31.12.2014 Views

9. group no. transport & communication

9. group no. transport & communication

9. group no. transport & communication

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2016-2020<br />

Sr.<br />

<strong>no</strong><br />

.<br />

Item<br />

1 Four<br />

Laning of<br />

Major SH<br />

(PPP)<br />

2 Tq. H.Q. to<br />

Tq. HQ<br />

connectin<br />

g Two<br />

lane Road<br />

3 Road<br />

Constructi<br />

on<br />

4 Strengteni<br />

ng of<br />

Existing<br />

B.T. Road<br />

5 Road<br />

Constructi<br />

on Under<br />

PMGSY<br />

6 Eigth Lane<br />

Delhi-<br />

Mumbai<br />

Ind.<br />

corridor<br />

Total<br />

lengt<br />

h (in<br />

Km)<br />

Estimat<br />

ed<br />

cost in<br />

crores<br />

217.00 1336.25<br />

Yearwise Requirement of Budget (<br />

Rs. Crores)<br />

2016 2017 2018 2019 2020<br />

408.5 307.05 37.00 2<strong>9.</strong>30 35.10 26.20 23.30<br />

5088.2 1040.58 104.05 104.05 104.05 104.05 104.05<br />

2253.0 731.08 73.00 73.00 73.00 73.00 74.00<br />

834.05 250.21 50.43<br />

91 775 110.0 110.0 110.0 110.0 115.0<br />

Remar<br />

ks<br />

Govt.<br />

Share<br />

Rs.<br />

307.25<br />

crores<br />

Total Cost 4448.17 374.58 316.35 322.15 313.25 316.51<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!