10.01.2015 Views

Coffs Harbour City Centre Masterplan 2031

Coffs Harbour City Centre Masterplan 2031

Coffs Harbour City Centre Masterplan 2031

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COFFS HARBOUR CITY CENTRE<br />

MASTERPLAN <strong>2031</strong>


The <strong>City</strong> <strong>Centre</strong> will be a destination<br />

featuring world class design of<br />

the physical fabric that creates a<br />

unique and creative streetscape<br />

that inspires all who visit.<br />

A VISION To Inspire<br />

To create a place where economic, social and cultural pursuits fuse to<br />

enrich and enliven all who live, work and visit the <strong>City</strong> <strong>Centre</strong>.<br />

At our core will be a strong heart from which the ripples of vibrancy<br />

and prosperity will flow throughout the <strong>City</strong> <strong>Centre</strong> and to the region as<br />

a whole.<br />

We will build on our parents’ achievements for our next generation<br />

so that they may live better than us.<br />

Let’s reignite a glow in the <strong>City</strong> <strong>Centre</strong> that we locals are proud of<br />

and for which visitors become attached to.<br />

We will lay the foundation to encourage long term development<br />

and investment in the <strong>City</strong> <strong>Centre</strong> through careful planning and real<br />

incentives that ensure retail, business, leisure, cultural and residential<br />

interests flourish.<br />

The <strong>City</strong> <strong>Centre</strong> will be a destination featuring world class design of<br />

the physical fabric that creates a unique and creative streetscape that<br />

inspires all who visit.<br />

The <strong>City</strong> <strong>Centre</strong> is to be reinstated as the key retail precinct<br />

in <strong>Coffs</strong> <strong>Harbour</strong> as it historically has been - providing additional<br />

secondary benefits compared to other standalone retail centres.<br />

For the <strong>City</strong> <strong>Centre</strong> to be the core entertainment precinct of <strong>Coffs</strong><br />

<strong>Harbour</strong> which regionally attracts festivities and events for the social<br />

and economic benefit of the community and as a new attraction for<br />

tourists.<br />

Complementing the entertainment precinct will be numerous cultural<br />

initiatives that showcase and encourage the talent of our many<br />

artists, musicians, chefs and local providores.<br />

We will create an attractive urban environment rich in lifestyle facilities<br />

that attracts residential living to the <strong>City</strong> <strong>Centre</strong> consistent with<br />

today’s residential needs and expectations.<br />

Let’s live and work in a place where environmentally sustainable<br />

practices, healthy living and a greening of the <strong>City</strong> <strong>Centre</strong> become<br />

the new benchmarks in our daily lives.


<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong>- Contents<br />

2. CITY CENTRE MASTERPLAN <strong>2031</strong><br />

4<br />

12. IMPLEMENTATION<br />

55<br />

3. PRINCIPLES<br />

4. OBJECTIVES<br />

9. STRATEGIES AND PROJECTS<br />

5<br />

6<br />

7<br />

13. IMPLEMENTATION-<br />

STRATEGIES AND PROJECTS MATRICES<br />

13. IMPLEMENTATION-<br />

SPECIAL RATE VARIATION FUNDING MATRIX<br />

56<br />

57<br />

10. STRATEGIES<br />

8<br />

14. CROWDFUNDING<br />

58<br />

ACCESS AND MOVEMENT<br />

KEY CONNECTIONS (S- KC)<br />

BIKE PLAN (S- BP)<br />

PARKING (S- P)<br />

9<br />

10<br />

12<br />

14<br />

13. IMPLEMENTATION-<br />

ALTERNATIVE FUNDING MATRIX<br />

5. PREMISE OF THE VISION<br />

59<br />

60<br />

LEGIBILITY<br />

CITY CENTRE LEGIBILITY (S- CCL)<br />

BRAND POSITIONING (S- BP)<br />

CITY CENTRE MANAGEMENT (S- CCM)<br />

KEY LAND USE AND OPEN SPACE<br />

STRATEGIC SITES (S- SS)<br />

REAR LANE ACTIVATION (S- RLA)<br />

DEVELOPMENT INCENTIVE POLICY (S- DIP)<br />

RESILIENCE AND FLOOD PLAN (S- RFP)<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

6. BASELINE DATA ASSESSMENT-<br />

A CITY WITH A FANTASTIC FOUNDATION<br />

7. BASELINE DATA ASSESSMENT-<br />

CITY CENTRE CHALLENGES<br />

8. COMMUNITY ENGAGEMENT<br />

APPENDIX 1- LANDSCAPE AND MATERIALS PALETTE<br />

APPENDIX 2- SUPPORTING TRANSPORT REPORT<br />

61<br />

62<br />

63<br />

11. PROJECTS<br />

24<br />

HARBOUR DRIVE ACCESS (P- HDA)<br />

WAYFINDING (P- WF)<br />

CITY SAILS (P- CS)<br />

CITY SQUARE (P- CQ)<br />

CITY SQUARE CULTURAL BUILDING (P- CQCB)<br />

ENTERTAINMENT CENTRE (P- EC)<br />

ROUNDABOUT RETROFIT (P- RR)<br />

BUS HUB LOCATION (P- BHL)<br />

CASTLE STREET CARPARK (P- CSC)<br />

STREET RECONFIGURATION (P- SR)<br />

BRELSFORD PARK (P- BP)<br />

EVENTS PROGRAM (P- EP)<br />

25<br />

26<br />

27<br />

29<br />

30<br />

34<br />

35<br />

36<br />

37<br />

38<br />

53<br />

54<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

3


<strong>City</strong> <strong>Centre</strong><br />

<strong>Masterplan</strong> <strong>2031</strong><br />

The <strong>Masterplan</strong> builds on the work of four related<br />

documents: Our Living <strong>City</strong> Settlement Strategy, <strong>City</strong><br />

