protea - PGA Consultants
protea - PGA Consultants
protea - PGA Consultants
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
250<br />
250<br />
250<br />
250<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
250<br />
250<br />
40 40<br />
275 165 250 250 275 165<br />
Panel<br />
Panel<br />
female<br />
female<br />
side<br />
side<br />
40 40<br />
40 40<br />
275 165 250 250 275 165 250 250 275 165 250 250 275 165 250 250 275<br />
208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5 208,5<br />
40<br />
201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5 201,5<br />
40<br />
213 213 213 213 213 213 213 213 213<br />
40 40<br />
165<br />
250<br />
250<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
165<br />
250<br />
500<br />
250<br />
275<br />
Panel<br />
female<br />
side<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
170<br />
250<br />
250<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
165<br />
40<br />
275 165<br />
Panel<br />
female<br />
side<br />
250<br />
250<br />
250<br />
250<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
120<br />
275<br />
Panel<br />
female<br />
side<br />
165<br />
500<br />
275<br />
Panel<br />
female<br />
side<br />
165<br />
165<br />
250<br />
250<br />
40<br />
275<br />
Panel<br />
female<br />
side<br />
165<br />
250<br />
250<br />
275<br />
Panel<br />
female<br />
side<br />
40<br />
250 250 275 165 250 250 275<br />
Panel<br />
Panel<br />
female<br />
female<br />
side<br />
side<br />
PROTEA | Installation guide abstract<br />
Each PROTEA kit comes with complete assembly<br />
instructions. Two documents detail all the different<br />
steps in the construction process.<br />
1 - Construction manual<br />
In this first document, the following points are<br />
covered:<br />
Necessary tools:<br />
Description of the needed equipment.<br />
Layout of the elements<br />
Installation plans giving laying order and position for<br />
each element:<br />
2<br />
7<br />
1 3 4 5 22 23 24 26<br />
6<br />
25<br />
Bedroom 2 Kitchen Bathroom<br />
/<br />
Bedroom3<br />
12<br />
32<br />
9 10 11 31 30<br />
33<br />
8<br />
13<br />
14<br />
Bedroom 1<br />
18<br />
Lounge<br />
27<br />
28<br />
29<br />
36<br />
2 - Fastenings plans<br />
This second document contains a complete range of<br />
drawings showing the number and precise position of<br />
all the different fastenings.<br />
600 600 600<br />
30<br />
215<br />
210<br />
210<br />
215 100 235<br />
230<br />
230<br />
235 100 280<br />
30<br />
30 30<br />
340 100 235 230 230 235 100 200 195 195 200<br />
15<br />
16<br />
19<br />
17 20 21 34 35 38 39<br />
37<br />
Panel<br />
Panel<br />
Panel<br />
Panel<br />
Panel<br />
female<br />
female<br />
female<br />
female<br />
female<br />
side<br />
side<br />
side<br />
side<br />
side<br />
1-38: Laying order : male side of panels<br />
Nomenclature:<br />
Extensive nomenclature of the kit contents.<br />
Connection details:<br />
How specific connections are treated<br />
Screw<br />
Wall panel<br />
Floor rail<br />
Screw<br />
600 600 600<br />
Site preparation:<br />
How to prepare the construction site prior to<br />
beginning<br />
8500<br />
Pattern L<br />
Reservations<br />
5600<br />
Floor<br />
Tightness joint<br />
Openings:<br />
How to install and fasten doors and windows<br />
130<br />
325<br />
325<br />
325<br />
325<br />
325<br />
325<br />
325<br />
325<br />
150<br />
20<br />
283<br />
Ridge<br />
Eaves<br />
diameter Ø<br />
Welded wire reinforcement. L=150mm, and Ø=8mm<br />
Recommendations, preliminary operations:<br />
For example about checking panels verticality.<br />
Safety recommendations<br />
Take extra care of safety on the working site. All<br />
workers must wear all necessary safety equipment,<br />
which is gloves, safety shoes, helmet, safety glasses.<br />
5