Application of the CEMS at Thermal Power Plants<br />

system. On one hand, if a selected measurement location is a harsh environment that cannot<br />

be moderated, then an in situ system may be a poor choice. On the other hand, if space or<br />

other conditions limit the ability to locate an extractive system within an acceptable distance<br />

of the measurement location, then an in situ system may be a better choice.<br />

• Analyser accessibility. Each analyser and associated equipment should be readily accessible<br />

to facility personnel <strong>for</strong> routine maintenance.<br />

• Analyser complexity. In situ systems typically require less routine maintenance because they<br />

do not have the parts associated with sample transport and conditioning; however, the<br />

analysers themselves may be more complicated and difficult to maintain and repair. Selection<br />

of an analyser type may depend on whether a facility will have technical staff with necessary<br />

expertise to maintain the CEMS.<br />

• CEMS vendor technical support availability. The ability to readily obtain spare parts <strong>for</strong> the<br />

CEMS and receive technical support from the vendor in Abu Dhabi Emirate should be<br />

considered in the CEMS design.<br />