To connect the villages by all weather roads, one of scheme is by<br />
assistance of NABARD Bank. As per <strong>no</strong>rms of NABARD Bank, village road<br />
development programme is taken so that the Agricultural production from village<br />
can be taken to market throughout the year.<br />
Abstract of works done through NABARD ( scheme 3 to 8 and 9 to 15) are<br />
given in table below.<br />
TABLE NO. 6<br />
Sr. <strong>no</strong>. No. of NABARD Exp. No of No of Remarks<br />
works Grant Rs upto works works in<br />
Sanctioned in lakhs 3/2010 completed progress<br />
1 170 4560.9 4433.9 170 - 3 to 8<br />
scheme<br />
2 59 2571.39 218<strong>9.</strong>17 36 21 9 to 15<br />
scheme<br />
4)Village Connectivity:-<br />
As per Govt. <strong>no</strong>rms all village having population more than 2000 as per<br />
1991 census , these villages are to connected with blacked topped roads.<br />
The works of village connectivity is done under PMGSY. In Aurangabad<br />
region all villages more than 1500 population are to connected by B.T.<br />
road. In Aurangabad district out of total 1300 villages 967 are connected<br />
by B.T. road.<br />
5)Works Executed through BOT:<br />
Major Works executed through BOT in Aurangabad dist. are<br />
12