24.12.2014 Views

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MS – Control Plan<br />

Matrix with <strong>the</strong> WBS <strong>and</strong> <strong>the</strong><br />

milestones, criteria, key po<strong>in</strong>ts (hold,<br />

acceptance, review, notification, etc).<br />

The Control plan is a sequence of<br />

critical operations, <strong>in</strong>structions <strong>and</strong><br />

requirements, activities that F4E or its<br />

representative <strong>in</strong>tends to observe<br />

Includes <strong>the</strong> requirements <strong>and</strong> actors of<br />

activities <strong>and</strong> <strong>the</strong> status of <strong>the</strong> operation<br />

listed.<br />

Will be used as a Review Matrix by:<br />

- supplier<br />

-F4E<br />

Annex to <strong>the</strong> Quality Plan<br />

(Up-to-date status is essential)<br />

<strong>QA</strong> <strong>and</strong> <strong>Management</strong> <strong>Specifications</strong> - J. Izquierdo - September 2009 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!