<strong>Centre</strong> Vision, Working Group Vision and draft LEP / DCP<br />

2012. While the previous documents focus on a range of<br />

issues, this report focuses solely on the <strong>City</strong> <strong>Centre</strong> study<br />

area, as identified on page 61, and the priority Strategies<br />

and Projects to improve it. These works will largely be<br />

funded by a proposed Special Rate for the <strong>City</strong> <strong>Centre</strong>, as<br />

well as other funding mechanisms.<br />

In preparing this report, Council contracted in 2012 a multidisciplinary<br />

team comprising ROBERTSDAY + AHH + GTA<br />

+ I&BM + NORTHROP + STRAIGHT TALK to work with the<br />

community and stakeholders. The expertise of each firm<br />

and its role in the project is outlined on the back cover.<br />

The balance of this report supports the Vision and provides<br />

an overview of the <strong>City</strong> <strong>Centre</strong> Principles and Objectives<br />

before focusing on the specific Strategies and Projects to<br />

realise the Vision and to create a prosperous <strong>City</strong> <strong>Centre</strong> by<br />

<strong>2031</strong>.<br />

The Vision is underpinned by five key premises outlined in<br />

Premise of the Vision (p. 59) and originates from the Baseline<br />

Data Assessment, summarised within A <strong>City</strong> With A Fantastic<br />

Foundation (p. 60) and <strong>City</strong> <strong>Centre</strong> Challenges (p. 61), and<br />

feedback gained from a rigorous consultation process<br />

outlined in Community Engagement (p. 62).<br />

Proposed evolution of the <strong>City</strong> Square into a dynamic cultural building and <strong>City</strong> focal point for <strong>2031</strong>.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

4


PRINCIPLES To Guide<br />

The 21st Century <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> will play to<br />

its strengths, be better than its competitors and never<br />

try to be something that it is not.<br />

The Principles outlined below will guide the future development of the <strong>City</strong><br />

<strong>Centre</strong>. The driving Principles detailed under the specific Strategies and<br />

Projects within this <strong>Masterplan</strong> support and reinforce the primary guiding<br />

Principles below.<br />

The <strong>City</strong> <strong>Centre</strong> stands united as one retail, business, cultural and<br />

entertainment precinct with preferred development to occur as close to the<br />

<strong>City</strong> Square as possible.<br />

Having a strong core in the <strong>City</strong> <strong>Centre</strong> is a prerequisite to that strength<br />

flowing to its outer boundaries.<br />

The primary qualities of safety, cleanliness and convenience must be achieved<br />

before placemaking endeavours can be fully realised.<br />

Development will be encouraged which is best practice and of a high quality<br />

modern standard that will lay the foundation for decades to come.<br />

For all stakeholders to work cohesively and passionately together to deliver<br />

greater results.<br />

Ensure the economic benefits of the Special Rate levy, are, in the long term,<br />

passed onto landowners through higher property values, to businesses<br />

through higher incomes and the community through better facilities and<br />

employment.<br />

To increase the capacity of the <strong>City</strong> <strong>Centre</strong> to foster economic growth and to<br />

meet the demographic needs of <strong>Coffs</strong> <strong>Harbour</strong> which is characterised by a<br />

high population growth rate and an aging population.<br />

To provide short term stimulus measures to revitalise the <strong>City</strong> <strong>Centre</strong>, reduce<br />

the number of vacant shopfronts and increase retail sales.<br />

To work with private landowners and prospective investors to create economic<br />

opportunities through compelling development incentives.<br />

Through upfront investment in the public domain the <strong>City</strong> <strong>Centre</strong> may experience a development renaissance which will position it as a vibrant 21st Century <strong>City</strong>.<br />

The <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> will be a living document that<br />

delivers short-term activation strategies and lays the groundwork for longer<br />

term dreams.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

5


OBJECTIVES To Deliver<br />

MOONEE ST<br />

CITY SQUARE<br />

GORDON ST<br />

At night, <strong>Coffs</strong> <strong>City</strong> <strong>Centre</strong> will come vibrantly to life with decorative lighting and light<br />

shows playing within the iconic shade sails whilst enhancing the safety and security<br />

of those out enjoying the cafés and al fresco dining that spills into the public domain.<br />

MOONEE ST<br />

CITY SQUARE<br />

PARK AVENUE<br />

PARK AVENUE<br />

HARBOUR DRIVE<br />

GORDON ST<br />

HARBOUR DRIVE<br />

EARL ST<br />

Key <strong>City</strong> <strong>Centre</strong> Street Projects will improve connectivity, legibility and contribute to the <strong>City</strong> <strong>Centre</strong> brand.<br />

EARL ST<br />

‘Street Greening’ will enhance the streetscape experience, attracting visitors and encouraging walking and cycling.<br />

The implementation of the Strategies and Projects<br />

contained within this <strong>Masterplan</strong> are proposed to meet the<br />

<strong>City</strong> <strong>Centre</strong> Objectives below.<br />

<strong>Coffs</strong> <strong>Harbour</strong>’s CBD will be transformed and re-branded as<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>.<br />

Current <strong>City</strong> <strong>Centre</strong> streetscapes will be enhanced as linear<br />

parks with trees, shrubs, street furniture and additional<br />

shade sails strategically located to identify the <strong>City</strong> <strong>Centre</strong>,<br />

welcome visitors and provide clear pedestrian links and<br />

weather protection along key connections.<br />

Through traffic will be directed around the <strong>City</strong> <strong>Centre</strong> by a<br />

series of clearly marked ring roads while movement within<br />

the area will be slowed, creating a safe, friendly zone for<br />

pedestrians, bikes, and mobility scooters.<br />

At night, the <strong>City</strong> <strong>Centre</strong> will come vibrantly to life with<br />

decorative lighting and light shows playing within the<br />

iconic shade sails whilst enhancing the safety and security<br />

of those out enjoying the cafés and al fresco dining that<br />

spills into the public domain.<br />

The <strong>City</strong> Square will become the beating heart of the <strong>City</strong><br />

