New King Abdulaziz International Airport Project<br />

<strong>Jeddah</strong>, <strong>Saudi</strong> <strong>Arabia</strong><br />

December 2011<br />

1


Presentation Layout<br />

KAIA Development Phases<br />

Phase “1” Components<br />

Main Features<br />

Current Status<br />

2


The Existing Airport in 2005<br />

3


KAIA Development Phases<br />

The existing infrastructure and facilities require major upgrade to<br />

meet increasing demand and raise passenger service levels.<br />

The GACA Master Plan was agreed in 2007, to develop KAIA in<br />

three (3) Phases:<br />

•Phase 1 (ongoing) : Capacity 30 million passengers, by 2014<br />

•Phase 2 : Capacity 43 million passengers, by 2025<br />

•Phase 3 (Ultimate) : Capacity 80 passengers, by 2035<br />

4


The Master Plan Approach<br />

The Master Plan vision is to create a state-of-the-art<br />

passenger terminal complex, essentially a new airport,<br />

developed in three phases.<br />

But it is more than just new infrastructure.<br />

The intention is to transform the passenger experience, to<br />

become a regional leader, a hub for growth, set a high<br />

standard for good service and sustainability.<br />

Long-term traffic forecasts, to 2035, for both passengers and<br />

cargo, with a range of scenarios.<br />

Private sector involvement and support, to provide increased<br />

services and commercial culture, e.g. Cargo, Airport City.<br />

5<br />

Dar Al-Handasah were appointed in 2007 as Construction<br />

Manager for Phase 1 Works


Development Phases : Phase 1, 30 MAP<br />

6


Development Phases : Phase 2, 43 MAP<br />

7


Development Phases : Phase 3, 80 MAP<br />

8


Phase 1, Design and Construction Contracts<br />

The Concept and Schematic Design was developed by ADPi in<br />

2008-09 and the Main Phase 1 Works issued for tender in<br />

2010, in two packages.<br />

Both packages were awarded to <strong>Saudi</strong> Binladen Group (SBG)<br />

in 2010. NTP was issued in January 2011, with target<br />

completion of construction in 3 years.<br />

The two packages have similar technical specifications and<br />

contractual conditions, with specific milestones and<br />

requirements as appropriate.<br />

Package 421: Passenger Terminal Building, ATC Tower and<br />

essential support facilities, contract value SR 11.986 billion<br />

9<br />

Package 422: Transportation Center, airfield works, landside<br />

infrastructure, load centers and utilities networks, contract<br />

value SR 15.125 billion


Phase 1, Early Works and Support Contracts<br />

Separate contracts for various support facilities, including:<br />

GA Terminal and Apron, SERB Building, Customs CMC<br />

<strong>Saudi</strong>a SPA Terminal<br />

Airfield Facilities Upgrade – Almabani General Contractors<br />

GSE Tunnel – Under the Centre Runway, near Cargo Terminal<br />

Deportees Terminal<br />

10


Phase 1 Development: Contract 421<br />

Passenger Terminal<br />

Building 670,000 Sq.M<br />

for all Domestic and<br />

International traffic<br />

ATC Control Tower<br />

135m high plus<br />

Western Support Tower<br />

and RFFF<br />

Two Data Centers with<br />

100% redundancy for<br />

integrated operating<br />

and control systems<br />

Passenger<br />

Terminal Building<br />

Data Center<br />

(2)<br />

Tunnels for Phase 2<br />

connection, passengers<br />

+ baggage<br />

ATC Tower<br />

Western<br />

Support Tower<br />

Data Center<br />

(1)<br />

11


Phase 1 Development: Contract 422<br />

Transportation Center,<br />

with Rail Station for<br />

high-speed links to<br />

Makkah and Madinah,<br />

multi storey car park,<br />

8,200 spaces, bus<br />

station<br />

Aprons and Taxiways,<br />

over 3M Sq.m<br />

Landside road network,<br />

bridges, underpasses,<br />

over 20Km total<br />

Fuel Tank Farm<br />

Load Center<br />

(B)<br />

Aprons &<br />

Taxiways<br />

Transportation<br />

Center & MSCP<br />

Plant Nursery<br />

Surface Car<br />

Parks<br />

Load Center<br />

(C)<br />

Three Load Centers:<br />

415 MVA power supply<br />

with emergency<br />

standby, Air<br />

Conditioning supply,<br />

Water Storage<br />

Utilities networks and<br />

tunnels across the<br />

airport ; Fuel Tank Farm<br />

Plant Nursery<br />

Airport Mosque as a<br />

landmark 12 structure<br />

Load Center<br />

(A)<br />

Mosque<br />

Landside Road<br />

Network


Areas NOT INCLUDED in KAIA Projects<br />

Cargo Village : Private Sector to develop<br />

Airport City : Separate GACA / Private Sector development<br />

<strong>Saudi</strong>a Aircraft Maintenance Facility : <strong>Saudi</strong>a to develop<br />

