FastWall System - Coke Oven Managers Association
FastWall System - Coke Oven Managers Association
FastWall System - Coke Oven Managers Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Conclusion<br />
• It is possible to reduce the time for a 3-wall<br />
replacement to 35 days and to minimize typical<br />
delays/interruptions during a repair.<br />
• It is possible to optimize mechanical demolition<br />
and installation thereby significantly improving<br />
labor conditions.<br />
• Large benefits for:<br />
– Health & Safety (labor conditions)<br />
– Plant Safety (less interaction of contractor and<br />
production).<br />
– Total Repair Cost (Cost to Customer)<br />
– <strong>Oven</strong> availability<br />
COMA <strong>Coke</strong> Conference March 2012