<strong>Centre</strong>, with an outdoor performance space featuring<br />

social and cultural events and attractions intermixed with<br />

bustling night as well as day markets, full of fresh local<br />

produce and wares from local creative industries.<br />

Wide footpaths, strategically placed cycleways and<br />

attractive, landscaped thoroughfares will make the <strong>City</strong><br />

<strong>Centre</strong> safer and more accessible for visitors and locals<br />

alike. The visual appeal and easy access will encourage<br />

walking and cycling, promoting a healthier lifestyle and<br />

less reliance on motor vehicles.<br />

This community revival is the commendable result of<br />

economic interests leading by example. The <strong>Masterplan</strong><br />

demonstrates their commitment to the growth and<br />

evolution of the <strong>City</strong> <strong>Centre</strong> and to the establishment of<br />

<strong>Coffs</strong> <strong>Harbour</strong> as the regional capital and a world class<br />

tourism destination.<br />

A collection of lifestyle assets including pools, gyms, parks,<br />

walkways, cycleways, playgrounds, library, art gallery and<br />

day spas will continue to be developed, enticing inner city<br />

residential living as well as increased daily visitation.<br />

The communal, social and cultural wealth of <strong>Coffs</strong> <strong>Harbour</strong><br />

will be enhanced through realising the full potential of<br />

government assets including land, buildings and services.<br />

Several strategic sites will be targeted to deliver a new<br />

cultural, entertainment and civic building which may be<br />

located separately or multi- functionally according to<br />

funding and commercial opportunities. Preference will be<br />

given to locating these community assets as close to the<br />

<strong>City</strong> Square as possible subject to delivering the highest<br />

level of community benefit.<br />

Whilst encouraging more sustainable transport, we are<br />

conscious of the need to protect and enhance business<br />

viability. Great care is to be applied to the integration of<br />

<strong>City</strong> <strong>Centre</strong> user traffic, public transport, carparking, cycling<br />

and pedestrian movement to ensure the maximisation<br />

of all these resources and their continuing improvement.<br />

Greater utilisation of existing parking facilities will be<br />

achieved by the improvement of access and security and<br />

the relocation of long-term parking to the outer perimeter.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

6


Street Reconfiguration Project for Park Avenue demonstrating ‘street efficiency’ benefits including street greening and widened pedestrian footpaths.<br />

Strategies and Projects<br />

The <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> is not just<br />

another planning document. It represents a new approach to<br />

<strong>City</strong> design by 1) viewing collaboration of public and private<br />

actions as an evolving process 2) recognising the value of quick,<br />

affordable tools in creating instant impact and promoting long<br />

term change and 3) aligning strategy with projects to build<br />

towards a pragmatic utopia.<br />

This approach towards a pragmatic utopia is supported by the<br />

goal being a vibrant, connected and green <strong>City</strong> <strong>Centre</strong>. Rather<br />

than being viewed in isolation, there exists a fertile overlap<br />

between each goal where the maximum benefit for the <strong>City</strong><br />

<strong>Centre</strong> can be achieved.<br />

It is on this basis, the city-wide Strategies and place-specific<br />

Projects have been conceived. They are the heart of the<br />

<strong>Masterplan</strong>. The Strategies provide the overall framework<br />

for improving the urban vitality of the <strong>City</strong>. The Projects<br />

often get the most attention as they are implemented, such<br />

as an improved <strong>City</strong> Square, a new Cultural Building and<br />

the like. What is important to remember though, is that it<br />

is a commitment to the long term Strategy that ultimately<br />

reconciles and diffuses any short term frustration caused by<br />

a specific Project as the <strong>City</strong> transitions to a more resilient,<br />

sustainable and prosperous future.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

7


Strategies<br />

KEY CONNECTIONS (S- KC)<br />

BIKE PLAN (S- BP)<br />

PARKING (S- P)<br />

CITY CENTRE LEGIBILITY (S- CCL)<br />

BRAND POSITIONING (S- BP)<br />

CITY CENTRE MANAGEMENT (S- CCM)<br />

STRATEGIC SITES (S- SS)<br />

REAR LANE ACTIVATION (S- RLA)<br />

DEVELOPMENT INCENTIVE POLICY (S- DIP)<br />

RESILIENCE AND FLOOD PLAN (S- RFP)<br />

10<br />

12<br />

14<br />

16<br />

17<br />

18<br />

20<br />

21<br />

22<br />

23<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council •<br />

8


Access and Movement<br />

BERYL STREET<br />

SHOWGROUND<br />

One of the key objectives of this <strong>Masterplan</strong> is to achieve a<br />

connected <strong>City</strong> <strong>Centre</strong>. The Strategies and Projects outlined<br />

within the <strong>Masterplan</strong> will result in an environment where there<br />

is a balance between the pedestrian, cyclist, public transport<br />

and private vehicle. Equitable access will be key to the evolution<br />

of the <strong>City</strong> <strong>Centre</strong> towards <strong>2031</strong>.<br />

AZALEA AVENUE<br />

GUNDAGAI PLACE<br />

MCLEAN STREET<br />

WEST HIGHT STREET<br />

MURDOCH STREET<br />

P<br />

KORFF STREET<br />

SCARBA STREET<br />

LYSTER STREET<br />

P<br />

MOONEE STREET<br />

ELBOW STREET<br />

P<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

P<br />

COFF STREET<br />

4.<br />

P<br />

CASTLE STREET<br />

GORDON STREET<br />

3.<br />

1.<br />

DUKE STREET<br />

2.<br />

The plan opposite illustrates the multi- modal intent of the<br />

<strong>Masterplan</strong> and compatibility of the transport systems. The<br />

Details below are discussed as components of the Strategies<br />

and Projects within the balance of this document.<br />

ACCESS AND MOVEMENT<br />

<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />

Existing Block<br />

Existing Building Footprint<br />

Development Outside Study Area<br />

Pacific Highway<br />

Pedestrian Connection<br />

AZALEA AVENUE<br />

MEADOW STREET<br />

COMBINE STREET<br />

HILL STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

MARKET STREET<br />

P<br />

P<br />

ALBANY STREET<br />

PARK AVENUE<br />

EARL STREET<br />

HARBOUR DRIVE<br />

P<br />

Street Reconfiguration<br />

Roundabout Retrofit<br />

Cycleway- Separated<br />

Cycleway - Park Trail<br />

Bus Hub<br />

Access Improvement<br />

Inner Ring Road<br />

Carpark Investigation Site<br />

Details<br />

CURACAO STREET<br />

1.<br />

2.<br />

3.<br />

4.<br />

Gordon Street- Trial ‘Display Street Reconfiguration’<br />

<strong>Coffs</strong> Bridge Upgrade<br />

Duke Street Extension<br />

Castle Street Carpark- New Rooftop Sail and Lift<br />

Figure 1. Access and Movement Plan.<br />

0m 100 200<br />

N<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Access and Movement<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 9


