INDRODUCTION :-<br />

Aurangabad, the Capital of Marathwada Region of Maharashtra is famous<br />

for its rich cultural heritage. The famous Ajanta Caves, Ellora Caves, Daulatabad<br />

Fort, Bibi-ka-Makbara are world famous Tourism centre.<br />

Being located in centre of Maharashtra it is one of the rapidly developing<br />

city in the State. It is also hub for Automobile industries.<br />

The District spread in 10107 Sq. Km. with population of 28.9 lakhs as per 2001<br />

census and 1300 Village.<br />

TRANSPORTATION :-<br />

An efficient <strong>transport</strong> system in the lifeline of the eco<strong>no</strong>my. A dense and<br />

efficient network of connectivity is a pre requisite<br />

for overall eco<strong>no</strong>my<br />

development and growth of trade.<br />

Mainly there are three mode of <strong>transport</strong>ation.<br />

a) Roadway<br />

b) Railway<br />

c) Airway<br />

a) Roadway :- The State road network consists of<br />

1) National Highway<br />

2) State Highway<br />

3) Major District Roads


4) Other District Roads<br />

5) Village Roads.<br />

The road developments works in the state are carried out by<br />

i) Public Works Department<br />

ii)<br />

iii)<br />

iv)<br />

Zilla Parishad (Z.P.)<br />

Municipal Corporation / Councils/ Nagar Panchayats<br />

Cantonments Roads<br />

v) MSRDC, MIDC, CIDCO<br />

Brief Definition of above category of road is stated below :<br />

1) National Highway :- National Highway main highway running through<br />

the length and breadth of India, connecting major ports, foreign<br />

highway capital of large state and large industrial and tourist centers<br />

including roads required the strategic movements of the defense of<br />

India.<br />

2) State Highway :- State Highway are arterial road of a state connecting<br />

up with the national highway of adjacent states, district road quarters<br />

and important cities within the state and serving as the main arteries for<br />

traffic to and from district roads.<br />

3) Major District Road :- Major District road are important roads within a<br />

district serving areas of production and markets and connecting those<br />

with each other or within highways of a district. The MDR have lower<br />

2


speed & geometric design specification than National Highway / State<br />

Highway.<br />

4) Other District Road :- Other District road are roads serving rural areas of<br />

production and providing them with outlet to market centre, taluka<br />

head quarter, block development road quarter or other main road.<br />

5) Village Road :- Village road are roads connecting villages or <strong>group</strong> of<br />

village with each other to the nearest road of higher category.<br />

Road Developments work in Aurangabad District<br />

The Road Development plan for Aurangabad District taking into<br />

consideration the recommendation of the IRC, the other important objective<br />

of the Road Development Plan – 1981-2011 where<br />

1) Expansion of National Highway Network<br />

2) Construction of Express way on Major Traffic corridor<br />

3) Extension of state Highway to District Head Quarter, Industrial Center, Tourist<br />

