Coffs Harbour City Centre Masterplan 2031
Coffs Harbour City Centre Masterplan 2031
Coffs Harbour City Centre Masterplan 2031
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COFFS HARBOUR CITY CENTRE<br />
MASTERPLAN <strong>2031</strong>
The <strong>City</strong> <strong>Centre</strong> will be a destination<br />
featuring world class design of<br />
the physical fabric that creates a<br />
unique and creative streetscape<br />
that inspires all who visit.<br />
A VISION To Inspire<br />
To create a place where economic, social and cultural pursuits fuse to<br />
enrich and enliven all who live, work and visit the <strong>City</strong> <strong>Centre</strong>.<br />
At our core will be a strong heart from which the ripples of vibrancy<br />
and prosperity will flow throughout the <strong>City</strong> <strong>Centre</strong> and to the region as<br />
a whole.<br />
We will build on our parents’ achievements for our next generation<br />
so that they may live better than us.<br />
Let’s reignite a glow in the <strong>City</strong> <strong>Centre</strong> that we locals are proud of<br />
and for which visitors become attached to.<br />
We will lay the foundation to encourage long term development<br />
and investment in the <strong>City</strong> <strong>Centre</strong> through careful planning and real<br />
incentives that ensure retail, business, leisure, cultural and residential<br />
interests flourish.<br />
The <strong>City</strong> <strong>Centre</strong> will be a destination featuring world class design of<br />
the physical fabric that creates a unique and creative streetscape that<br />
inspires all who visit.<br />
The <strong>City</strong> <strong>Centre</strong> is to be reinstated as the key retail precinct<br />
in <strong>Coffs</strong> <strong>Harbour</strong> as it historically has been - providing additional<br />
secondary benefits compared to other standalone retail centres.<br />
For the <strong>City</strong> <strong>Centre</strong> to be the core entertainment precinct of <strong>Coffs</strong><br />
<strong>Harbour</strong> which regionally attracts festivities and events for the social<br />
and economic benefit of the community and as a new attraction for<br />
tourists.<br />
Complementing the entertainment precinct will be numerous cultural<br />
initiatives that showcase and encourage the talent of our many<br />
artists, musicians, chefs and local providores.<br />
We will create an attractive urban environment rich in lifestyle facilities<br />
that attracts residential living to the <strong>City</strong> <strong>Centre</strong> consistent with<br />
today’s residential needs and expectations.<br />
Let’s live and work in a place where environmentally sustainable<br />
practices, healthy living and a greening of the <strong>City</strong> <strong>Centre</strong> become<br />
the new benchmarks in our daily lives.
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong>- Contents<br />
2. CITY CENTRE MASTERPLAN <strong>2031</strong><br />
4<br />
12. IMPLEMENTATION<br />
55<br />
3. PRINCIPLES<br />
4. OBJECTIVES<br />
9. STRATEGIES AND PROJECTS<br />
5<br />
6<br />
7<br />
13. IMPLEMENTATION-<br />
STRATEGIES AND PROJECTS MATRICES<br />
13. IMPLEMENTATION-<br />
SPECIAL RATE VARIATION FUNDING MATRIX<br />
56<br />
57<br />
10. STRATEGIES<br />
8<br />
14. CROWDFUNDING<br />
58<br />
ACCESS AND MOVEMENT<br />
KEY CONNECTIONS (S- KC)<br />
BIKE PLAN (S- BP)<br />
PARKING (S- P)<br />
9<br />
10<br />
12<br />
14<br />
13. IMPLEMENTATION-<br />
ALTERNATIVE FUNDING MATRIX<br />
5. PREMISE OF THE VISION<br />
59<br />
60<br />
LEGIBILITY<br />
CITY CENTRE LEGIBILITY (S- CCL)<br />
BRAND POSITIONING (S- BP)<br />
CITY CENTRE MANAGEMENT (S- CCM)<br />
KEY LAND USE AND OPEN SPACE<br />
STRATEGIC SITES (S- SS)<br />
REAR LANE ACTIVATION (S- RLA)<br />
DEVELOPMENT INCENTIVE POLICY (S- DIP)<br />
RESILIENCE AND FLOOD PLAN (S- RFP)<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
6. BASELINE DATA ASSESSMENT-<br />
A CITY WITH A FANTASTIC FOUNDATION<br />
7. BASELINE DATA ASSESSMENT-<br />
CITY CENTRE CHALLENGES<br />
8. COMMUNITY ENGAGEMENT<br />
APPENDIX 1- LANDSCAPE AND MATERIALS PALETTE<br />
APPENDIX 2- SUPPORTING TRANSPORT REPORT<br />
61<br />
62<br />
63<br />
11. PROJECTS<br />
24<br />
HARBOUR DRIVE ACCESS (P- HDA)<br />
WAYFINDING (P- WF)<br />
CITY SAILS (P- CS)<br />
CITY SQUARE (P- CQ)<br />
CITY SQUARE CULTURAL BUILDING (P- CQCB)<br />
ENTERTAINMENT CENTRE (P- EC)<br />
ROUNDABOUT RETROFIT (P- RR)<br />
BUS HUB LOCATION (P- BHL)<br />
CASTLE STREET CARPARK (P- CSC)<br />
STREET RECONFIGURATION (P- SR)<br />
BRELSFORD PARK (P- BP)<br />
EVENTS PROGRAM (P- EP)<br />
25<br />
26<br />
27<br />
29<br />
30<br />
34<br />
35<br />
36<br />
37<br />
38<br />
53<br />
54<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
3
<strong>City</strong> <strong>Centre</strong><br />
<strong>Masterplan</strong> <strong>2031</strong><br />
The <strong>Masterplan</strong> builds on the work of four related<br />
documents: Our Living <strong>City</strong> Settlement Strategy, <strong>City</strong><br />
<strong>Centre</strong> Vision, Working Group Vision and draft LEP / DCP<br />
2012. While the previous documents focus on a range of<br />
issues, this report focuses solely on the <strong>City</strong> <strong>Centre</strong> study<br />
area, as identified on page 61, and the priority Strategies<br />
and Projects to improve it. These works will largely be<br />
funded by a proposed Special Rate for the <strong>City</strong> <strong>Centre</strong>, as<br />
well as other funding mechanisms.<br />
In preparing this report, Council contracted in 2012 a multidisciplinary<br />
team comprising ROBERTSDAY + AHH + GTA<br />
+ I&BM + NORTHROP + STRAIGHT TALK to work with the<br />
community and stakeholders. The expertise of each firm<br />
and its role in the project is outlined on the back cover.<br />
The balance of this report supports the Vision and provides<br />
an overview of the <strong>City</strong> <strong>Centre</strong> Principles and Objectives<br />
before focusing on the specific Strategies and Projects to<br />
realise the Vision and to create a prosperous <strong>City</strong> <strong>Centre</strong> by<br />
<strong>2031</strong>.<br />
The Vision is underpinned by five key premises outlined in<br />
Premise of the Vision (p. 59) and originates from the Baseline<br />
Data Assessment, summarised within A <strong>City</strong> With A Fantastic<br />
Foundation (p. 60) and <strong>City</strong> <strong>Centre</strong> Challenges (p. 61), and<br />
feedback gained from a rigorous consultation process<br />
outlined in Community Engagement (p. 62).<br />
Proposed evolution of the <strong>City</strong> Square into a dynamic cultural building and <strong>City</strong> focal point for <strong>2031</strong>.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
4
PRINCIPLES To Guide<br />
The 21st Century <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> will play to<br />
its strengths, be better than its competitors and never<br />
try to be something that it is not.<br />
The Principles outlined below will guide the future development of the <strong>City</strong><br />
<strong>Centre</strong>. The driving Principles detailed under the specific Strategies and<br />
Projects within this <strong>Masterplan</strong> support and reinforce the primary guiding<br />
Principles below.<br />
The <strong>City</strong> <strong>Centre</strong> stands united as one retail, business, cultural and<br />
entertainment precinct with preferred development to occur as close to the<br />