AZALEA AVENUE<br />

AZALEA AVENUE<br />

MEADOW STREET<br />

COMBINE STREET<br />

MCLEAN STREET<br />

GUNDAGAI PLACE<br />

MURDOCH STREET<br />

WEST HIGHT STREET<br />

HILL STREET<br />

KORFF STREET<br />

SCARBA STREET<br />

LYSTER STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

8. 4.<br />

1.<br />

10.<br />

8.<br />

ELBOW STREET<br />

LITTLE STREET<br />

2.<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

PARK AVENUE<br />

ALBANY STREET<br />

BERYL STREET<br />

COFF STREET<br />

CASTLE STREET<br />

GORDON STREET<br />

DUKE STREET<br />

3.<br />

5.<br />

10.<br />

EARL STREET<br />

CURACAO STREET<br />

HARBOUR DRIVE<br />

SHOWGROUND<br />

6.<br />

8.<br />

9.<br />

+<br />

7.<br />

0m 100 200 N<br />

1. Police Station redevelopment is to retain the public 2. Future redevelopment is 3. <strong>Coffs</strong> Central 4. Pedestrian 5. Pedestrian crossing to be<br />

connection between Lyster St. Carpark and Pacific Hwy.<br />

and<br />

Improve Pacific Hwy pedestrian crossing.<br />

to retain public connection<br />

between Moonee St. Carpark<br />

and Vernon St.<br />

to provide for<br />

extended mall<br />

access.<br />

crossing from<br />

Moonee St. to<br />

<strong>Harbour</strong> Dr.<br />

included at Beryl St. (Justice<br />

Precinct) signals. Note: Funded<br />

by State Government.<br />

6. Improve <strong>Coffs</strong> Creek Bridge to<br />

increase cycle and pedestrian use.<br />

7. Formalise the proposed<br />

Duke St. connection.<br />

8. Complete and connect rear laneways for rear vehicle access encouraging<br />

new development to address open space and key streets.<br />

9. Extend the right turn lane at the intersection of Pacific Hwy<br />

and Albany St.<br />

10. Establish a <strong>City</strong> <strong>Centre</strong> ring road with the Pacific Hwy and Coff St. and<br />

11. Facilitate outer ring road<br />

Albany St. as key connection points.<br />

(diagram overleaf).<br />

Strategy: Key Connections<br />

(S- KC)<br />

Principle: A <strong>City</strong> <strong>Centre</strong> movement network should allow safe and<br />

equitable access for cars, pedestrians and cyclists. By providing a<br />

number of routes and a hierarchy of thoroughfares traffic can selfregulate<br />

and the function of the <strong>City</strong> <strong>Centre</strong> will improve.<br />

Finding: The city benefits from a robust street network however,<br />

there are a number of missing links. Completing these missing links<br />

will improve the legibility and permeability of the <strong>City</strong> over time.<br />

Benefits:<br />

• To alleviate current capacity issues encouraging drivers to<br />

visit the <strong>City</strong> <strong>Centre</strong>;<br />

• To bypass <strong>Harbour</strong> Drive and the <strong>City</strong> <strong>Centre</strong>;<br />

• To accept driving slower in order to be a part of the retail,<br />

civic and cultural experience of <strong>Harbour</strong> Drive;<br />

• To improve pedestrian connections across the Pacific<br />

Highway;<br />

• To improve legibility, access and safety by encouraging<br />

mid- block pedestrian connections as part of private<br />

development; and<br />

• To provide a recreational loop for pedestrians and cyclists<br />

connecting the <strong>City</strong> <strong>Centre</strong> to parks and natural assets.<br />

Projects:<br />

Facilitate the function of an outer ring road.<br />

Establish a <strong>City</strong> <strong>Centre</strong> inner ring road.<br />

Provide and formalise the Duke St extension as<br />

a permanent component of the inner ring road.<br />

Incorporate pedestrian crossings with <strong>City</strong> Sail<br />

Projects including Pacific Hwy/ <strong>Harbour</strong> Dr<br />

intersection.<br />

N/A<br />

N/A<br />

$300,000<br />

TBD<br />

Upgrade the <strong>Coffs</strong> Creek Bridge. $36,900<br />

Extend the right turn lane onto Albany St to<br />

alleviate current capacity issues and ensure<br />

satisfactory operation into the future.<br />

Incentivise private developers to realise the<br />

mid- block pedestrian connections and rear<br />

laneways.<br />

<strong>Coffs</strong> Central to provide extended mall access.<br />

Cost:<br />

$200,000<br />

N/A<br />

N/A<br />

Figure 2. Key Connections Plan.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 10


ORLANDO STREET<br />

PACIFIC HIGHWAY<br />

WEST HIGH STREET<br />

HARBOUR DRIVE<br />

HOGBIN DRIVE<br />

LEGEND<br />

CITY CENTRE<br />

CITY CENTRE OUTER RING ROAD<br />

STADIUM DRIVE<br />

PACIFIC HIGHWAY<br />

CITY CENTRE MAIN STREET<br />

11. Strategy: Key Connections (S- KC) - THE OUTER RING ROAD<br />

0m 200 400 N<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 11


Strategy: Bike Plan (S-BP)<br />

GUNDAGAI PLACE<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

HARBOUR DRIVE<br />

PARK AVENUE<br />

ALBANY STREET<br />

COFF STREET<br />

CASTLE STREET<br />

GORDON STREET<br />

DUKE STREET<br />

EARL STREET<br />

CURACAO STREET<br />

N<br />

Principle: The greatest revolution of sustainable transport<br />

underway in progressive cities is welcoming bikes into the <strong>City</strong><br />