Center<br />

4) MDR to connect villages with population 1000-1500<br />

Salient feature of Road Development Plan 2001-2010 :<br />

following are some important salient feature of Road Development plan<br />

2001-2021<br />

i) To construct National Highway such that , informs 100 km square<br />

network.<br />

3


ii)<br />

To construct Express Highway for fast moving vehicle and Four<br />

laning on road having maximum traffic density.<br />

iii)<br />

To connect District Highway road quarter by four lane, Taluka<br />

head quarter, Industrial centre, Tourist centre by Two lane State<br />

Highways.<br />

iv)<br />

To connect Village having population more than 1500 by MDR.<br />

v) To connect Village having population1000 to 1500 by ODR.<br />

vi)<br />

To connect remote Village by all weather road.<br />

4


CURRENT STATUS : -<br />

The existing road length in Aurangabad District & other District of<br />

Marathwada Category wise is given below :<br />

Table No. 1<br />

Sr.<br />

District<br />

National<br />

MSH &<br />

Length in KM<br />

MDR ODR VR Total<br />

No.<br />

Highway<br />

SH<br />

1 Aurangabad 134.2 1194.22 1733.3 1224.26 3795.26 8078.58<br />

2 Jalna 24.56 1247.40 1055.7 1370 2746.2 6443.9<br />

3 Parbhani 68.14 660.52 1064.58 740.45 2894.75 5428.44<br />

4 Hingoli 36.0 503.45 787.55 485.75 2022.42 3835.17<br />

5 Nanded 95.0 1256.46 2677.2 1445.5 5241.09 10715.19<br />

6 Beed 193.35 1212.05 1684.3 1438.05 4332.39 8860.14<br />

7 Osmanabad 202.92 864.42 1336.0 1168.2 255<strong>9.</strong>34 6130.88<br />

8 Latur 0 853 1547 1364 2281.2 6054.2<br />

Total 754.17 7791.50 11885.93 9236.25 2586<strong>9.</strong>65 55537.5<br />

Ratio of Total road length in km by total area in Sq. km 0.85<br />

5


Taluka wise Breakup of Existing Road Length in Aurangabad District is given in<br />

Table No. 2<br />

Sr. Name of<br />

Existing Length of Road in Km<br />

Total<br />

No. Taluka NH MSH SH MDR ODR VR Length<br />

1 Aurangabad 60.24 70.22 104.70 192.95 46.90 387.0 862.01<br />

2 Paithan 25.20 00 134.00 242.25 227.90 440.50 106<strong>9.</strong>85<br />

3 Phulambri 0.0 24.20 32.00 125.45 73.80 405.60 661.05<br />

4 Sillod 0.0 45.00 101.50 182.75 163.20 427.60 93<strong>9.</strong>45<br />

5 Soyegaon 0.0 10.00 88.50 77.55 42.60 19<strong>9.</strong>10 417.75<br />

6 Kannad 32.76 0 155.60 25<strong>9.</strong>45 145.10 650.50 1243.41<br />

7 Khultabad 16.00 0 6<strong>9.</strong>60 73.75 53.10 183.66 395.51<br />

8 Gangapur 00 0 18<strong>9.</strong>60 290.80 178.10 476.40 1135.00<br />

9 Vaijapur 00 0 16<strong>9.</strong>90 288.65 273.60 623.10 1354.55<br />

Total 134.20 14<strong>9.</strong>42 1044.80 1733.60 1224.50 3792.25 8078.28<br />

6


SWOT ANALYSIS :<br />

While preparing this documents the working <strong>group</strong> has adopted SWOT<br />

Analysis as a tool for visioning the future of the District Aurangabad.<br />

a) Strength :<br />

i) Engineer having vast experienced in construction of Roads and<br />

Bridges.<br />

ii)<br />

iii)<br />

iv)<br />

Technical guidance from Chief Engineer.<br />

Separate organization for Design / Survey of Bridge and Roads.<br />

Vigilance and Quality wings to asses quality of work.<br />

b) Weakness :<br />

i) Inadequate fund from Govt. for development of Road.<br />

ii)<br />

Lengthy process of Land Acquisition.<br />

c) Opportunities :<br />

i) Aurangabad is Centrally located on the map of the States.<br />

ii)<br />

iii)<br />

iv)<br />

Fastest Developing city in the state.<br />

Attractive tourist destination.<br />

Eight laning of Delhi-Mumbai Industrial corridor.<br />

d) Threat :<br />

i) Slow pace of development due to <strong>no</strong>n- availability of timely<br />

resources.<br />

7


VISION AND OBJECTIVES:<br />

Vision statement:<br />

“To create District as a world class facilities for development of<br />

Industries, Tourism, Major boost to Agro-based industries by developing<br />

Transportation facilities, connecting all villages by Black Topped roads,<br />

thus saving time and fuel in <strong>transport</strong>ation & thereby contributing to the<br />

Social, Eco<strong>no</strong>mical and overall Development of the District<br />

