24.12.2014 Views

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MS – Change <strong>Management</strong><br />

Divergences are addressed with <strong>the</strong><br />

follow<strong>in</strong>g processes:<br />

Change – a previously proposed <strong>and</strong><br />

approved modification to a specified<br />

requirement (current approved<br />

configuration basel<strong>in</strong>es).<br />

Deviation - a previously planned<br />

alternative to a specified requirement<br />

def<strong>in</strong>ed for a specific scope (a limited<br />

quantity of product or period of time, <strong>and</strong><br />

for a specific use).<br />

Nonconformity – any condition which<br />

does not comply with a specified<br />

requirement.<br />

<strong>QA</strong> <strong>and</strong> <strong>Management</strong> <strong>Specifications</strong> - J. Izquierdo - September 2009 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!