<strong>City</strong> Square as possible.<br />
Having a strong core in the <strong>City</strong> <strong>Centre</strong> is a prerequisite to that strength<br />
flowing to its outer boundaries.<br />
The primary qualities of safety, cleanliness and convenience must be achieved<br />
before placemaking endeavours can be fully realised.<br />
Development will be encouraged which is best practice and of a high quality<br />
modern standard that will lay the foundation for decades to come.<br />
For all stakeholders to work cohesively and passionately together to deliver<br />
greater results.<br />
Ensure the economic benefits of the Special Rate levy, are, in the long term,<br />
passed onto landowners through higher property values, to businesses<br />
through higher incomes and the community through better facilities and<br />
employment.<br />
To increase the capacity of the <strong>City</strong> <strong>Centre</strong> to foster economic growth and to<br />
meet the demographic needs of <strong>Coffs</strong> <strong>Harbour</strong> which is characterised by a<br />
high population growth rate and an aging population.<br />
To provide short term stimulus measures to revitalise the <strong>City</strong> <strong>Centre</strong>, reduce<br />
the number of vacant shopfronts and increase retail sales.<br />
To work with private landowners and prospective investors to create economic<br />
opportunities through compelling development incentives.<br />
Through upfront investment in the public domain the <strong>City</strong> <strong>Centre</strong> may experience a development renaissance which will position it as a vibrant 21st Century <strong>City</strong>.<br />
The <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> will be a living document that<br />
delivers short-term activation strategies and lays the groundwork for longer<br />
term dreams.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
5
OBJECTIVES To Deliver<br />
MOONEE ST<br />
CITY SQUARE<br />
GORDON ST<br />
At night, <strong>Coffs</strong> <strong>City</strong> <strong>Centre</strong> will come vibrantly to life with decorative lighting and light<br />
shows playing within the iconic shade sails whilst enhancing the safety and security<br />
of those out enjoying the cafés and al fresco dining that spills into the public domain.<br />
MOONEE ST<br />
CITY SQUARE<br />
PARK AVENUE<br />
PARK AVENUE<br />
HARBOUR DRIVE<br />
GORDON ST<br />
HARBOUR DRIVE<br />
EARL ST<br />
Key <strong>City</strong> <strong>Centre</strong> Street Projects will improve connectivity, legibility and contribute to the <strong>City</strong> <strong>Centre</strong> brand.<br />
EARL ST<br />
‘Street Greening’ will enhance the streetscape experience, attracting visitors and encouraging walking and cycling.<br />
The implementation of the Strategies and Projects<br />
contained within this <strong>Masterplan</strong> are proposed to meet the<br />
<strong>City</strong> <strong>Centre</strong> Objectives below.<br />
<strong>Coffs</strong> <strong>Harbour</strong>’s CBD will be transformed and re-branded as<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>.<br />
Current <strong>City</strong> <strong>Centre</strong> streetscapes will be enhanced as linear<br />
parks with trees, shrubs, street furniture and additional<br />
shade sails strategically located to identify the <strong>City</strong> <strong>Centre</strong>,<br />
welcome visitors and provide clear pedestrian links and<br />
weather protection along key connections.<br />
Through traffic will be directed around the <strong>City</strong> <strong>Centre</strong> by a<br />
series of clearly marked ring roads while movement within<br />
the area will be slowed, creating a safe, friendly zone for<br />
pedestrians, bikes, and mobility scooters.<br />
At night, the <strong>City</strong> <strong>Centre</strong> will come vibrantly to life with<br />
decorative lighting and light shows playing within the<br />
iconic shade sails whilst enhancing the safety and security<br />
of those out enjoying the cafés and al fresco dining that<br />
spills into the public domain.<br />
The <strong>City</strong> Square will become the beating heart of the <strong>City</strong><br />
<strong>Centre</strong>, with an outdoor performance space featuring<br />
social and cultural events and attractions intermixed with<br />
bustling night as well as day markets, full of fresh local<br />
produce and wares from local creative industries.<br />
Wide footpaths, strategically placed cycleways and<br />
attractive, landscaped thoroughfares will make the <strong>City</strong><br />
<strong>Centre</strong> safer and more accessible for visitors and locals<br />
alike. The visual appeal and easy access will encourage<br />
walking and cycling, promoting a healthier lifestyle and<br />
less reliance on motor vehicles.<br />
This community revival is the commendable result of<br />
economic interests leading by example. The <strong>Masterplan</strong><br />
demonstrates their commitment to the growth and<br />
evolution of the <strong>City</strong> <strong>Centre</strong> and to the establishment of<br />
<strong>Coffs</strong> <strong>Harbour</strong> as the regional capital and a world class<br />
tourism destination.<br />
A collection of lifestyle assets including pools, gyms, parks,<br />
walkways, cycleways, playgrounds, library, art gallery and<br />
day spas will continue to be developed, enticing inner city<br />
residential living as well as increased daily visitation.<br />
The communal, social and cultural wealth of <strong>Coffs</strong> <strong>Harbour</strong><br />
will be enhanced through realising the full potential of<br />
government assets including land, buildings and services.<br />
Several strategic sites will be targeted to deliver a new<br />
cultural, entertainment and civic building which may be<br />
located separately or multi- functionally according to<br />
funding and commercial opportunities. Preference will be<br />
given to locating these community assets as close to the<br />
<strong>City</strong> Square as possible subject to delivering the highest<br />
level of community benefit.<br />
Whilst encouraging more sustainable transport, we are<br />
conscious of the need to protect and enhance business<br />
viability. Great care is to be applied to the integration of<br />
<strong>City</strong> <strong>Centre</strong> user traffic, public transport, carparking, cycling<br />
and pedestrian movement to ensure the maximisation<br />
of all these resources and their continuing improvement.<br />
Greater utilisation of existing parking facilities will be<br />
achieved by the improvement of access and security and<br />
the relocation of long-term parking to the outer perimeter.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
6
Street Reconfiguration Project for Park Avenue demonstrating ‘street efficiency’ benefits including street greening and widened pedestrian footpaths.<br />
Strategies and Projects<br />
The <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> is not just<br />
another planning document. It represents a new approach to<br />
<strong>City</strong> design by 1) viewing collaboration of public and private<br />
actions as an evolving process 2) recognising the value of quick,<br />
affordable tools in creating instant impact and promoting long<br />
term change and 3) aligning strategy with projects to build<br />
towards a pragmatic utopia.<br />
This approach towards a pragmatic utopia is supported by the<br />