<strong>Centre</strong> as a viable alternative transport choice. By shifting even<br />

a portion of people going to work onto a bike cities significantly<br />

benefit socially, economically and environmentally.<br />

Finding: The opportunity exists to extend the existing cycle<br />

network into the <strong>City</strong> <strong>Centre</strong> and provide the framework for a<br />

balanced, sustainable transport network to evolve over time.<br />

Benefits:<br />

• To appeal to an emerging demographic;<br />

<strong>Coffs</strong> <strong>Harbour</strong> Existing Cycle Route Map (excerpt and design overlay)..<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />

y<br />

0m 100 200<br />

GUNDAGAI PLACE<br />

Connects to<br />

Pacific Hwy<br />

cycleway<br />

Figure 3. Bike Plan.<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

ALBANY STREET<br />

3 min to<br />

Thompson Rd<br />

cycleway<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Proposed Cycleways<br />

COFF STREET<br />

CASTLE STREET<br />

PARK AVENUE<br />

GORDON STREET<br />

HARBOUR DRIVE<br />

EARL STREET<br />

Connects to Pacific<br />

Hwy cycleway<br />

DUKE STREET<br />

CURACAO STREET<br />

0m 100 200<br />

< 1 min to<br />

<strong>Coffs</strong> Creek<br />

cycleway<br />

10 min<br />

to Jetty<br />

N<br />

3 min to<br />

Botanic<br />

Gardens<br />

• To provide opportunities to leverage off of associated retail<br />

uses such as bike rental and repair shops;<br />

• To increase retail sales along bike routes consistent with<br />

research findings into retail spending patterns;<br />

• To facilitate a shift in modal choice resulting in additional<br />

parking capacity;<br />

• To use the Gordon Street trial to observe increased cycle<br />

activity and monitor the areas where bicycles are parked<br />

informally and provide formal parking and end of trip<br />

facilities in these locations; and<br />

• To most efficiently utilise <strong>City</strong> <strong>Centre</strong> land when 10 parked<br />

bikes occupy the same area as one parked car.<br />

Projects:<br />

Use Gordon St between Coff St and <strong>Harbour</strong><br />

Dr as the trial for a separated cycleway and<br />

intersection performance.<br />

Implement the <strong>City</strong> <strong>Centre</strong> Street<br />

Reconfiguration Project for all streets.<br />

Adopt the <strong>City</strong> <strong>Centre</strong> Bike Plan.<br />

Strengthen and promote Ride-To-Work Day<br />

and family cycling events and education days.<br />

Provide +100 bike racks and end of trip<br />

facilities at locations identified through<br />

observation of ad- hoc parking locations.<br />

Incorporate end of trip facilities into the Bus<br />

Hub and into new developments in the <strong>City</strong><br />

<strong>Centre</strong> core as required over time.<br />

Cost:<br />

$275,650<br />

Refer to (P- SR)<br />

p.42<br />

N/A<br />

Refer to (P- EP)<br />

p.57<br />

TBD<br />

TBD<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 12


2012: 4,500 residents are within a 5 minute bike ride of the <strong>City</strong> <strong>Centre</strong>.<br />

<strong>2031</strong>: 9,000 residents within a 10 minute bike ride of the <strong>City</strong> <strong>Centre</strong>.<br />

5 min/ 1.6km<br />

10 min/ 3.2km<br />

Strategy: Bike <strong>Masterplan</strong> (S-BP)- THE IMMEDIATE POTENTIAL<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 13


GUNDAGAI PLACE<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

Figure 4. Potential Parking Location Plan.<br />

The Cultural <strong>Centre</strong> at the<br />

<strong>City</strong> Square would provide an<br />

integrated parking solution at<br />

the core of the <strong>City</strong> <strong>Centre</strong>.<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

VERNON STREET T<br />

ALBANY STREET<br />

COFF STREET<br />

CASTLE TLE STREET<br />

PARK AVENUE<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Decked Carparking Capacity<br />

POTENTIAL CARPARK FUNDING MODELS<br />

The Castle Street/ Riding<br />

Lane Carpark extension could<br />

provide an additional 40 spaces<br />

over 3 levels= 120 spaces<br />

GORDON RDON STREET<br />

HARBOUR DRIVE<br />

EARL STREET<br />

DUKE STREETTREET<br />

CURACAO STREET<br />

0m 100 200<br />

• Joint Ventures with a private developer using existing Council owned<br />

land;<br />

• Government Grants;<br />

• Special Infrastructure Contribution;<br />

• Select charging for parking;<br />

• One-off rates payment;<br />

• Leasing Options; and<br />

• Crowdfunding.<br />

N<br />

Strategy: Parking (S-P)<br />

Principle: A mix of limited and unlimited, paid and unpaid<br />

carparking that is appropriately located, accessible, safe and ample<br />

is the basis for ensuring retail success.<br />

Finding: The free supply Addi of parking in the core of the <strong>City</strong> <strong>Centre</strong> is<br />

near capacity. Employees Requ occupy spaces for longer term parking. If<br />

visitors can’t park, they can’t shop.<br />

@ 20<br />

Benefits:<br />

= 1.6<br />

• To drive retail and commercial activities;<br />

= 5%<br />

• To provide for additional = $1 capacity for community, civic and<br />

cultural activities;<br />

• To improve parking capacity in the short- term;<br />

• To utilise sites immediately outside the <strong>City</strong> <strong>Centre</strong> to<br />

supplement <strong>City</strong> <strong>Centre</strong> long term parking requirements;<br />