Aurangabad”<br />

Developmental Objectives:-<br />

1) Road way:<br />

i) Development of State Highway networks<br />

ii)<br />

Four laning of Sate Highway having maximum traffic density<br />

through PPP<br />

iii)<br />

iv)<br />

Development of MDR networks<br />

To complete construction of Ring road around Aurangabad city<br />

and finalized the Alignment of Outer Ring road along with Land<br />

acquisition<br />

v) Eight laning of Delhi-Mumbai Industrial corridor passing through<br />

Aurangabad.<br />

vi)<br />

To connect Taluka Head quarter with Two lane road<br />

8


vii)<br />

To connect Taluka Head quarter with District Head quarter with<br />

Two lane road<br />

viii)<br />

ix)<br />

To construct ROB at required level crossing<br />

Upgradation of road networks<br />

x) To improve Road Safety measures<br />

xi)<br />

xii)<br />

Strengthening of existing roads<br />

Connecting all village with Black Toppped roads<br />

2) Airways:<br />

i) To develop Aurangabad Airport with international facilities<br />

ii)<br />

iii)<br />

To construct permanent Helipad at Taluka level<br />

Daily flight connecting Aurangabad with major cities in the<br />

country<br />

3) Railways:<br />

i) To improve existing facilities of Railways line by providing Double<br />

lane between Mammad-aurangabad section<br />

ii)<br />

Electrification of Railway track<br />

iii) To develop Satellite Railway station at Mukundwadi with<br />

adequate facilities<br />

iv)<br />

International facilities at Aurangabad station<br />

4) Communication:<br />

i) Connecting all villages by Landline/Mobile services<br />

ii)<br />

Providing Broad Band facilities to all the villages in district.<br />

9


INDICATORS:<br />

The working <strong>group</strong> formed for the Transportation and Communication<br />

has laid down the Indicators on the basis of its and objective.<br />

Some Statistical indicators depicting the present scenario and future<br />

projection are presented in the table.<br />

Indicators for Development Objectives:<br />

TABLE NO :4<br />

Sr. <strong>no</strong>. Indicators Present Status Future Projection<br />

1. Total Road length per Sq.<br />

km. of area<br />

2 Blacked Topped Road<br />

Surface<br />

3 Four laning of State<br />

Highway<br />

4 Four laning of National<br />

Highway<br />

0.798 km 1.00 km<br />

58 % 100%<br />

66 km 218.00 km<br />

11 km 143.00 km<br />

10


ONGING SCHEMES:<br />

In order to develop the road networks and carrying out the works of<br />

improvement to bring the existing networks to the required standard and<br />

specification, GOM have raised fund from various resources like assistance from<br />

the NABARD, HUDCO, Private investment for BOT works etc. apart from Plan &<br />

Non-plan works allocation from Annual State budget.<br />

The Road development has been implemented by taking up works under<br />

various scheme such as MREGS, PMGSY, BOT, works through RIDF project, CRF,<br />

NABARD loan. All this construction activity had given boost to increase the<br />

employment to Skills and Unskilled works on a large scale.<br />

Details of some Important scheme Implemented:<br />

1.Works through Centre Road Fund (CRF)<br />

The details of works done under CRF are as given in the table<br />

TABLE NO. 5<br />

Sr. No of works Est. Cost Exp. upto No of works No of works<br />

<strong>no</strong>.<br />

Rs in lakhs 31/3/2010 completed in progress<br />

1 17 340<strong>9.</strong>81 1923.64 9 5<br />

2) Marathwada Development Programme:<br />

To fulfill the Backlog of Marathwada region, Govt. started the Marathwada<br />

vikad programme. Works of Roads and Bridges are taken under MVP in district.<br />