goal being a vibrant, connected and green <strong>City</strong> <strong>Centre</strong>. Rather<br />
than being viewed in isolation, there exists a fertile overlap<br />
between each goal where the maximum benefit for the <strong>City</strong><br />
<strong>Centre</strong> can be achieved.<br />
It is on this basis, the city-wide Strategies and place-specific<br />
Projects have been conceived. They are the heart of the<br />
<strong>Masterplan</strong>. The Strategies provide the overall framework<br />
for improving the urban vitality of the <strong>City</strong>. The Projects<br />
often get the most attention as they are implemented, such<br />
as an improved <strong>City</strong> Square, a new Cultural Building and<br />
the like. What is important to remember though, is that it<br />
is a commitment to the long term Strategy that ultimately<br />
reconciles and diffuses any short term frustration caused by<br />
a specific Project as the <strong>City</strong> transitions to a more resilient,<br />
sustainable and prosperous future.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
7
Strategies<br />
KEY CONNECTIONS (S- KC)<br />
BIKE PLAN (S- BP)<br />
PARKING (S- P)<br />
CITY CENTRE LEGIBILITY (S- CCL)<br />
BRAND POSITIONING (S- BP)<br />
CITY CENTRE MANAGEMENT (S- CCM)<br />
STRATEGIC SITES (S- SS)<br />
REAR LANE ACTIVATION (S- RLA)<br />
DEVELOPMENT INCENTIVE POLICY (S- DIP)<br />
RESILIENCE AND FLOOD PLAN (S- RFP)<br />
10<br />
12<br />
14<br />
16<br />
17<br />
18<br />
20<br />
21<br />
22<br />
23<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />
8
Access and Movement<br />
BERYL STREET<br />
SHOWGROUND<br />
One of the key objectives of this <strong>Masterplan</strong> is to achieve a<br />
connected <strong>City</strong> <strong>Centre</strong>. The Strategies and Projects outlined<br />
within the <strong>Masterplan</strong> will result in an environment where there<br />
is a balance between the pedestrian, cyclist, public transport<br />
and private vehicle. Equitable access will be key to the evolution<br />
of the <strong>City</strong> <strong>Centre</strong> towards <strong>2031</strong>.<br />
AZALEA AVENUE<br />
GUNDAGAI PLACE<br />
MCLEAN STREET<br />
WEST HIGHT STREET<br />
MURDOCH STREET<br />
P<br />
KORFF STREET<br />
SCARBA STREET<br />
LYSTER STREET<br />
P<br />
MOONEE STREET<br />
ELBOW STREET<br />
P<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
P<br />
COFF STREET<br />
4.<br />
P<br />
CASTLE STREET<br />
GORDON STREET<br />
3.<br />
1.<br />
DUKE STREET<br />
2.<br />
The plan opposite illustrates the multi- modal intent of the<br />
<strong>Masterplan</strong> and compatibility of the transport systems. The<br />
Details below are discussed as components of the Strategies<br />
and Projects within the balance of this document.<br />
ACCESS AND MOVEMENT<br />
<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />
Existing Block<br />
Existing Building Footprint<br />
Development Outside Study Area<br />
Pacific Highway<br />
Pedestrian Connection<br />
AZALEA AVENUE<br />
MEADOW STREET<br />
COMBINE STREET<br />
HILL STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
MARKET STREET<br />
P<br />
P<br />
ALBANY STREET<br />
PARK AVENUE<br />
EARL STREET<br />
HARBOUR DRIVE<br />
P<br />
Street Reconfiguration<br />
Roundabout Retrofit<br />
Cycleway- Separated<br />
Cycleway - Park Trail<br />
Bus Hub<br />
Access Improvement<br />
Inner Ring Road<br />
Carpark Investigation Site<br />
Details<br />
CURACAO STREET<br />
1.<br />
2.<br />
3.<br />
4.<br />
Gordon Street- Trial ‘Display Street Reconfiguration’<br />
<strong>Coffs</strong> Bridge Upgrade<br />
Duke Street Extension<br />
Castle Street Carpark- New Rooftop Sail and Lift<br />
Figure 1. Access and Movement Plan.<br />
0m 100 200<br />
N<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Access and Movement<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 9
AZALEA AVENUE<br />
AZALEA AVENUE<br />
MEADOW STREET<br />
COMBINE STREET<br />
MCLEAN STREET<br />
GUNDAGAI PLACE<br />
MURDOCH STREET<br />
WEST HIGHT STREET<br />
HILL STREET<br />
KORFF STREET<br />
SCARBA STREET<br />
LYSTER STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
8. 4.<br />
1.<br />
10.<br />
8.<br />
ELBOW STREET<br />
LITTLE STREET<br />
2.<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
PARK AVENUE<br />
ALBANY STREET<br />
BERYL STREET<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
3.<br />
5.<br />
10.<br />
EARL STREET<br />
CURACAO STREET<br />
HARBOUR DRIVE<br />
SHOWGROUND<br />
6.<br />
8.<br />
9.<br />
+<br />
7.<br />
0m 100 200 N<br />
1. Police Station redevelopment is to retain the public 2. Future redevelopment is 3. <strong>Coffs</strong> Central 4. Pedestrian 5. Pedestrian crossing to be<br />
connection between Lyster St. Carpark and Pacific Hwy.<br />
and<br />
Improve Pacific Hwy pedestrian crossing.<br />
to retain public connection<br />
between Moonee St. Carpark<br />
and Vernon St.<br />
to provide for<br />
extended mall<br />
access.<br />
crossing from<br />
Moonee St. to<br />
<strong>Harbour</strong> Dr.<br />
included at Beryl St. (Justice<br />
Precinct) signals. Note: Funded<br />
by State Government.<br />
6. Improve <strong>Coffs</strong> Creek Bridge to<br />
increase cycle and pedestrian use.<br />
7. Formalise the proposed<br />
Duke St. connection.<br />
8. Complete and connect rear laneways for rear vehicle access encouraging<br />
new development to address open space and key streets.<br />
9. Extend the right turn lane at the intersection of Pacific Hwy<br />
and Albany St.<br />
10. Establish a <strong>City</strong> <strong>Centre</strong> ring road with the Pacific Hwy and Coff St. and<br />
11. Facilitate outer ring road<br />
Albany St. as key connection points.<br />
(diagram overleaf).<br />
Strategy: Key Connections<br />
(S- KC)<br />
Principle: A <strong>City</strong> <strong>Centre</strong> movement network should allow safe and<br />
equitable access for cars, pedestrians and cyclists. By providing a<br />
number of routes and a hierarchy of thoroughfares traffic can selfregulate<br />
and the function of the <strong>City</strong> <strong>Centre</strong> will improve.<br />
Finding: The city benefits from a robust street network however,<br />
there are a number of missing links. Completing these missing links<br />
will improve the legibility and permeability of the <strong>City</strong> over time.<br />
Benefits:<br />
• To alleviate current capacity issues encouraging drivers to<br />
visit the <strong>City</strong> <strong>Centre</strong>;<br />
• To bypass <strong>Harbour</strong> Drive and the <strong>City</strong> <strong>Centre</strong>;<br />
• To accept driving slower in order to be a part of the retail,<br />
civic and cultural experience of <strong>Harbour</strong> Drive;<br />
• To improve pedestrian connections across the Pacific<br />
Highway;<br />
• To improve legibility, access and safety by encouraging<br />
mid- block pedestrian connections as part of private<br />
development; and<br />
• To provide a recreational loop for pedestrians and cyclists<br />
connecting the <strong>City</strong> <strong>Centre</strong> to parks and natural assets.<br />
Projects:<br />
Facilitate the function of an outer ring road.<br />
Establish a <strong>City</strong> <strong>Centre</strong> inner ring road.<br />
Provide and formalise the Duke St extension as<br />
a permanent component of the inner ring road.<br />
Incorporate pedestrian crossings with <strong>City</strong> Sail<br />
Projects including Pacific Hwy/ <strong>Harbour</strong> Dr<br />
