QA and Management Specifications in the ITER Project - Iter Industry
QA and Management Specifications in the ITER Project - Iter Industry
QA and Management Specifications in the ITER Project - Iter Industry
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MS – Quality Plan<br />
AT TENDER LEVEL<br />
– The Bidder shall provide, <strong>in</strong> its offer a mean<strong>in</strong>gful outl<strong>in</strong>e of a dedicated QP with <strong>the</strong><br />
plans, schedules <strong>and</strong> explanation of <strong>the</strong> provisions to comply with <strong>the</strong> requirements<br />
– The Bidder will be evaluated on <strong>the</strong> basis of its QP accord<strong>in</strong>g to <strong>the</strong> Tender Specs.<br />
– Certification accord<strong>in</strong>g to <strong>in</strong>ternational st<strong>and</strong>ard is not m<strong>and</strong>atory (but recommended).<br />
Specific requirements can be def<strong>in</strong>ed for each contract through <strong>the</strong> management<br />
specification based on <strong>the</strong> contract complexity.<br />
The Quality Plan shall be referenced as an “outl<strong>in</strong>e’ version where:<br />
– Some sections will be addressed as a description of <strong>the</strong> proposed system<br />
– The rema<strong>in</strong><strong>in</strong>g sections shall have <strong>the</strong> description of <strong>the</strong> Bidder current system.<br />
(To have evidence that all <strong>the</strong> specific requirement are addressed <strong>and</strong> all provision for<br />
ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g <strong>the</strong>se requirements have been foreseen by <strong>the</strong> bidder)<br />
AT CONTRACT LEVEL<br />
1. Kick-off meet<strong>in</strong>g - <strong>the</strong> Supplier shall provide <strong>the</strong> proposed Quality Plan;<br />
2. The Supplier shall not beg<strong>in</strong> any work without <strong>the</strong> QP be<strong>in</strong>g approved <strong>in</strong> writ<strong>in</strong>g<br />
3. Dur<strong>in</strong>g Contract implementation, i <strong>the</strong> Supplier shall update <strong>the</strong> Quality Plan (or parts of<br />
it) as/if required <strong>and</strong> shall submit it for approval to F4E.<br />
<strong>QA</strong> <strong>and</strong> <strong>Management</strong> <strong>Specifications</strong> - J. Izquierdo - September 2009 9