3) Works carried through Loan Assistance received from NABARD:-<br />

11


To connect the villages by all weather roads, one of scheme is by<br />

assistance of NABARD Bank. As per <strong>no</strong>rms of NABARD Bank, village road<br />

development programme is taken so that the Agricultural production from village<br />

can be taken to market throughout the year.<br />

Abstract of works done through NABARD ( scheme 3 to 8 and 9 to 15) are<br />

given in table below.<br />

TABLE NO. 6<br />

Sr. <strong>no</strong>. No. of NABARD Exp. No of No of Remarks<br />

works Grant Rs upto works works in<br />

Sanctioned in lakhs 3/2010 completed progress<br />

1 170 4560.9 4433.9 170 - 3 to 8<br />

scheme<br />

2 59 2571.39 218<strong>9.</strong>17 36 21 9 to 15<br />

scheme<br />

4)Village Connectivity:-<br />

As per Govt. <strong>no</strong>rms all village having population more than 2000 as per<br />

1991 census , these villages are to connected with blacked topped roads.<br />

The works of village connectivity is done under PMGSY. In Aurangabad<br />

region all villages more than 1500 population are to connected by B.T.<br />

road. In Aurangabad district out of total 1300 villages 967 are connected<br />

by B.T. road.<br />

5)Works Executed through BOT:<br />

Major Works executed through BOT in Aurangabad dist. are<br />

12


1) Four laning of Aurangabad-Jalna road (MSH-6) km. 10/400 to<br />

60/00, Zalta ring road 0/00 to 2/800 and Beed by pass<br />

2) Four laning of Aurangabad – A’nagar (SH-60)<br />

13


CHALLENGES:-<br />

The major challenges facing in <strong>transport</strong> system are<br />

1)Roads are congested and Poor quality:<br />

Though National Highway passing (NH-211) through district is of Two lane<br />

may be congested in future looking to the growth of traffic. State Highway system<br />

are Two-lane or less with the creation of low lane capacity. Low lane capacity<br />

reduces the speed of vehicle. This contributes to high fuel consumption, more<br />

time in travel, and huge pollution. Most of SH are of poor quality due to <strong>no</strong>nmaintenance<br />

facing Lack of fund.<br />

2)Poor access to rural area:<br />

Almost 70 % of population reside in rural area. Although the rural road<br />

networks is extensive, villages faces problem during monsoon season due to lack<br />

of BT works.<br />

3)High cost of Travel through Airway:<br />

Though Airway travel is fastest and safe as compare to other mode of <strong>transport</strong>,<br />

still it is out of reach of common man to travel through Airway due to its High cost.<br />

4)Heavily crowded<br />

Trains:<br />

Though Railway is cheapest mode of <strong>transport</strong>ation it is very difficult to find place<br />

in Railway trains. Railway is crowded throughout the year.<br />

14


COMPARATIVE ANALYSIS:<br />

The total road length in the Marathwada region i.e. in Aurangabad, Jalna,<br />

Nanded, Parbhani, Hingoli, Beed, Osmanabad and Latur district category wise<br />

are given in table below.<br />

TABLE NO. 7<br />

No. District N.H. MSH &<br />

SH<br />

MDR ODR VR Total<br />

Length in<br />

km<br />

Total<br />

road<br />

length in<br />

km per<br />

sq. km<br />

of area<br />

1 A’bad 134.2 1194.22 1733.3 1224.26 3795.26 8078.58 0.798<br />

2 Jalna 24.56 1247.40 1055.7 1370 2746.2 6443.9 0.834<br />

3 Parbhani 68.14 660.52 1064.58 740.45 2894.75 5428.44 0.832<br />

4 Hingoli 36.0 503.45 787.55 485.75 2022.42 3835.17 0.847<br />

5 Nanded 95.0 1256.46 2677.2 1445.5 5241.09 10715.19 1.01<br />

6 Beed 193.35 1212.05 1684.3 1438.05 4332.39 8860.14 0.828<br />

7 Os’bad 202.92 864.42 1336.0 1168.2 255<strong>9.</strong>34 6130.88 0.80<br />

8 Latur 0 853 1547 1364 2281.2 6054.2 0.845<br />

Total 754.17 7791.50 11885.93 9236.25 2586<strong>9.</strong>65 55537.5 0.85<br />