intersection.<br />
N/A<br />
N/A<br />
$300,000<br />
TBD<br />
Upgrade the <strong>Coffs</strong> Creek Bridge. $36,900<br />
Extend the right turn lane onto Albany St to<br />
alleviate current capacity issues and ensure<br />
satisfactory operation into the future.<br />
Incentivise private developers to realise the<br />
mid- block pedestrian connections and rear<br />
laneways.<br />
<strong>Coffs</strong> Central to provide extended mall access.<br />
Cost:<br />
$200,000<br />
N/A<br />
N/A<br />
Figure 2. Key Connections Plan.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 10
ORLANDO STREET<br />
PACIFIC HIGHWAY<br />
WEST HIGH STREET<br />
HARBOUR DRIVE<br />
HOGBIN DRIVE<br />
LEGEND<br />
CITY CENTRE<br />
CITY CENTRE OUTER RING ROAD<br />
STADIUM DRIVE<br />
PACIFIC HIGHWAY<br />
CITY CENTRE MAIN STREET<br />
11. Strategy: Key Connections (S- KC) - THE OUTER RING ROAD<br />
0m 200 400 N<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 11
Strategy: Bike Plan (S-BP)<br />
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
HARBOUR DRIVE<br />
PARK AVENUE<br />
ALBANY STREET<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
EARL STREET<br />
CURACAO STREET<br />
N<br />
Principle: The greatest revolution of sustainable transport<br />
underway in progressive cities is welcoming bikes into the <strong>City</strong><br />
<strong>Centre</strong> as a viable alternative transport choice. By shifting even<br />
a portion of people going to work onto a bike cities significantly<br />
benefit socially, economically and environmentally.<br />
Finding: The opportunity exists to extend the existing cycle<br />
network into the <strong>City</strong> <strong>Centre</strong> and provide the framework for a<br />
balanced, sustainable transport network to evolve over time.<br />
Benefits:<br />
• To appeal to an emerging demographic;<br />
<strong>Coffs</strong> <strong>Harbour</strong> Existing Cycle Route Map (excerpt and design overlay)..<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />
y<br />
0m 100 200<br />
GUNDAGAI PLACE<br />
Connects to<br />
Pacific Hwy<br />
cycleway<br />
Figure 3. Bike Plan.<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
ALBANY STREET<br />
3 min to<br />
Thompson Rd<br />
cycleway<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />
COFF STREET<br />
CASTLE STREET<br />
PARK AVENUE<br />
GORDON STREET<br />
HARBOUR DRIVE<br />
EARL STREET<br />
Connects to Pacific<br />
Hwy cycleway<br />
DUKE STREET<br />
CURACAO STREET<br />
0m 100 200<br />
< 1 min to<br />
<strong>Coffs</strong> Creek<br />
cycleway<br />
10 min<br />
to Jetty<br />
N<br />
3 min to<br />
Botanic<br />
Gardens<br />
• To provide opportunities to leverage off of associated retail<br />
uses such as bike rental and repair shops;<br />
• To increase retail sales along bike routes consistent with<br />
research findings into retail spending patterns;<br />
• To facilitate a shift in modal choice resulting in additional<br />
parking capacity;<br />
• To use the Gordon Street trial to observe increased cycle<br />
activity and monitor the areas where bicycles are parked<br />
informally and provide formal parking and end of trip<br />
facilities in these locations; and<br />
• To most efficiently utilise <strong>City</strong> <strong>Centre</strong> land when 10 parked<br />
bikes occupy the same area as one parked car.<br />
Projects:<br />
Use Gordon St between Coff St and <strong>Harbour</strong><br />
Dr as the trial for a separated cycleway and<br />
intersection performance.<br />
Implement the <strong>City</strong> <strong>Centre</strong> Street<br />
Reconfiguration Project for all streets.<br />
Adopt the <strong>City</strong> <strong>Centre</strong> Bike Plan.<br />
Strengthen and promote Ride-To-Work Day<br />
and family cycling events and education days.<br />
Provide +100 bike racks and end of trip<br />
facilities at locations identified through<br />
observation of ad- hoc parking locations.<br />
Incorporate end of trip facilities into the Bus<br />
Hub and into new developments in the <strong>City</strong><br />
<strong>Centre</strong> core as required over time.<br />
Cost:<br />
$275,650<br />
Refer to (P- SR)<br />
p.42<br />
N/A<br />
Refer to (P- EP)<br />
p.57<br />
TBD<br />
TBD<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 12
2012: 4,500 residents are within a 5 minute bike ride of the <strong>City</strong> <strong>Centre</strong>.<br />
<strong>2031</strong>: 9,000 residents within a 10 minute bike ride of the <strong>City</strong> <strong>Centre</strong>.<br />
5 min/ 1.6km<br />
10 min/ 3.2km<br />
Strategy: Bike <strong>Masterplan</strong> (S-BP)- THE IMMEDIATE POTENTIAL<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 13
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
Figure 4. Potential Parking Location Plan.<br />
The Cultural <strong>Centre</strong> at the<br />
<strong>City</strong> Square would provide an<br />
integrated parking solution at<br />
the core of the <strong>City</strong> <strong>Centre</strong>.<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET T<br />
ALBANY STREET<br />
COFF STREET<br />
CASTLE TLE STREET<br />
PARK AVENUE<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Decked Carparking Capacity<br />
POTENTIAL CARPARK FUNDING MODELS<br />
The Castle Street/ Riding<br />
Lane Carpark extension could<br />
provide an additional 40 spaces<br />
over 3 levels= 120 spaces<br />
GORDON RDON STREET<br />
HARBOUR DRIVE<br />
EARL STREET<br />
DUKE STREETTREET<br />
CURACAO STREET<br />
0m 100 200<br />
• Joint Ventures with a private developer using existing Council owned<br />
land;<br />
• Government Grants;<br />
• Special Infrastructure Contribution;<br />
• Select charging for parking;<br />
• One-off rates payment;<br />
• Leasing Options; and<br />
• Crowdfunding.<br />
N<br />
Strategy: Parking (S-P)<br />
Principle: A mix of limited and unlimited, paid and unpaid<br />
carparking that is appropriately located, accessible, safe and ample<br />
is the basis for ensuring retail success.<br />
Finding: The free supply Addi of parking in the core of the <strong>City</strong> <strong>Centre</strong> is<br />
near capacity. Employees Requ occupy spaces for longer term parking. If<br />
visitors can’t park, they can’t shop.<br />
@ 20<br />
Benefits:<br />
= 1.6<br />
• To drive retail and commercial activities;<br />
= 5%<br />
• To provide for additional = $1 capacity for community, civic and<br />
cultural activities;<br />
• To improve parking capacity in the short- term;<br />
• To utilise sites immediately outside the <strong>City</strong> <strong>Centre</strong> to<br />
supplement <strong>City</strong> <strong>Centre</strong> long term parking requirements;<br />
• To encourage use of 170 under utilised spaces on the roof of<br />
the Castle Street Carpark and investigate expansion here;<br />
• To promote use of sustainable transport;<br />
• To reduce the need to over- deliver carparks; and<br />
• To encourage immediate development investment.<br />
Projects<br />
Convert 100 ‘all day’ carparks in the Castle St<br />
Carpark to 3 hour parking.<br />
Cost:<br />
N/A<br />
Provide shade sails/ lift at Castle St Carpark. $900,000<br />
Enforce short- term parking limits using rangers<br />
and scanner technology.<br />
Increase utilisation rates of existing spaces by<br />
upgrading and ensuring a basic level of safety,<br />
cleanliness and convenience at Castle St and<br />
Park Ave Carparks and amenities at Riding Ln.<br />
Revise S94 specifications to fund the Castle St/<br />
