints in running bond pattern. Long axis of brick<br />
to be perpendicular to curb.<br />
3. Place expansion joints in accordance with Section 02533, Roadway<br />
Concrete.<br />
3.04 ADJUST AND CLEAN<br />
A. Remove and replace bricks that have become loose, chipped, broken, stained, or<br />
otherwise damaged during installation.<br />
B. Provide new units to match adjoining units and install in fresh mortar, pointed to<br />
eliminate evidence of replacement.<br />
C. Cleaning:<br />
1. Remove mortar droppings before hardening.<br />
2. Wet paving with fine spray until waler runs fi'ecly over surface.<br />
3. Apply brick manufacturer's recommended cleaning solution with stiff<br />
brush.<br />
4. Scrub rnaxirhtim of 1 00 square feet of Sllrf~lcC at one time.<br />
5. Rinse with clear water.<br />
3.05 PROTECTION<br />
A. Protect concrete and finished brick work (i'om pedestrian and vehicular traffic<br />
until concrete has been suftlciently cured as determined by the ENGINEER.<br />
B. . Mcthod of protection shall be npprovcd by the ENGINEER prior to beginning<br />
work under this section.<br />
H<br />