• To encourage use of 170 under utilised spaces on the roof of<br />

the Castle Street Carpark and investigate expansion here;<br />

• To promote use of sustainable transport;<br />

• To reduce the need to over- deliver carparks; and<br />

• To encourage immediate development investment.<br />

Projects<br />

Convert 100 ‘all day’ carparks in the Castle St<br />

Carpark to 3 hour parking.<br />

Cost:<br />

N/A<br />

Provide shade sails/ lift at Castle St Carpark. $900,000<br />

Enforce short- term parking limits using rangers<br />

and scanner technology.<br />

Increase utilisation rates of existing spaces by<br />

upgrading and ensuring a basic level of safety,<br />

cleanliness and convenience at Castle St and<br />

Park Ave Carparks and amenities at Riding Ln.<br />

Revise S94 specifications to fund the Castle St/<br />

Riding Ln Carpark expansion.<br />

Installation of +100 bike racks to promote<br />

cycling to work.<br />

Provide cycle and bus infrastructure to achieve<br />

the modal shift goal of 10%.<br />

To encourage private development of additional<br />

carparks over the long term at potential<br />

locations identified in Figure 5.<br />

To improve the legibility of the bay markings to<br />

encourage proper use.<br />

N/A<br />

$375,000<br />

N/A<br />

TBD<br />

Refer to (P- SR)<br />

p.42<br />

N/A<br />

TBD<br />

SUMMARY:<br />

The core of the <strong>City</strong> <strong>Centre</strong> study area is at parking<br />

capacity.<br />

By <strong>2031</strong> an additional 630 short term parking<br />

spaces will be needed.<br />

Any spaces lost through the Street Reconfiguration<br />

Project within this <strong>Masterplan</strong> are balanced out by<br />

the under utilised spaces on the <strong>City</strong> <strong>Centre</strong> fringe.<br />

The new shade sail and lift at the Castle Street<br />

Carpark will increase the utilisation rate of the 170<br />

empty upper level spaces.<br />

By ‘finding’ the above spaces we are left needing<br />

460 spaces by <strong>2031</strong>.<br />

The current demand in the <strong>City</strong> <strong>Centre</strong> is<br />

approximately 2,461 parking spaces.<br />

The additional <strong>2031</strong> demand of 460 spaces could<br />

cost up to approximately $8M to construct as a<br />

carpark.<br />

If 10% of existing and new drivers shift to another<br />

mode of transport across the <strong>City</strong> <strong>Centre</strong>:<br />

= reduction of approximately 300 parking spaces<br />

= approximately $4.9 million carpark savings<br />

NOTE: The above parking assumptions have been part of preliminary<br />

investigations undertaken with GTA Consultants. Detailed findings are<br />

provided within the <strong>Masterplan</strong> Transport Report.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 14


Legibility<br />

BERYL STREET<br />

SHOWGROUND<br />

One of the key objectives of this <strong>Masterplan</strong> is to ensure that<br />

visitors to the <strong>City</strong> <strong>Centre</strong> are easily able to experience the <strong>City</strong>’s<br />

natural and urban assets and to encourage them to stay longer.<br />

GUNDAGAI PLACE<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

STREET<br />

2.<br />

MOONEE STREET<br />

ELBOW STREET<br />

PACIFIC HIGHWAY<br />

3.<br />

1.<br />

VERNON STREET<br />

COFF STREET<br />

CASTLE STREET<br />

GORDON STREET<br />

DUKE STREET<br />

As the <strong>City</strong> <strong>Centre</strong> transforms into a 21st Century <strong>City</strong>, the<br />

Strategies and Projects outlined within this report will provide<br />

a framework for the <strong>City</strong> to be known by visitors as a unique,<br />

memorable and accessible destination.<br />

The plan opposite illustrates the numerous Strategies and<br />

Projects that will reinforce the Vision for the <strong>City</strong> <strong>Centre</strong>. The<br />

Details below are discussed as components of the Strategies<br />

and Projects within the balance of this document.<br />

LEGIBILITY<br />

<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />

Existing Block<br />

Existing Building Footprint<br />

Development Outside Study Area<br />

Pacific Highway<br />

Street Reconfiguration<br />

MCLEAN STREET<br />

LITTLE STREET<br />

<strong>City</strong> <strong>Centre</strong> Main Street<br />

<strong>City</strong> <strong>Centre</strong> Supporting Street<br />

Roundabout Retrofit<br />

MARKET STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

ALBANY STREET<br />

PARK AVENUE<br />

EARL STREET<br />

HARBOUR DRIVE<br />

<strong>City</strong> <strong>Centre</strong> Gateway<br />

<strong>City</strong> Sails<br />

<strong>City</strong> Sail To Be Relocated<br />

Signage-<br />

<strong>City</strong> <strong>Centre</strong> Entry Post<br />

Key Streets Entry Post<br />

Relocatable Median Banner<br />

<strong>City</strong> <strong>Centre</strong> Information Post 1<br />

CURACAO STREET<br />

1.<br />

<strong>City</strong> <strong>Centre</strong> Information Post 2<br />

Direct Main Street Access<br />

Details<br />

<strong>City</strong> Square Public Domain Improvements<br />

2.<br />

Moonee Street Entry Statement<br />

Figure 5. Legibility Plan.<br />

0m 100 200<br />

N<br />

3.<br />

<strong>Harbour</strong> Drive Right Turn From South<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 15


KORFF STREET<br />

Strategy: <strong>City</strong> <strong>Centre</strong><br />

Legibility (S- CCL)<br />

GUNDAGAI PLACE<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

VERNON STREET<br />

PARK AVENUE<br />

ALBANY STREET<br />

COFF STREET<br />

HARBOUR DRIVE<br />

EARL STREET<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Vibrant, Connected and Green<br />

MOONEE STREET<br />

Figure 6. <strong>City</strong> <strong>Centre</strong> Core Plan.<br />

MARKET STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

CASTLE STREET<br />

GORDON STREET<br />

DUKE STREET<br />

CURACAO STREET<br />

<strong>City</strong> <strong>Centre</strong> Core<br />

<strong>City</strong> <strong>Centre</strong> Gateway<br />

0m 100 200 N<br />

Use of color & timber<br />

plantation inspiration.<br />

Prominent feature trees.<br />

Principle: A coordinated wayfinding strategy should celebrate<br />

the entry to the <strong>City</strong> <strong>Centre</strong>, improve access, signage and<br />

lighting whilst at the same time using streetscape planting<br />

and art to prioritise streets and direct visitors to destinations.<br />

A comprehensive wayfinding strategy contributes to a <strong>City</strong>’s<br />

identity and makes it more user- friendly; attracting and<br />

retaining more visitors.<br />

Finding: The <strong>City</strong> <strong>Centre</strong> lacks an easily identifiable and<br />

accessible entry and overall legibility. There is inadequate<br />

attraction and directional signage and general wayfinding within<br />

the <strong>City</strong> <strong>Centre</strong> itself.<br />

Benefits:<br />

• To enjoy a sense of arrival when entering the <strong>City</strong> <strong>Centre</strong>;<br />

