Coffs Harbour City Centre Masterplan 2031
Coffs Harbour City Centre Masterplan 2031
Coffs Harbour City Centre Masterplan 2031
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Strategy: Bike Plan (S-BP)<br />
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
HARBOUR DRIVE<br />
PARK AVENUE<br />
ALBANY STREET<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
EARL STREET<br />
CURACAO STREET<br />
N<br />
Principle: The greatest revolution of sustainable transport<br />
underway in progressive cities is welcoming bikes into the <strong>City</strong><br />
<strong>Centre</strong> as a viable alternative transport choice. By shifting even<br />
a portion of people going to work onto a bike cities significantly<br />
benefit socially, economically and environmentally.<br />
Finding: The opportunity exists to extend the existing cycle<br />
network into the <strong>City</strong> <strong>Centre</strong> and provide the framework for a<br />
balanced, sustainable transport network to evolve over time.<br />
Benefits:<br />
• To appeal to an emerging demographic;<br />
<strong>Coffs</strong> <strong>Harbour</strong> Existing Cycle Route Map (excerpt and design overlay)..<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />
y<br />
0m 100 200<br />
GUNDAGAI PLACE<br />
Connects to<br />
Pacific Hwy<br />
cycleway<br />
Figure 3. Bike Plan.<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
ALBANY STREET<br />
3 min to<br />
Thompson Rd<br />
cycleway<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />
COFF STREET<br />
CASTLE STREET<br />
PARK AVENUE<br />
GORDON STREET<br />
HARBOUR DRIVE<br />
EARL STREET<br />
Connects to Pacific<br />
Hwy cycleway<br />
DUKE STREET<br />
CURACAO STREET<br />
0m 100 200<br />
< 1 min to<br />
<strong>Coffs</strong> Creek<br />
cycleway<br />
10 min<br />
to Jetty<br />
N<br />
3 min to<br />
Botanic<br />
Gardens<br />
• To provide opportunities to leverage off of associated retail<br />
uses such as bike rental and repair shops;<br />
• To increase retail sales along bike routes consistent with<br />
research findings into retail spending patterns;<br />
• To facilitate a shift in modal choice resulting in additional<br />
parking capacity;<br />
• To use the Gordon Street trial to observe increased cycle<br />
activity and monitor the areas where bicycles are parked<br />
informally and provide formal parking and end of trip<br />
facilities in these locations; and<br />
• To most efficiently utilise <strong>City</strong> <strong>Centre</strong> land when 10 parked<br />
bikes occupy the same area as one parked car.<br />
Projects:<br />
Use Gordon St between Coff St and <strong>Harbour</strong><br />
Dr as the trial for a separated cycleway and<br />
intersection performance.<br />
Implement the <strong>City</strong> <strong>Centre</strong> Street<br />
Reconfiguration Project for all streets.<br />
Adopt the <strong>City</strong> <strong>Centre</strong> Bike Plan.<br />
Strengthen and promote Ride-To-Work Day<br />
and family cycling events and education days.<br />
Provide +100 bike racks and end of trip<br />
facilities at locations identified through<br />
observation of ad- hoc parking locations.<br />
Incorporate end of trip facilities into the Bus<br />
Hub and into new developments in the <strong>City</strong><br />
<strong>Centre</strong> core as required over time.<br />
Cost:<br />
$275,650<br />
Refer to (P- SR)<br />
p.42<br />
N/A<br />
Refer to (P- EP)<br />
p.57<br />
TBD<br />
TBD<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 12