31.12.2014 Views

9. group no. transport & communication

9. group no. transport & communication

9. group no. transport & communication

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Taluka Head Quarters Joining Two Lane Road: Year 2016-2020<br />

TABLE NO. 13<br />

Sr.<br />

No.<br />

Name of Road<br />

Length<br />

for two<br />

laning<br />

Cost<br />

as per<br />

DSR<br />

2010<br />

Yearwise Physical Target &<br />

Requirement of Necessary Estimated<br />

Budget (Rs. Crores)<br />

2016 2017 2018 2019 2020<br />

1. Aurangabad –<br />

Gangapur Raod<br />

2. Aurangabad-Shivur<br />

Banglow Raod<br />

3. Isarwadi-Dahegaon<br />

Road<br />

4. Gangapur- Vaijapur<br />

Road<br />

5. Gangapur-Lasur<br />

Satation Including<br />

Fly-over Bridge<br />

6. Vaijapur-Shivur<br />

Bunglow-Ourala-<br />

Chapaner Shivarai<br />

Phata<br />

10.0 5.00<br />

2<strong>9.</strong>00 14.50 2.40 2.40 2.50<br />

42.00 37.80 4.70 4.70 4.70 4.70 4.90<br />

38.00 1<strong>9.</strong>00<br />

24.0 37.60 4.70 4.70 4.70 4.70 4.70<br />

65.00 48.50 6.00 6.00 6.00 6.00 6.50<br />

7. Kannad-Pishor-Sillod 65.00 32.50 4.50 4.50 5.50<br />

8. Kannad-Nagad-<br />

Ba<strong>no</strong>ti-Soyegaon<br />

80.00 72.00 8.10 8.10 8.10 8.10 7.20<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!