QA and Management Specifications in the ITER Project - Iter Industry
QA and Management Specifications in the ITER Project - Iter Industry
QA and Management Specifications in the ITER Project - Iter Industry
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MS – Change <strong>Management</strong><br />
Divergences are addressed with <strong>the</strong><br />
follow<strong>in</strong>g processes:<br />
Change – a previously proposed <strong>and</strong><br />
approved modification to a specified<br />
requirement (current approved<br />
configuration basel<strong>in</strong>es).<br />
Deviation - a previously planned<br />
alternative to a specified requirement<br />
def<strong>in</strong>ed for a specific scope (a limited<br />
quantity of product or period of time, <strong>and</strong><br />
for a specific use).<br />
Nonconformity – any condition which<br />
does not comply with a specified<br />
requirement.<br />
<strong>QA</strong> <strong>and</strong> <strong>Management</strong> <strong>Specifications</strong> - J. Izquierdo - September 2009 14