9. group no. transport & communication
9. group no. transport & communication
9. group no. transport & communication
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2016-2020<br />
Sr.<br />
<strong>no</strong><br />
.<br />
Item<br />
1 Four<br />
Laning of<br />
Major SH<br />
(PPP)<br />
2 Tq. H.Q. to<br />
Tq. HQ<br />
connectin<br />
g Two<br />
lane Road<br />
3 Road<br />
Constructi<br />
on<br />
4 Strengteni<br />
ng of<br />
Existing<br />
B.T. Road<br />
5 Road<br />
Constructi<br />
on Under<br />
PMGSY<br />
6 Eigth Lane<br />
Delhi-<br />
Mumbai<br />
Ind.<br />
corridor<br />
Total<br />
lengt<br />
h (in<br />
Km)<br />
Estimat<br />
ed<br />
cost in<br />
crores<br />
217.00 1336.25<br />
Yearwise Requirement of Budget (<br />
Rs. Crores)<br />
2016 2017 2018 2019 2020<br />
408.5 307.05 37.00 2<strong>9.</strong>30 35.10 26.20 23.30<br />
5088.2 1040.58 104.05 104.05 104.05 104.05 104.05<br />
2253.0 731.08 73.00 73.00 73.00 73.00 74.00<br />
834.05 250.21 50.43<br />
91 775 110.0 110.0 110.0 110.0 115.0<br />
Remar<br />
ks<br />
Govt.<br />
Share<br />
Rs.<br />
307.25<br />
crores<br />
Total Cost 4448.17 374.58 316.35 322.15 313.25 316.51<br />
20