Emissions <strong>Monitoring</strong> Reports<br />

Annex 3d—Examples of How to Calculate Values During Periods<br />

of CEM Malfunction or Calibration<br />

Day<br />

Hour<br />

NO x<br />

Reading<br />

(ppm)<br />

Power a<br />

(MW)<br />

01/01/2009 01:00 50 100<br />

Comment<br />

01/01/2009 02:00 50 100<br />

01/01/2009 03:00 40 91<br />

01/01/2009 04:00 50 100<br />

01/01/2009 05:00 47.5 100<br />

01/01/2009 06:00 50 100<br />

NO x CEM malfunction. Values presented are averages <strong>for</strong> hours 01, 02, 03,<br />

and 04, and 06, 08, 09, and 10.<br />

01/01/2009 07:00 30 83<br />

01/01/2009 08:00 50 92<br />

01/01/2009 09:00 50 100<br />

01/01/2009 10:00 40 100<br />

01/01/2009 11:00 30 62<br />

01/01/2009 12:00 30 64<br />

01/01/2009 13:00 30 61<br />

01/01/2009 14:00 40 70<br />

01/01/2009 15:00 33.8 70<br />

01/01/2009 16:00 45.0 100<br />

01/01/2009 17:00 50 100<br />

NO x CEM malfunction. Values presented are averages <strong>for</strong> hours 11, 12, 13,<br />

and 14, and 18, 19, 20, and 21.<br />

NO x CEM malfunction. Values presented are averages <strong>for</strong> hours 07, 08, 09,<br />

and 10, and 17, 22, 23, and 24.<br />

01/01/2009 18:00 40 80<br />

01/01/2009 19:00 30 70<br />

01/01/2009 20:00 40 70<br />

01/01/2009 21:00 30 62<br />

01/01/2009 22:00 40 90<br />

01/01/2009 23:00 50 100<br />

01/01/2009 24:00 50 100<br />

ppm = parts per million.<br />

a Plant has a rated power of 100 MW; there<strong>for</strong>e, ±10% of the rated power is ±10 MW.<br />

NOTE: Values in bold italic are computed based on the average of the values in the nearest 4 hours be<strong>for</strong>e and 4 hours after instrument<br />

malfunction that were at a plant power level of ±10 MW of the power during instrument malfunction.<br />