15


TARGET/VISION 2020:<br />

As per Govt. <strong>no</strong>rms & policies, the revised Road Development plan 2001-2021 for<br />

Aurangabad district has been submitted for approval. This is the base for vision-<br />

2020 document. The target length of road for the year 2020 category are given<br />

below.<br />

TABLE NO. 8<br />

Sr. Type of Road Category Current Status in Target 2020 km<br />

<strong>no</strong>.<br />

km<br />

1 National Highway 134.00 218.00<br />

2 State Highway 1194.32 1394.28<br />

3 M.D.R. 1733.60 1820.40<br />

4 O.D.R. 1224.20 1703.15<br />

5 Village Road 3792.16 4978.76<br />

6 Total 8078.28 10114.57<br />

7 Total road length per sq. km<br />

of area<br />

0.798 1.002<br />

16


Taluka wise break up of above target length is given table below<br />

TABLE NO. 9<br />

Sr. Name of<br />

Target Length of Road in Km<br />

Total<br />

No. Taluka NH SH MDR ODR VR Length<br />

1 Aurangabad 96.24 210.09 204.71 124.75 79<strong>9.</strong>01 1434.8<br />

2 Paithan 25.20 157.33 236.81 295.80 805.00 1520.14<br />

3 Phulambri 0.0 80.45 10<strong>9.</strong>61 163.80 443.91 797.77<br />

4 Sillod 0.0 184.25 15<strong>9.</strong>01 304.20 433.21 1080.67<br />

5 Soyegaon 0.0 11<strong>9.</strong>43 72.00 101.20 310.40 603.03<br />

6 Kannad 38.76 192.03 29<strong>9.</strong>33 153.70 771.38 1455.20<br />

7 Khultabad 3<strong>9.</strong>00 68.43 85.61 101.70 24<strong>9.</strong>55 544.30<br />

8 Gangapur 00 193.63 321.01 178.50 540.91 1234.05<br />

9 Vaijapur 1<strong>9.</strong>00 187.64 332.3 27<strong>9.</strong>50 625.37 1443.81<br />

Total 218.00 1394.28 1820.40 1703.15 4978.76 10114.5<br />

Four Laning of Major State Highway through PPP:<br />

To achieve the target as per Road Development, huge amount of rupees are<br />

required. Looking to the budget allocation it will be impossible to complete the<br />

target in time. This has initiated to take works under built, Operate & Transfer.<br />

17


Traffic and Financial analysis has been carried out and following State highway<br />

are identified for Four-laning in next Five years.<br />

i)Fouring laning of Aurangabad- Paithan road:<br />

a) Total length:- 45.855 km<br />

b) Total Cost:- 151.00 crores<br />

c) Govt. Contribution :- 62.00 crores<br />

ii) Fouring laning of Aurangabad –Phulambri-Sillod-Ajantha-Jalgaon Road:<br />

a) Total length:- 102.00 km ( Length in A’bad Dist)<br />

b) Total Cost:- 835.00 crores<br />

c) Govt. Contribution :- 140.00 crores<br />

iii) Four laning of Aurangabad- Lasur-Vaijapur road:-<br />

a) Total length:- 65.00 km<br />

b) Total Cost:- 325.00 crores<br />

c) Govt. Contribution :- 80.00 crores<br />

3) Proposed Railway Over Bridge:<br />

Following ROB have been identified to reduce the traffic congestion in future.<br />

