24.12.2014 Views

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

QA and Management Specifications in the ITER Project - Iter Industry

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Codes <strong>and</strong> St<strong>and</strong>ards<br />

Multi-code approach is applied for <strong>the</strong> selection of <strong>the</strong> Codes for<br />

various <strong>ITER</strong> components:<br />

• <strong>the</strong> wide variety of <strong>the</strong> <strong>ITER</strong> components <strong>and</strong> loads which does not allow to<br />

use one exist<strong>in</strong>g <strong>in</strong>dustrial Code;<br />

• <strong>the</strong> needs to use some advantages of specific exist<strong>in</strong>g Codes to cover <strong>the</strong><br />

particular <strong>ITER</strong> operational requirements;<br />

• <strong>the</strong> unique feature of some <strong>ITER</strong> components (magnet, <strong>in</strong>-vessels) for which<br />

<strong>the</strong>re are no exist<strong>in</strong>g Codes <strong>and</strong> special Codes shall be developed;<br />

• <strong>the</strong> reduction of cost of equipment due to <strong>the</strong> procurement shar<strong>in</strong>g with <strong>the</strong><br />

<strong>ITER</strong> Members.<br />

<strong>QA</strong> <strong>and</strong> <strong>Management</strong> <strong>Specifications</strong> - J. Izquierdo - September 2009 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!