• To recognise the <strong>City</strong> <strong>Centre</strong>’s Main Street, <strong>Harbour</strong><br />

Drive, and turn directly onto it from the South increasing<br />

capture of passing traffic;<br />

• To reinforce <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> as the ‘<strong>City</strong> of Sails;’<br />

• To reinforce the significance of <strong>Harbour</strong> Drive, Park<br />

Avenue, West High, Vernon, Gordon, Moonee, Coff and<br />

Little Streets as the core of the <strong>City</strong> <strong>Centre</strong>;<br />

MOONEE ST<br />

WEST HIGH ST<br />

PACIFIC HWY<br />

HARBOUR DR<br />

VERNON ST<br />

Iconic <strong>Harbour</strong> Drive sails not visible<br />

from the Pacific Hwy.<br />

Entry landscaping.<br />

• To enhance and differentiate the brand and identity of the<br />

<strong>City</strong> <strong>Centre</strong> from other places and cities;<br />

• To highlight the <strong>Harbour</strong> Drive and Earl Street intersection<br />

as the eastern gateway to the <strong>City</strong> <strong>Centre</strong>.<br />

Projects:<br />

Cost:<br />

PARK AVE<br />

Replicate the <strong>Harbour</strong> Dr sails at key locations<br />

within the <strong>City</strong> <strong>Centre</strong>.<br />

$1.3<br />

million<br />

LITTLE ST<br />

GORDON ST<br />

Implement Wayfinding Project including<br />

attraction and directional signage.<br />

$128,500<br />

Implement the <strong>Harbour</strong> Dr Access. $250,000<br />

Implement Street Reconfiguration ‘Greening’<br />

Projects.<br />

Refer to<br />

(P- SR) p.42<br />

Figure 7. Key <strong>City</strong> <strong>Centre</strong> wayfinding streets.<br />

<strong>City</strong> <strong>Centre</strong> Main Street<br />

<strong>City</strong> <strong>Centre</strong> Supporting Street<br />

Use of lighting to supplement entry statements.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 16


Strategy: Brand<br />

Positioning (S-BP)<br />

Principle: Building on the foundation of the <strong>Coffs</strong> <strong>Harbour</strong><br />

Township Marketing <strong>Masterplan</strong> and in particular, the village<br />

brand for the ‘<strong>City</strong> <strong>Centre</strong>; the <strong>City</strong> <strong>Centre</strong> brand should continue<br />

to evolve with the <strong>City</strong>. The brand and identity for <strong>Coffs</strong> <strong>Harbour</strong><br />

<strong>City</strong> <strong>Centre</strong> will be consistent with the Vision and will become a<br />

critical marketing tool to revitalise the <strong>City</strong> <strong>Centre</strong>.<br />

Finding: As <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> grows towards the <strong>City</strong><br />

of <strong>2031</strong> its brand will need to grow and evolve in order to clarify<br />

what makes it special and to help everyone understand this<br />

uniqueness in the same way.<br />

Benefits:<br />

• To capture the <strong>City</strong> <strong>Centre</strong> sense of place as it evolves;<br />

• To communicate and market a consistent brand for the<br />

<strong>City</strong> <strong>Centre</strong>;<br />

• To differentiate <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong> from its<br />

competitors; and<br />

• To reinforce the Vision for the <strong>City</strong> <strong>Centre</strong> regularly<br />

through events, art and activities that are aligned with the<br />

brand and identity of the <strong>City</strong> <strong>Centre</strong>.<br />

Projects:<br />

Investigate the opportunity for a re branding<br />

to occur that launches the <strong>City</strong> <strong>Centre</strong><br />

<strong>Masterplan</strong> <strong>2031</strong>.<br />

Incorporate the new brand into the signage<br />

and events strategies and projects.<br />

Cost:<br />

TBD<br />

Refer to (P- WF)<br />

p.30 and<br />

(P- EP) p.57<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 17


Strategy: <strong>City</strong> <strong>Centre</strong><br />

Management (S-CCM)<br />

Principle: In order for modern <strong>City</strong> <strong>Centre</strong>s to compete as an<br />

“urban experience” against competitors the level of service, visual<br />

stimulation, general up- keep and pride of the public domain<br />

and shopfronts must be consistent and inspire return visits.<br />

Finding: The management of the <strong>City</strong> <strong>Centre</strong> is not coordinated<br />

to create a consistently high quality, memorable experience.<br />

Benefits:<br />

• To offer a clean, safe, accessible and modern <strong>City</strong> <strong>Centre</strong> to<br />

visitors;<br />

• To reposition the <strong>City</strong> <strong>Centre</strong> to be equipped to flourish in<br />

the changing retail environment;<br />

• To increase tourism visits and expenditure within the <strong>City</strong><br />

<strong>Centre</strong>;<br />

• To lift the quality of the <strong>City</strong> <strong>Centre</strong> public domain<br />

and shopping experience to become a worthwhile<br />

destination; and<br />

• To consolidate retail revitalisation efforts in order to get<br />

the most ‘bang for your buck.’<br />

Projects:<br />

Establish a single, integrated board for<br />

managing the <strong>City</strong> <strong>Centre</strong>’s ‘amenity package.’<br />