i) ROB at A’nagar Naka on Aurangabad-A’nagar road<br />

adjacent to existing ROB.<br />

ii)<br />

iii)<br />

ROB on Ring Road at Tisgaon-Mitmita section<br />

ROB at Lasur on Ganapur-Lasur-Devgaon road<br />

18


Sr.<br />

<strong>no</strong><br />

.<br />

FINANCIAL IMPLICATION AND ACTION PLAN:<br />

The estimates financial resources required for various projects and<br />

program are as stated below<br />

GENERAL ABSTACT:<br />

TABLE NO. 10 2010-2015<br />

Item<br />

1 Four<br />

Laning of<br />

Major SH<br />

(PPP)<br />

2 Tq. H.Q. to<br />

Tq. HQ<br />

connectin<br />

g Two<br />

lane Road<br />

3 Road<br />

Constructi<br />

on<br />

4 Strengteni<br />

ng of<br />

Existing<br />

B.T. Road<br />

5 Road<br />

Constructi<br />

on Under<br />

PMGSY<br />

6 Eigth Lane<br />

Delhi-<br />

Mumbai<br />

Ind.<br />

corridor<br />

Total<br />

lengt<br />

h (in<br />

Km)<br />

Estimat<br />

ed<br />

cost in<br />

crores<br />

Yearwise Requirement of Budget ( Rs.<br />

Crores)<br />

2011 2012 2013 2014 2015<br />

217.00 1336.25 32.00 73.25 2<strong>9.</strong>0 72.0 41.00<br />

408.5 307.05 23.70 44.50 37.55 41.00<br />

5088.2 1040.58 104.05 104.0 104.0 104.0 104.05<br />

2253.0 731.08 73.00 73.00 73.00 73.00 73.00<br />

834.05 250.21 50.38 48.93 50.04 50.43<br />

91 775 110.0 110.0<br />

Remar<br />

ks<br />

Govt.<br />

Share<br />

Rs.<br />

307.25<br />

crores<br />

Total Cost 4448.17 20<strong>9.</strong>2 324.38 29<strong>9.</strong>48 446.64 41<strong>9.</strong>48<br />

