khandwa-burhanpur road - Madhya Pradesh Road Development ...
khandwa-burhanpur road - Madhya Pradesh Road Development ...
khandwa-burhanpur road - Madhya Pradesh Road Development ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Khandwa – Dedhtalai – Burhanpur <strong>road</strong><br />
iii.<br />
Selected stretches passing through built up area shall be widened to two lane with<br />
paved shoulder Fig 2.3 of Schedule ‘D’.<br />
2.2 Built up section having four lane divided Carriageway with Footpath<br />
Four laning carriageway having cross section Fig 2.2 of Schedule 'D' shall be constructed as<br />
follows:-<br />
Table B-1: List of Built up area Proposed for Four Lane<br />
Sr.No. Design Chainage (Km.) Length (Km) City/Town<br />
From<br />
To<br />
1 0.00 3.76 3.76 Khandwa<br />
Total Length<br />
Four laning in built up section of <strong>khandwa</strong> shall as far as possible be carried out on<br />
existing available ROW. Additional land, if required will be acquired by MPRDC at some places<br />
where sufficient ROW is not available to meet the requirement of four.<br />
2.3 Two Lane with Paved Shoulder<br />
Following stretches of <strong>road</strong> has been proposed in Two lane with 1.5 m paved shoulder and<br />
1.0 m granular shoulder on either side as shown in cross section Fig. 2.3 of Schedule ‘D’<br />
shall be constructed in following stretches shown in Table B-2.<br />
Table B-1: List of Built up area Proposed for Two Lane with Paved Shoulder<br />
Sr. Design Chainage (Km) Length (Km) City/Town<br />
No. From<br />
To<br />
Khandwa – Dedhtalai<br />
1 5.05 5.35 0.30 Tirandaajpur<br />
2 8.3 8.9 0.60 Jasvaadi<br />
3 12.84 13.24 0.40 Ranchora<br />
4 22.35 23.35 1.00 Balwaada<br />
5 32.95 33.35 0.40 Goody<br />
6 42.92 43.32 0.40 Borkheda<br />
7 52.91 53.31 0.40 Shekhpura<br />
8 53.91 54.41 0.50 Daahida<br />
Maharashtra Border -Dedhtalai – Burhanpur<br />
9 62.49 63.39 0.90 Dedhtalai<br />
10 75.85 76.82 0.97 Tukaaithud<br />
11 81.24 81.64 0.40 Maajrod<br />
12 88.84 89.44 0.60 Khajnaar<br />
13 94.46 94.76 0.30 Dhaba<br />
14 98.69 99.09 0.40 Taarkheda<br />
15 101.44 101.84 0.40 Doifodiya<br />
16 110.83 111.23 0.40 Sirpur<br />
17 115.45 115.85 0.40 Singhkheda<br />
Total Length 8.77<br />
Service <strong>Road</strong><br />
No service <strong>road</strong> is proposed along entire stretch of the project <strong>Road</strong>.<br />
______________________________________________________________________<br />
MPRDC-Bhopal December, 2010