Taluka Head Quarters Joining Two Lane Road: 2011-15<br />
TABLE NO. 12<br />
Sr.<br />
No.<br />
Name of Road<br />
1. Aurangabad –<br />
Gangapur Raod<br />
2. Aurangabad-Shivur<br />
Banglow Raod<br />
3. Isarwadi-Dahegaon<br />
Road<br />
4. Gangapur- Vaijapur<br />
Road<br />
Length<br />
for two<br />
laning<br />
Cost<br />
as per<br />
DSR<br />
2010<br />
Yearwise Physical Target &<br />
Requirement of Necessary Estimated<br />
Budget (Rs. Crores)<br />
2011 2012 2013 2014 2015<br />
10.0 5.00 2.50 2.50<br />
2<strong>9.</strong>00 14.50 2.40 2.40 2.40<br />
42.00 37.80 4.70 4.70 4.70<br />
38.00 1<strong>9.</strong>00 5.00 5.00 5.00 4.00<br />
5. Gangapur-Lasur<br />
Satation<br />
Fly-over Bridge<br />
Including<br />
24.0 37.60 4.70 4.70 4.70<br />
6. Vaijapur-Shivur<br />
Bunglow-Ourala-<br />
Chapaner Shivarai<br />
Phata<br />
7. Kannad-Pishor-Sillod<br />
8. Kannad-Nagad-<br />
Ba<strong>no</strong>ti-Soyegaon<br />
65.00 48.50 6.00 6.00 6.00<br />
65.00 32.50 4.50 4.50 4.50 4.50<br />
80.00 72.00 8.10 8.10 8.10 8.10<br />