Traffic and Financial analysis has been carried out and following State highway<br />
are identified for Four-laning in next Five years.<br />
i)Fouring laning of Aurangabad- Paithan road:<br />
a) Total length:- 45.855 km<br />
b) Total Cost:- 151.00 crores<br />
c) Govt. Contribution :- 62.00 crores<br />
ii) Fouring laning of Aurangabad –Phulambri-Sillod-Ajantha-Jalgaon Road:<br />
a) Total length:- 102.00 km ( Length in A’bad Dist)<br />
b) Total Cost:- 835.00 crores<br />
c) Govt. Contribution :- 140.00 crores<br />
iii) Four laning of Aurangabad- Lasur-Vaijapur road:-<br />
a) Total length:- 65.00 km<br />
b) Total Cost:- 325.00 crores<br />
c) Govt. Contribution :- 80.00 crores<br />
3) Proposed Railway Over Bridge:<br />
Following ROB have been identified to reduce the traffic congestion in future.<br />
i) ROB at A’nagar Naka on Aurangabad-A’nagar road<br />
adjacent to existing ROB.<br />
ii)<br />
iii)<br />
ROB on Ring Road at Tisgaon-Mitmita section<br />
ROB at Lasur on Ganapur-Lasur-Devgaon road<br />