Riding Ln Carpark expansion.<br />
Installation of +100 bike racks to promote<br />
cycling to work.<br />
Provide cycle and bus infrastructure to achieve<br />
the modal shift goal of 10%.<br />
To encourage private development of additional<br />
carparks over the long term at potential<br />
locations identified in Figure 5.<br />
To improve the legibility of the bay markings to<br />
encourage proper use.<br />
N/A<br />
$375,000<br />
N/A<br />
TBD<br />
Refer to (P- SR)<br />
p.42<br />
N/A<br />
TBD<br />
SUMMARY:<br />
The core of the <strong>City</strong> <strong>Centre</strong> study area is at parking<br />
capacity.<br />
By <strong>2031</strong> an additional 630 short term parking<br />
spaces will be needed.<br />
Any spaces lost through the Street Reconfiguration<br />
Project within this <strong>Masterplan</strong> are balanced out by<br />
the under utilised spaces on the <strong>City</strong> <strong>Centre</strong> fringe.<br />
The new shade sail and lift at the Castle Street<br />
Carpark will increase the utilisation rate of the 170<br />
empty upper level spaces.<br />
By ‘finding’ the above spaces we are left needing<br />
460 spaces by <strong>2031</strong>.<br />
The current demand in the <strong>City</strong> <strong>Centre</strong> is<br />
approximately 2,461 parking spaces.<br />
The additional <strong>2031</strong> demand of 460 spaces could<br />
cost up to approximately $8M to construct as a<br />
carpark.<br />
If 10% of existing and new drivers shift to another<br />
mode of transport across the <strong>City</strong> <strong>Centre</strong>:<br />
= reduction of approximately 300 parking spaces<br />
= approximately $4.9 million carpark savings<br />
NOTE: The above parking assumptions have been part of preliminary<br />
investigations undertaken with GTA Consultants. Detailed findings are<br />
provided within the <strong>Masterplan</strong> Transport Report.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 14
Legibility<br />
BERYL STREET<br />
SHOWGROUND<br />
One of the key objectives of this <strong>Masterplan</strong> is to ensure that<br />
visitors to the <strong>City</strong> <strong>Centre</strong> are easily able to experience the <strong>City</strong>’s<br />
natural and urban assets and to encourage them to stay longer.<br />
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
STREET<br />
2.<br />
MOONEE STREET<br />
ELBOW STREET<br />
PACIFIC HIGHWAY<br />
3.<br />
1.<br />
VERNON STREET<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
As the <strong>City</strong> <strong>Centre</strong> transforms into a 21st Century <strong>City</strong>, the<br />
Strategies and Projects outlined within this report will provide<br />
a framework for the <strong>City</strong> to be known by visitors as a unique,<br />
memorable and accessible destination.<br />
The plan opposite illustrates the numerous Strategies and<br />
Projects that will reinforce the Vision for the <strong>City</strong> <strong>Centre</strong>. The<br />
Details below are discussed as components of the Strategies<br />
and Projects within the balance of this document.<br />
LEGIBILITY<br />
<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />
Existing Block<br />
Existing Building Footprint<br />
Development Outside Study Area<br />
Pacific Highway<br />
Street Reconfiguration<br />
MCLEAN STREET<br />
LITTLE STREET<br />
<strong>City</strong> <strong>Centre</strong> Main Street<br />
<strong>City</strong> <strong>Centre</strong> Supporting Street<br />
Roundabout Retrofit<br />
MARKET STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
ALBANY STREET<br />
PARK AVENUE<br />
EARL STREET<br />
HARBOUR DRIVE<br />
<strong>City</strong> <strong>Centre</strong> Gateway<br />
<strong>City</strong> Sails<br />
<strong>City</strong> Sail To Be Relocated<br />
Signage-<br />
<strong>City</strong> <strong>Centre</strong> Entry Post<br />
Key Streets Entry Post<br />
Relocatable Median Banner<br />
<strong>City</strong> <strong>Centre</strong> Information Post 1<br />
CURACAO STREET<br />
1.<br />
<strong>City</strong> <strong>Centre</strong> Information Post 2<br />
Direct Main Street Access<br />
Details<br />
<strong>City</strong> Square Public Domain Improvements<br />
2.<br />
Moonee Street Entry Statement<br />
Figure 5. Legibility Plan.<br />
0m 100 200<br />
N<br />
3.<br />
<strong>Harbour</strong> Drive Right Turn From South<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 15
KORFF STREET<br />
Strategy: <strong>City</strong> <strong>Centre</strong><br />
Legibility (S- CCL)<br />
GUNDAGAI PLACE<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
VERNON STREET<br />
PARK AVENUE<br />
ALBANY STREET<br />
COFF STREET<br />
HARBOUR DRIVE<br />
EARL STREET<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Vibrant, Connected and Green<br />
MOONEE STREET<br />
Figure 6. <strong>City</strong> <strong>Centre</strong> Core Plan.<br />
MARKET STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
CURACAO STREET<br />
<strong>City</strong> <strong>Centre</strong> Core<br />
<strong>City</strong> <strong>Centre</strong> Gateway<br />
0m 100 200 N<br />
Use of color & timber<br />
plantation inspiration.<br />
Prominent feature trees.<br />
Principle: A coordinated wayfinding strategy should celebrate<br />
the entry to the <strong>City</strong> <strong>Centre</strong>, improve access, signage and<br />
lighting whilst at the same time using streetscape planting<br />
and art to prioritise streets and direct visitors to destinations.<br />
A comprehensive wayfinding strategy contributes to a <strong>City</strong>’s<br />
identity and makes it more user- friendly; attracting and<br />
retaining more visitors.<br />
Finding: The <strong>City</strong> <strong>Centre</strong> lacks an easily identifiable and<br />
accessible entry and overall legibility. There is inadequate<br />
attraction and directional signage and general wayfinding within<br />
the <strong>City</strong> <strong>Centre</strong> itself.<br />
Benefits:<br />
• To enjoy a sense of arrival when entering the <strong>City</strong> <strong>Centre</strong>;<br />
• To recognise the <strong>City</strong> <strong>Centre</strong>’s Main Street, <strong>Harbour</strong><br />
Drive, and turn directly onto it from the South increasing<br />
capture of passing traffic;<br />
• To reinforce <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> as the ‘<strong>City</strong> of Sails;’<br />
• To reinforce the significance of <strong>Harbour</strong> Drive, Park<br />
Avenue, West High, Vernon, Gordon, Moonee, Coff and<br />
Little Streets as the core of the <strong>City</strong> <strong>Centre</strong>;<br />
MOONEE ST<br />
WEST HIGH ST<br />
PACIFIC HWY<br />
HARBOUR DR<br />
VERNON ST<br />
Iconic <strong>Harbour</strong> Drive sails not visible<br />
from the Pacific Hwy.<br />
Entry landscaping.<br />
• To enhance and differentiate the brand and identity of the<br />
<strong>City</strong> <strong>Centre</strong> from other places and cities;<br />
• To highlight the <strong>Harbour</strong> Drive and Earl Street intersection<br />
as the eastern gateway to the <strong>City</strong> <strong>Centre</strong>.<br />
Projects:<br />
Cost:<br />
PARK AVE<br />
Replicate the <strong>Harbour</strong> Dr sails at key locations<br />
within the <strong>City</strong> <strong>Centre</strong>.<br />
$1.3<br />
million<br />
LITTLE ST<br />
GORDON ST<br />
Implement Wayfinding Project including<br />
attraction and directional signage.<br />
$128,500<br />
Implement the <strong>Harbour</strong> Dr Access. $250,000<br />
