02.01.2015 Views

Basic Concrete w/Poured Beams - BlazeFrame

Basic Concrete w/Poured Beams - BlazeFrame

Basic Concrete w/Poured Beams - BlazeFrame

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Submittal –<strong>Basic</strong> <strong>Concrete</strong> w/<strong>Poured</strong> <strong>Beams</strong><br />

Submittal Detail - <strong>BlazeFrame</strong> "CJB" (Control Joint Backer)<br />

<strong>BlazeFrame</strong> "CJB" (Control Joint Backer<br />

Certified to ASTM E-119 Standards - (WFCi - Report #12033)<br />

Up to 2 Hour Fire Rated Protection<br />

Install Before or After Cavity Obstructions<br />

Eliminate Drywall Rips/Mineral Wool and Extra Stud<br />

Eliminate Fire Caulking of Penetrations through Cavity Drywall Rips<br />

Zinc or Vinyl Architectural Control Joint (optional)<br />

1.00"<br />

Intumescent<br />

Part #<br />

1.25" .75" 1.25"<br />

Intumescent<br />

Width<br />

Profile<br />

Width<br />

Gauge<br />

CJB-18 1.25" 3.25" .018<br />

www.blazeframe.com<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!