19


2016-2020<br />

Sr.<br />

<strong>no</strong><br />

.<br />

Item<br />

1 Four<br />

Laning of<br />

Major SH<br />

(PPP)<br />

2 Tq. H.Q. to<br />

Tq. HQ<br />

connectin<br />

g Two<br />

lane Road<br />

3 Road<br />

Constructi<br />

on<br />

4 Strengteni<br />

ng of<br />

Existing<br />

B.T. Road<br />

5 Road<br />

Constructi<br />

on Under<br />

PMGSY<br />

6 Eigth Lane<br />

Delhi-<br />

Mumbai<br />

Ind.<br />

corridor<br />

Total<br />

lengt<br />

h (in<br />

Km)<br />

Estimat<br />

ed<br />

cost in<br />

crores<br />

217.00 1336.25<br />

Yearwise Requirement of Budget (<br />

Rs. Crores)<br />

2016 2017 2018 2019 2020<br />

408.5 307.05 37.00 2<strong>9.</strong>30 35.10 26.20 23.30<br />

5088.2 1040.58 104.05 104.05 104.05 104.05 104.05<br />

2253.0 731.08 73.00 73.00 73.00 73.00 74.00<br />

834.05 250.21 50.43<br />

91 775 110.0 110.0 110.0 110.0 115.0<br />

Remar<br />

ks<br />

Govt.<br />

Share<br />

Rs.<br />

307.25<br />

crores<br />

Total Cost 4448.17 374.58 316.35 322.15 313.25 316.51<br />

20


FOUR LANING OF MAJOR ROADS :<br />

TABLE NO. 11<br />

Sr.<br />

<strong>no</strong><br />

.<br />

Name of Road<br />

1 Aurangabad -<br />

Lengt<br />

h in<br />

km<br />

Estimate<br />

d Cost<br />

Govt.<br />

share<br />

Requirement of Necessary<br />

Estimated Budget in crores<br />

2011 2012 2013 2014 2015<br />

Rema<br />

rks<br />

Paithan Road 46.00 151.0 62.00 27.0 28.0 7.0 B.O.T.<br />

2. Aurangabad –<br />

Phulambri –<br />

Sillod –<br />

Jalgaon Road<br />

102.0 835.0 140.0 35.0 35.0 35.0 35.0 B.O.T.<br />

3. Aurangabad –<br />

Lasur –<br />

Vaijapur Road<br />

65.00 325.00 80.0 37.0 37.0 6.0 B.O.T.<br />

4. Golwadi –<br />

Nagar Naka 4.0 25.25 25.25 5.0 10.25 20.0<br />

Total 217 1336.25 307.25 32.0 73.25 8<strong>9.</strong>0 72.0 41.0<br />

21


Taluka Head Quarters Joining Two Lane Road: 2011-15<br />

TABLE NO. 12<br />

Sr.<br />

No.<br />

Name of Road<br />

1. Aurangabad –<br />

Gangapur Raod<br />

2. Aurangabad-Shivur<br />

Banglow Raod<br />

3. Isarwadi-Dahegaon<br />

Road<br />

4. Gangapur- Vaijapur<br />

Road<br />

Length<br />

for two<br />

laning<br />

Cost<br />

as per<br />

DSR<br />

2010<br />

Yearwise Physical Target &<br />

Requirement of Necessary Estimated<br />

Budget (Rs. Crores)<br />

2011 2012 2013 2014 2015<br />

10.0 5.00 2.50 2.50<br />

2<strong>9.</strong>00 14.50 2.40 2.40 2.40<br />

42.00 37.80 4.70 4.70 4.70<br />

38.00 1<strong>9.</strong>00 5.00 5.00 5.00 4.00<br />

5. Gangapur-Lasur<br />

Satation<br />

Fly-over Bridge<br />

Including<br />

24.0 37.60 4.70 4.70 4.70<br />

6. Vaijapur-Shivur<br />

Bunglow-Ourala-<br />

Chapaner Shivarai<br />

Phata<br />

7. Kannad-Pishor-Sillod<br />

8. Kannad-Nagad-<br />

Ba<strong>no</strong>ti-Soyegaon<br />

65.00 48.50 6.00 6.00 6.00<br />

65.00 32.50 4.50 4.50 4.50 4.50<br />

80.00 72.00 8.10 8.10 8.10 8.10<br />

22


Sr.<br />

No.<br />

Name of Road<br />

Length<br />

for<br />

two<br />

laning<br />

Cost<br />

as per<br />

DSR<br />

2010<br />

Yearwise Physical Target &<br />

Requirement of Necessary Estimated<br />

Budget (Rs. Crores)<br />

2011 2012 2013 2014 2015<br />

<strong>9.</strong> Khultabad-Lasur<br />

Station<br />

10. M.S.H. 8 to<br />

Soyegaon<br />

12.00 6.00 6.00<br />

12.50 6.25 3.00 3.25<br />

11. Waregaon Phata-<br />

Bazar Savangi-<br />

Bodakha-<br />

Chikalthana-<br />

Kannad<br />

31.00 27.90 3.60 3.60 3.60 3.60<br />

Total 408.50 307.05 23.70 44.50 37.55 41.00<br />

23