Implement Street Reconfiguration ‘Greening’<br />
Projects.<br />
Refer to<br />
(P- SR) p.42<br />
Figure 7. Key <strong>City</strong> <strong>Centre</strong> wayfinding streets.<br />
<strong>City</strong> <strong>Centre</strong> Main Street<br />
<strong>City</strong> <strong>Centre</strong> Supporting Street<br />
Use of lighting to supplement entry statements.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 16
Strategy: Brand<br />
Positioning (S-BP)<br />
Principle: Building on the foundation of the <strong>Coffs</strong> <strong>Harbour</strong><br />
Township Marketing <strong>Masterplan</strong> and in particular, the village<br />
brand for the ‘<strong>City</strong> <strong>Centre</strong>; the <strong>City</strong> <strong>Centre</strong> brand should continue<br />
to evolve with the <strong>City</strong>. The brand and identity for <strong>Coffs</strong> <strong>Harbour</strong><br />
<strong>City</strong> <strong>Centre</strong> will be consistent with the Vision and will become a<br />
critical marketing tool to revitalise the <strong>City</strong> <strong>Centre</strong>.<br />
Finding: As <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> grows towards the <strong>City</strong><br />
of <strong>2031</strong> its brand will need to grow and evolve in order to clarify<br />
what makes it special and to help everyone understand this<br />
uniqueness in the same way.<br />
Benefits:<br />
• To capture the <strong>City</strong> <strong>Centre</strong> sense of place as it evolves;<br />
• To communicate and market a consistent brand for the<br />
<strong>City</strong> <strong>Centre</strong>;<br />
• To differentiate <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> from its<br />
competitors; and<br />
• To reinforce the Vision for the <strong>City</strong> <strong>Centre</strong> regularly<br />
through events, art and activities that are aligned with the<br />
brand and identity of the <strong>City</strong> <strong>Centre</strong>.<br />
Projects:<br />
Investigate the opportunity for a re branding<br />
to occur that launches the <strong>City</strong> <strong>Centre</strong><br />
<strong>Masterplan</strong> <strong>2031</strong>.<br />
Incorporate the new brand into the signage<br />
and events strategies and projects.<br />
Cost:<br />
TBD<br />
Refer to (P- WF)<br />
p.30 and<br />
(P- EP) p.57<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 17
Strategy: <strong>City</strong> <strong>Centre</strong><br />
Management (S-CCM)<br />
Principle: In order for modern <strong>City</strong> <strong>Centre</strong>s to compete as an<br />
“urban experience” against competitors the level of service, visual<br />
stimulation, general up- keep and pride of the public domain<br />
and shopfronts must be consistent and inspire return visits.<br />
Finding: The management of the <strong>City</strong> <strong>Centre</strong> is not coordinated<br />
to create a consistently high quality, memorable experience.<br />
Benefits:<br />
• To offer a clean, safe, accessible and modern <strong>City</strong> <strong>Centre</strong> to<br />
visitors;<br />
• To reposition the <strong>City</strong> <strong>Centre</strong> to be equipped to flourish in<br />
the changing retail environment;<br />
• To increase tourism visits and expenditure within the <strong>City</strong><br />
<strong>Centre</strong>;<br />
• To lift the quality of the <strong>City</strong> <strong>Centre</strong> public domain<br />
and shopping experience to become a worthwhile<br />
destination; and<br />
• To consolidate retail revitalisation efforts in order to get<br />
the most ‘bang for your buck.’<br />
Projects:<br />
Establish a single, integrated board for<br />
managing the <strong>City</strong> <strong>Centre</strong>’s ‘amenity package.’<br />
<strong>City</strong> <strong>Centre</strong> clean up and de- clutter day for<br />
the <strong>City</strong> <strong>Centre</strong>.<br />
Provide hospitality training.<br />
Proactively coordinate leasing and retail mix,<br />
events and advertising.<br />
Work with landlords to provide short term<br />
activation strategies such as displays in<br />
vacant shopfronts, art spaces and concepts<br />
similar to ‘Renew Australia.’<br />
Cost:<br />
N/A<br />
Refer to<br />
(P- EP) p.57<br />
TBD<br />
TBD<br />
TBD<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 18
Key Land Use and Open<br />
Space<br />
BERYL STREET<br />
KORFF STREET<br />
SHOWGROUND<br />
The <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> identifies key strategic sites<br />
within the <strong>City</strong> <strong>Centre</strong> and outlines Principles to ensure their<br />
optimum contribution to the future vibrancy of the <strong>City</strong> <strong>Centre</strong><br />
whilst also providing a toolkit for realising their potential<br />
through development incentives, activation mechanisms,<br />
management and resilience planning.<br />
GUNDAGAI PLACE<br />
P<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
P<br />
STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
P<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
COFF STREET<br />
2.<br />
5.<br />
3.<br />
P<br />
1. 2.<br />
P<br />
CASTLE STREET<br />
2.<br />
GORDON STREET<br />
DUKE STREET<br />
P<br />
The plan opposite identifies key sites for investigation and land<br />
use activation linkages. Any carpark redevelopment would be<br />
considered as part of an integrated development maintaining<br />
existing carparking capacity. The Details below are discussed<br />
as components of the Strategies and Projects within the<br />
balance of this document.<br />
LAND USEAND OPEN SPACE<br />
<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />
Existing Block<br />
Existing Building Footprint<br />
Development Outside Study Area<br />
MCLEAN STREET<br />
LITTLE STREET<br />
Pacific Highway<br />
Street Reconfiguration<br />
MARKET STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
P<br />
P<br />
ALBANY STREET<br />
PARK AVENUE<br />
EARL STREET<br />
4.<br />
HARBOUR DRIVE<br />
P<br />
1.<br />
Rear Lane Activation- Existing and Long Term<br />
Rear Lane Activation- New Connection Long Term<br />
Open Space Revitalisation<br />
Strategic Sites For Investigation<br />
Parking<br />
Details<br />
Future Cultural Building Redevelopment Site- Long Term<br />
CURACAO STREET<br />
2.<br />
3.<br />
4.<br />
5.<br />
Entertainment <strong>Centre</strong> Investigation Sites<br />
<strong>City</strong> Square Public Domain Revitalisation and Event Space<br />
Skate Park<br />
Rear Lane Activation- Trial Artist’s Lane<br />
Figure 8. Key Land Use and Open Space Plan.<br />
0m 100 200<br />
N<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 19
1. Scarba and Moonee St<br />
Carparks:<br />
• Joint venture<br />
• Integrated parking<br />
development<br />
2. Police Station redevelopment:<br />
• Government/ State Office<br />
• Gateway entry<br />
• Moonee St activation<br />
• Pedestrian link to carpark<br />
GUNDAGAI PLACE<br />
3. Park Ave Carpark:<br />
• <strong>City</strong> heart<br />
• <strong>City</strong> Square activation<br />
• Cultural Building<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Strategic Sites<br />
2.<br />
2.<br />
1.<br />
1.<br />
PACIFIC HIGHWAY<br />
4.<br />
3.<br />
VERNON STREET<br />
4.<br />
ALBANY STREET<br />
4. <strong>City</strong> Square Proximity:<br />
COFF STREET<br />
CASTLE CASTLE STREET STREET<br />
PARK AVENUE<br />
HARBOUR DRIVE<br />
EARL EARL STREET<br />
EET<br />
• <strong>City</strong> <strong>Centre</strong> core support site<br />