Aircraft Catering Facilities : Operators to develop<br />

Miscellaneous developments by others, to meet ongoing<br />

operational requirements.<br />

All developments to be controlled within the Master Plan<br />

requirements.<br />

13


Main Construction Elements<br />

14<br />

The Passenger Terminal Building, the heart of the project is<br />

spacious, 670,000 sq m floor area, to accommodate Domestic<br />

and International traffic, all scheduled airlines<br />

Design includes spectacular crescent-shaped profile, separate<br />

domestic center and international hub, connected by APM.<br />

Internal garden, extensive use of local materials and design<br />

features.<br />

Islamic artwork and museum.<br />

Transportation Center with High Speed Rail train station,<br />

Package 422 covers the Transportation Center, LRT and road<br />

transport services.<br />

Large-size aquarium, featuring unique Red Sea wildlife


Phase 1 Development<br />

15


Phase 1 Development<br />

17


Phase 1 Development<br />

18


Master Plan 19<br />

Revision G


Contract 421 & 422<br />

2- Scope of Works<br />

Scope 421 (SBG)<br />

Passenger Terminal Building : RC<br />

Construction 3m cu m + Steel Roof 30,000<br />

tonnes<br />

BHS System : 60km of belts/DCV<br />

APM system : 750m long + maintenance<br />

base and tunnel for future Phase 2<br />

46 stands with MARS capability and 96<br />

Passenger Boarding Bridges<br />

Approx 175 Special Airport Systems, for<br />

Operations, Security, Communications<br />

Fibre Optic Network across the airport, to<br />

serve 76 existing buildings + new works<br />

135m Air Traffic Control Tower & Western<br />

Support Tower<br />

Scope 422 (SBG)<br />

Utilities and Distribution Mains : 10km tunnels<br />

plus 50km utility corridors<br />

Aprons & Taxiways : 3m sq m pavements<br />

Landside Roads, Viaduct & Interchanges, over<br />

20km<br />

Multistorey car Park, 8200 spaces + Surface car<br />

parks & Transportation Centre incl. railway<br />

station.<br />

Mosque as a landmark feature<br />

4 Load Centers , 415MVA power supply, AC<br />

chillers, services supplies<br />

Tree Nursery and internal / external landscaping<br />

Data Centers, Main RFFF, Crisis<br />

Management Center, Met. Center and<br />

support facilities<br />

Fuel Tank Farm and Groundwater Control<br />

20<br />

System


Project Status<br />

Design Review of 70% Draft Final submittals for all works is<br />

proceeding, with concentrated workshop meetings<br />

On site, Civil Works are advanced : dewatering, excavation,<br />

temporary works, piling and foundation works started<br />

24-hour working<br />

Main subcontractors under SBG Main Contracts so far include:<br />

Design : Atkins, Arup, Areen<br />

BHS : Van der Lande<br />

APM : Bombardier<br />

Groundworks : Huta Hegerfeld + CDM<br />

Construction involves many firms<br />

21


Passenger Terminal Building<br />

22


Passenger Terminal Building<br />

Progress<br />

23


Control Tower<br />

Piling Under the Tower<br />

Package - 421 : Works<br />

In Progress<br />

(Facilitywise - As Of 06-Dec-<br />

11)<br />

Unit<br />

Of<br />

Meas<br />

ure<br />

Overal<br />

l<br />

Quanti<br />

ty<br />

Total to Date<br />

(Cumulative)<br />

Air Traffic Control<br />

Complex<br />

(Estimated<br />

)<br />

Quantity %<br />

Main Airtraffic Control<br />

Tower - G100A<br />

Excavation m3 1,679 1,069<br />

63.7%<br />

Piles<br />

Nos<br />

43 43<br />

100.0%<br />

Surrounding Support<br />

Buildings- G100B<br />

Excavation m3 3,197 2,197<br />

68.7%<br />

Blinding<br />

m3<br />

202 - -<br />

25


422 – Utility Tunnel<br />

26


422 – Elevated Roads & Express way<br />

28


Key Stakeholders<br />

GACA<br />

<strong>Saudi</strong>a<br />

Airport Directorate<br />

GA Operators<br />

ANS<br />

Other Airlines<br />

ARAMCO +<br />

Fuel Handling Cos<br />

All Construction<br />

Projects<br />

Construction<br />

Manager<br />

Government Authorities<br />

- Security - Safety - MOT<br />

- Customs - Immigration - NWC / MOW<br />

Utilities<br />

- Power - Water<br />

- Telephones and communications<br />

Municipality<br />

SRO<br />

RSAF<br />

IFC (Airport City)<br />

GROUND<br />

HANDLING CO<br />

30


Airport Operational Readiness (AOR)<br />

In parallel with construction, there is a comprehensive AOR<br />

programme under CM control.<br />

AOR objective is to ensure that, on opening, the facility is<br />

ready in all respects to operate safely, securely and efficiently.<br />

The AOR Programme includes key stakeholders, to develop<br />

integrated plans for staff recruitment and training, equipment,<br />

budgets and a common vision for transfer from the old and<br />

operation of the new facilities.<br />

AOR Management Structure and Process are established and<br />

will grow from now onwards.<br />

31


Next Steps<br />

Detail design development, to include Stakeholder<br />

requirements.<br />

Major works start up on site.<br />

AOR Programme starts in January 2012, to include Working<br />

Groups with users, particularly the airlines.<br />

Regular communications, progress updates will be made.<br />

Project website www.jed-airport.com<br />