Taluka Head Quarters Joining Two Lane Road: Year 2016-2020<br />

TABLE NO. 13<br />

Sr.<br />

No.<br />

Name of Road<br />

Length<br />

for two<br />

laning<br />

Cost<br />

as per<br />

DSR<br />

2010<br />

Yearwise Physical Target &<br />

Requirement of Necessary Estimated<br />

Budget (Rs. Crores)<br />

2016 2017 2018 2019 2020<br />

1. Aurangabad –<br />

Gangapur Raod<br />

2. Aurangabad-Shivur<br />

Banglow Raod<br />

3. Isarwadi-Dahegaon<br />

Road<br />

4. Gangapur- Vaijapur<br />

Road<br />

5. Gangapur-Lasur<br />

Satation Including<br />

Fly-over Bridge<br />

6. Vaijapur-Shivur<br />

Bunglow-Ourala-<br />

Chapaner Shivarai<br />

Phata<br />

10.0 5.00<br />

2<strong>9.</strong>00 14.50 2.40 2.40 2.50<br />

42.00 37.80 4.70 4.70 4.70 4.70 4.90<br />

38.00 1<strong>9.</strong>00<br />

24.0 37.60 4.70 4.70 4.70 4.70 4.70<br />

65.00 48.50 6.00 6.00 6.00 6.00 6.50<br />

7. Kannad-Pishor-Sillod 65.00 32.50 4.50 4.50 5.50<br />

8. Kannad-Nagad-<br />

Ba<strong>no</strong>ti-Soyegaon<br />

80.00 72.00 8.10 8.10 8.10 8.10 7.20<br />

24


Sr.<br />

No.<br />

Name of Road<br />

Length<br />

for<br />

two<br />

laning<br />

Cost<br />

as per<br />

DSR<br />

2010<br />

Yearwise Physical Target &<br />

Requirement of Necessary Estimated<br />

Budget (Rs. Crores)<br />

2016 2017 2018 2019 2020<br />

<strong>9.</strong> Khultabad-Lasur<br />

Station<br />

10. M.S.H. 8 to<br />

Soyegaon<br />

12.00 6.00 3.00<br />

12.50 6.25<br />

11. Waregaon Phata-<br />

Bazar Savangi-<br />

Bodakha-<br />

Chikalthana-<br />

Kannad<br />

31.00 27.90 3.60 3.60 3.60 2.70<br />

Total 408.50 307.05 37.00 2<strong>9.</strong>30 35.10 26.20 23.30<br />

25


STRENGTHING TO EXISTING BLACK TOPPED ROADS<br />

TABLE NO. 14<br />

Sr.<br />

Item of<br />

Total<br />

State<br />

Major<br />

Other<br />

Village<br />

Total<br />

No.<br />

Revision<br />

Length<br />

Highway<br />

District<br />

District<br />

Roads<br />

(Rs. Crores)<br />

(In KM)<br />

Roads<br />

Roads<br />

1. Black Top<br />

2253.0 600.0 796.20 383.0 505.0 731.08<br />

Strengthing<br />

Sr.<br />

No.<br />

Road<br />

Specification<br />

ABSTRACT OF RAOD LENGTH<br />

TABLE NO. 15<br />

Existing<br />

Length in<br />

Km<br />

Existing BT<br />

Length<br />

Proposed BT<br />

Length upto<br />

2020 (100%<br />

of Existing<br />

length)<br />

Proposed<br />

S.T.B.T. Length<br />

(50% of<br />

Existing BT<br />

length)<br />

1 State Highway 1196.18 1196.18 0.0 600.00<br />

2 Major District<br />

1821.20 1592.40 228.80 796.00<br />

Highway<br />

3 Other District<br />

1703.00 766.00 937.00 383.00<br />

Highway<br />

4 Village Roads 497<strong>9.</strong>00 1011.00 3968.00 505.00<br />

Total 969<strong>9.</strong>27 4542.58 5133.8 2253.00<br />

26


Ring Road Around Aurangabad City<br />

TABLE NO. 16<br />

Sr.<br />

NO.<br />

Part Length in Km Current Status<br />

1 Zalta Bypass 2.86 Work Completed<br />

2 Beed Bypass 11.00 Work Completed<br />

3 Paithan Link 4.50 L.A. in Progress<br />

4 Tisgaon – Mitmita 6.62 L.A. in Progress<br />

5 Mitmita – Sawangi 14.40 L.A. in Progress<br />

6 Sawangi – Chikalthana 13.00 Work in Progress<br />

Total 52.38<br />

Proposed Development of Building Works:<br />

• Law University at Koradi<br />

• Vidhan Bhavan Near Jatwada Village<br />

• V.I.P. Circuit House on Jalna Road<br />

Ref: Road Development Plan 2001-2021 Aurangabad District<br />

27


Aurangabad –A’nagar Road<br />

28


Residential School at Vaijapur<br />

29


Boys Hostel at Kannad<br />

30