• Eastern site as carpark<br />
• Western site as boutique mixed use<br />
7.<br />
5.<br />
7.<br />
7.<br />
5.<br />
7.<br />
5.<br />
DUKE STREET<br />
CURACAO STREET<br />
7. Council Site Amalgamation/ Acquisition:<br />
• Significant single block landholding<br />
• Castle St carpark opportunities<br />
• Coff Street gateway site<br />
• Council administration consolidation<br />
6. Barracks:<br />
• Residential value<br />
6.<br />
• Park surveillance<br />
• Large floorplate<br />
5. Council Parkfront Properties:<br />
• Valued residential<br />
• Park surveillance<br />
• Additional LEP height<br />
• Ground floor activation<br />
0m 100 200 N<br />
Figure 9. Strategic Sites Plan.<br />
Strategy: Strategic Sites<br />
(S-SS)<br />
Principle: The identification of strategic sites for future<br />
redevelopment opportunities within a <strong>City</strong> <strong>Centre</strong> is critical to<br />
establishing a framework for investment, growth and evolution<br />
of a <strong>City</strong> <strong>Centre</strong> consistent with an established Vision.<br />
Finding: There are a number of sites within the <strong>City</strong> <strong>Centre</strong> that<br />
could contribute to the realisation of the <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong><br />
<strong>2031</strong> as part of future redevelopment.<br />
Benefits:<br />
• To re- brand the <strong>City</strong> <strong>Centre</strong> as a modern retail,<br />
commercial and cultural hub;<br />
• To offer inner- city residential apartment living as part<br />
of mixed use development that will contribute to safety<br />
through passive surveillance;<br />
• To leverage off of the public domain improvements within<br />
this <strong>Masterplan</strong> to promote redevelopment;<br />
• To establish a partnership between Council and private<br />
developers to deliver integrated parking solutions;<br />
• To identify joint venture opportunities for Council; and<br />
• To contribute revenue to Council for long term<br />
community projects.<br />
Gallery space<br />
dedicated to<br />
Council<br />
Bus stop/ cafe<br />
Separation of<br />
home office from<br />
apartment unit<br />
Ground floor retail with at- grade<br />
parking behind.<br />
Projects:<br />
Prepare a Redevelopment Strategy.<br />
Adopt and apply development incentives to<br />
ensure the <strong>City</strong> <strong>Centre</strong> Vision is realised.<br />
Cost:<br />
N/A<br />
N/A<br />
Explore opportunities for public/ private<br />
partnerships to realise best practice design<br />
outcomes.<br />
N/A<br />
Consider Moonee and Lyster St carparks<br />
as integrated carparking and joint venture<br />
opportunities.<br />
N/A<br />
Consider redevelopment of the Police<br />
Station site for Government/ State Office use.<br />
N/A<br />
Innovative development principles for consideration.<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 20
1.<br />
Park Avenue Lane- Existing.<br />
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
1.<br />
VERNON STREET<br />
PARK AVENUE<br />
ALBANY STREET<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
HARBOUR DRIVE<br />
EARL STREET<br />
DUKE STREET<br />
Strategy: Rear Lane<br />
Activation (S-RLA)<br />
Principle: Successful cities have demonstrated that a Rear Lane<br />
Activation Strategy can contribute to the economy of a <strong>City</strong> <strong>Centre</strong><br />
by supporting conventional retail and diversifying investment<br />
opportunities.<br />
Finding: The network of public rear lanes has the potential to play<br />
a dynamic and active role in the future of the <strong>City</strong> <strong>Centre</strong> linked to<br />
redevelopment over the long term.<br />
CURACAO STREET<br />
Benefits:<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- A Better <strong>City</strong> for Walking<br />
0m 100 200<br />
Figure 10. Stage 1- Trial Activation- Park Avenue Lane.<br />
N<br />
• To broaden the economic base of a <strong>City</strong>;<br />
• To support traditional retail;<br />
Activated laneways supplement streets and public<br />
spaces to form a network of various experiences and<br />
possibilities.<br />
Park Avenue Lane has small spaces attached<br />
to the laneway that are perfect for quirky<br />
community gathering and event opportunities.<br />
Public art in the <strong>City</strong> <strong>Centre</strong> can function as<br />
protection from sun and frequent rain whilst<br />
activating spaces and promoting local and<br />
youth artwork.<br />
• To attract investment and new residents who are interested<br />
in inner city lifestyle;<br />
• To clean up and improve safety within under utilised public<br />
rear lanes in the <strong>City</strong> <strong>Centre</strong>;<br />
• To reinforce the <strong>City</strong> Square as the focal point of the <strong>City</strong><br />
<strong>Centre</strong> for events;<br />
• To showcase local artists and promote laneway art events;<br />
• To activate a secondary pedestrian movement network; and<br />
• To create a series of engaging and vibrant smaller spaces.<br />
Opportunity for range of evening activation.<br />
GUNDAGAI PLACE<br />
KORFF STREET<br />
SCARBA STREET<br />
WEST HIGH<br />
MURDOCH STREET<br />
LYSTER STREET<br />
MCLEAN STREET<br />
ELIZABETH STREET<br />
GRAFTON STREET<br />
STREET<br />
MARKET STREET<br />
MOONEE STREET<br />
ELBOW STREET<br />
LITTLE STREET<br />
PACIFIC HIGHWAY<br />
VERNON STREET<br />
HARBOUR DRIVE<br />
PARK AVENUE<br />
ALBANY STREET<br />
<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- A Better <strong>City</strong> for Walking<br />
COFF STREET<br />
CASTLE STREET<br />
GORDON STREET<br />
DUKE STREET<br />
EARL STREET<br />
CURACAO STREET<br />
0m 100 200<br />
Figure 11. Stage 2- Long Term Rear Lane Activation.<br />
N<br />
Projects:<br />
Trial Park Ave Ln as the pilot project for an<br />
‘Artists Laneway Event’ with the <strong>City</strong> Square.<br />
Provide clean- up, lighting and security<br />
measures to promote safe use of Park Ave Ln<br />
and the <strong>City</strong> Square.<br />
Prepare a Rear Lane Activation Strategy for<br />
the balance of the rear lanes.<br />
Provide lighting and security measures in<br />
accordance with the Rear Lane Activation<br />
Strategy and in partnership with private<br />
development as it occurs.<br />
Cost:<br />
$100,000<br />
Refer to (P-<br />
CQ) p. 33<br />
N/A<br />
TBD<br />
Greenery and art add instant life to a space.<br />
Retain the existing network of rear lanes and<br />
encourage additional connections as part of<br />
new and private development in accordance<br />
with Figure 11.<br />
N/A<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 21
Strategy: Development<br />
Incentive Policy (S- DIP)<br />
Principle: To create an incentive for the private sector to<br />
develop within the <strong>City</strong> <strong>Centre</strong> and contribute to the realisation<br />
of the <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong>.<br />
Finding: In the current financial climate, any steps Council<br />
can implement to de-risk development will be attractive to<br />
developers and lenders.<br />
There are a variety of strategies including Developer Incentives,<br />
Development Application Process and Public Improvements<br />
that can provide the incentive. They include:<br />
Developer Incentives:<br />
Development Application Process:<br />
In the current financial climate, de-risking the approval process<br />
for the private sector may provide an incentive for developers<br />
to invest in the <strong>City</strong> <strong>Centre</strong>. Initiatives Council may implement<br />
to assist with this include:<br />
• Reducing or staging DA fees;<br />
• Streamlining the DA process to provide certainty on<br />
timeframes; and<br />
• Provide DA lodgment assistance.<br />
• Council recognises that public life and creative events<br />
contribute to economic resilience and strengthen<br />
local spending. Events also create opportunities for<br />
community and business participation on a broad<br />
scale. It is also recognised that major events can deliver<br />
significant tourism benefits. A diverse events calendar<br />
adds a further layer of experience for visitors to <strong>Coffs</strong><br />
<strong>Harbour</strong> and can provide the impetus for an initial<br />
visit, a return visit, or a longer stay. As such, Council<br />
has a Creative Event Sponsorship Program aimed to<br />
complement local initiatives rather than providing all<br />
the funding.<br />
• Whilst some incentives exist, such as an increase in<br />
building height and FSR the opportunity exists to<br />
improve the effectiveness of these actions by clearly<br />
articulating the additional building capacity that will be<br />
approved if specific public benefits are provided in the<br />
<strong>City</strong> <strong>Centre</strong>. Benefits typically include:<br />
--<br />
Provision of on-site affordable housing;<br />
--<br />
On-site civic support spaces dedicated to culture, the<br />
arts, bicycle infrastructure;<br />
--<br />
Green buildings that exceed the standard rating<br />
under the Commercial BASIX Code;<br />
--<br />
Create new public space identified by the<br />
<strong>Masterplan</strong>, including plazas, pedestrian passages<br />
and new connections;<br />
--<br />
Building height bonuses that are proportionate to<br />
the permitted height; and<br />
--<br />
The viability of fine grain redevelopment of the <strong>City</strong><br />
<strong>Centre</strong> is difficult because of the necessity to provide<br />
on-site parking. Council could remove the necessity<br />
for sites of a certain size to provide any on-site<br />
parking. Instead, a discounted cash contribution to a<br />
Public Parking Fund shall be provided.<br />
Public Improvements:<br />
There are a variety of strategies that can provide incentives<br />
for existing owners or tenants to deliver the <strong>City</strong> <strong>Centre</strong><br />
<strong>Masterplan</strong>. They include:<br />
• Council recognises that shopfronts without awnings<br />
reduce the pedestrian experience, protection from the<br />
elements and alfresco dining. Through the Awning<br />
Addition Grant Program Council seeks to encourage<br />
owners or tenants to add an awning to a shopfront<br />
which, without financial assistance, may not be able to<br />
occur. The applicant must make a matched contribution<br />
of cash only, not ‘value-in-kind’, to the project. Matched<br />
grants would be considered for this program.<br />
• Council recognises that blank walls detract from<br />
pedestrian life and a sense a safety. Through the Blank<br />
Wall to Active Frontage Grant Strategy Council seeks<br />
to encourage owners or tenants to activate blank walls<br />
through public art, including opening new shopfronts<br />
onto streets, murals, lighting and other measures which,<br />
without financial assistance, may not be able to occur.<br />
The applicant must make a matched contribution of<br />
cash only, not ‘value-in-kind’, to the project. Matched<br />
grants would be considered for this program.<br />
Projects:<br />
Develop and adopt a Developer Incentives<br />
Program.<br />
Develop and adopt a Parking Discount<br />
Program and Public Parking Fund.<br />
Develop and adopt an Awning Addition<br />
Grant Program (refer to Appendix 1:<br />
Landscape Materials and <strong>Masterplan</strong>ning for<br />
detailed specifications).<br />
Develop and adopt a Blank Wall to Active<br />
Frontage Grant Strategy.<br />
Develop and adopt a Creative Event<br />
Sponsorship Program linked to the <strong>City</strong><br />
<strong>Centre</strong> Events Program<br />
Cost:<br />
$100,000<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 22
No space for tree<br />
planting.<br />
Strategy: Resilience and<br />
Flood Plan (S-RFP)<br />
+0.5M Freeboard<br />
1:100 ARI<br />
Elevated shops do not<br />
welcome passersby.<br />
Kerb as a<br />
barrier for<br />
drivers to<br />
access the<br />
footpath.<br />
Level change infrastructure consumes the public domain.<br />
Principle: Flood planning and development solutions must be<br />
balanced with a retail and public domain interface that facilitates<br />
the highest levels of retail performance within a mixed use<br />
environment and the best <strong>City</strong> <strong>Centre</strong> function on a daily basis.<br />
Finding: The majority of the <strong>City</strong> <strong>Centre</strong> is subject to 100-<br />
year ARI flood event and therefore requires development in<br />
accordance with the flood planning level defined as the level of a<br />
1:100 ARI flood event plus 0.5 metre freeboard.<br />
Benefits:<br />
• To put in place resilience- planning for the <strong>City</strong> <strong>Centre</strong>;<br />
Ad- hoc, cluttered public<br />
domain- stairs, ramps, railing.<br />
Insufficient space for<br />
tree planting.<br />
• To promote high patronage of shops within the <strong>City</strong><br />
<strong>Centre</strong> by retaining a direct relationship between the<br />
footpath and adjoining retail shops;<br />
Figure 12. Section 1: Typical flood design resolution under current policy.<br />
• To promote a quality and consistent public domain,<br />
particularly where multiple land ownership and<br />
development may lead to ad- hoc solutions;<br />
• To maximise public and private interaction on streets and<br />
public spaces; and<br />
Merchandise safe zone<br />
during infrequent flood<br />
events.<br />
Flood planning level<br />
resolved internally.<br />
Manageable level<br />
change for drivers to<br />
access shops directly.<br />
<strong>Coffs</strong> <strong>Harbour</strong> Flooding Extents Map, 2006.<br />
• To minimise financial impacts on retailers resulting from<br />
water exposure.<br />
Projects:<br />
Adopt a resiliency strategy to ensure that<br />
planning for periodic flooding does not<br />
adversely impact on the <strong>City</strong> <strong>Centre</strong> on a daily<br />
basis.<br />
Cost:<br />
N/A<br />
Extension of shopfront<br />
into the public realm.<br />
Lead a public/ private partnership to provide<br />
advice to shop owners regarding flood<br />
planning options and consider a grant<br />
scheme for key flood path properties.<br />
N/A<br />
+0.5M Freeboard<br />
1:100 ARI<br />
Assist property owners in retro- fitting of<br />
flood mitigation devices such as flood gates<br />
to existing developments.<br />
TBD<br />
Flood capable zone.<br />
Figure 13. Section 2: Alternative food design resolution- internal.<br />
Usable footpath width retained for<br />
people and trees as buffer to street.<br />
Flood planning level achieved within the shop.<br />
<strong>City</strong> <strong>Centre</strong> drainage by-pass (concept and<br />
cost/ benefit analysis).<br />
Resolve <strong>Harbour</strong> Dr /Gordon St overland<br />
flow path as part of <strong>Coffs</strong> Central.<br />
$1.9<br />
million<br />
$700,000<br />
<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 23