<strong>City</strong> <strong>Centre</strong> clean up and de- clutter day for<br />

the <strong>City</strong> <strong>Centre</strong>.<br />

Provide hospitality training.<br />

Proactively coordinate leasing and retail mix,<br />

events and advertising.<br />

Work with landlords to provide short term<br />

activation strategies such as displays in<br />

vacant shopfronts, art spaces and concepts<br />

similar to ‘Renew Australia.’<br />

Cost:<br />

N/A<br />

Refer to<br />

(P- EP) p.57<br />

TBD<br />

TBD<br />

TBD<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 18


Key Land Use and Open<br />

Space<br />

BERYL STREET<br />

KORFF STREET<br />

SHOWGROUND<br />

The <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> identifies key strategic sites<br />

within the <strong>City</strong> <strong>Centre</strong> and outlines Principles to ensure their<br />

optimum contribution to the future vibrancy of the <strong>City</strong> <strong>Centre</strong><br />

whilst also providing a toolkit for realising their potential<br />

through development incentives, activation mechanisms,<br />

management and resilience planning.<br />

GUNDAGAI PLACE<br />

P<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

P<br />

STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

P<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

COFF STREET<br />

2.<br />

5.<br />

3.<br />

P<br />

1. 2.<br />

P<br />

CASTLE STREET<br />

2.<br />

GORDON STREET<br />

DUKE STREET<br />

P<br />

The plan opposite identifies key sites for investigation and land<br />

use activation linkages. Any carpark redevelopment would be<br />

considered as part of an integrated development maintaining<br />

existing carparking capacity. The Details below are discussed<br />

as components of the Strategies and Projects within the<br />

balance of this document.<br />

LAND USEAND OPEN SPACE<br />

<strong>City</strong> <strong>Centre</strong> Study Area Boundary<br />

Existing Block<br />

Existing Building Footprint<br />

Development Outside Study Area<br />

MCLEAN STREET<br />

LITTLE STREET<br />

Pacific Highway<br />

Street Reconfiguration<br />

MARKET STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

P<br />

P<br />

ALBANY STREET<br />

PARK AVENUE<br />

EARL STREET<br />

4.<br />

HARBOUR DRIVE<br />

P<br />

1.<br />

Rear Lane Activation- Existing and Long Term<br />

Rear Lane Activation- New Connection Long Term<br />

Open Space Revitalisation<br />

Strategic Sites For Investigation<br />

Parking<br />

Details<br />

Future Cultural Building Redevelopment Site- Long Term<br />

CURACAO STREET<br />

2.<br />

3.<br />

4.<br />

5.<br />

Entertainment <strong>Centre</strong> Investigation Sites<br />

<strong>City</strong> Square Public Domain Revitalisation and Event Space<br />

Skate Park<br />

Rear Lane Activation- Trial Artist’s Lane<br />

Figure 8. Key Land Use and Open Space Plan.<br />

0m 100 200<br />

N<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 19


1. Scarba and Moonee St<br />

Carparks:<br />

• Joint venture<br />

• Integrated parking<br />

development<br />

2. Police Station redevelopment:<br />

• Government/ State Office<br />

• Gateway entry<br />

• Moonee St activation<br />

• Pedestrian link to carpark<br />

GUNDAGAI PLACE<br />

3. Park Ave Carpark:<br />

• <strong>City</strong> heart<br />

• <strong>City</strong> Square activation<br />

• Cultural Building<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- Strategic Sites<br />

2.<br />

2.<br />

1.<br />

1.<br />

PACIFIC HIGHWAY<br />

4.<br />

3.<br />

VERNON STREET<br />

4.<br />

ALBANY STREET<br />

4. <strong>City</strong> Square Proximity:<br />

COFF STREET<br />

CASTLE CASTLE STREET STREET<br />

PARK AVENUE<br />

HARBOUR DRIVE<br />

EARL EARL STREET<br />

EET<br />

• <strong>City</strong> <strong>Centre</strong> core support site<br />

• Eastern site as carpark<br />

• Western site as boutique mixed use<br />

7.<br />

5.<br />

7.<br />

7.<br />

5.<br />

7.<br />

5.<br />

DUKE STREET<br />

CURACAO STREET<br />

7. Council Site Amalgamation/ Acquisition:<br />

• Significant single block landholding<br />

• Castle St carpark opportunities<br />

• Coff Street gateway site<br />

• Council administration consolidation<br />

6. Barracks:<br />

• Residential value<br />

6.<br />

• Park surveillance<br />

• Large floorplate<br />

5. Council Parkfront Properties:<br />

• Valued residential<br />

• Park surveillance<br />

• Additional LEP height<br />

• Ground floor activation<br />

0m 100 200 N<br />

Figure 9. Strategic Sites Plan.<br />

Strategy: Strategic Sites<br />

(S-SS)<br />

Principle: The identification of strategic sites for future<br />

redevelopment opportunities within a <strong>City</strong> <strong>Centre</strong> is critical to<br />

establishing a framework for investment, growth and evolution<br />

of a <strong>City</strong> <strong>Centre</strong> consistent with an established Vision.<br />

Finding: There are a number of sites within the <strong>City</strong> <strong>Centre</strong> that<br />

could contribute to the realisation of the <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong><br />

<strong>2031</strong> as part of future redevelopment.<br />

Benefits:<br />

• To re- brand the <strong>City</strong> <strong>Centre</strong> as a modern retail,<br />

commercial and cultural hub;<br />

• To offer inner- city residential apartment living as part<br />

of mixed use development that will contribute to safety<br />

through passive surveillance;<br />

• To leverage off of the public domain improvements within<br />

this <strong>Masterplan</strong> to promote redevelopment;<br />

• To establish a partnership between Council and private<br />

developers to deliver integrated parking solutions;<br />

• To identify joint venture opportunities for Council; and<br />

• To contribute revenue to Council for long term<br />

community projects.<br />

Gallery space<br />

dedicated to<br />

Council<br />

Bus stop/ cafe<br />

Separation of<br />

home office from<br />

apartment unit<br />

Ground floor retail with at- grade<br />

parking behind.<br />

Projects:<br />

Prepare a Redevelopment Strategy.<br />

Adopt and apply development incentives to<br />

ensure the <strong>City</strong> <strong>Centre</strong> Vision is realised.<br />

Cost:<br />

N/A<br />

N/A<br />

Explore opportunities for public/ private<br />

partnerships to realise best practice design<br />

outcomes.<br />

N/A<br />

Consider Moonee and Lyster St carparks<br />

as integrated carparking and joint venture<br />

opportunities.<br />

N/A<br />

Consider redevelopment of the Police<br />

Station site for Government/ State Office use.<br />

N/A<br />

Innovative development principles for consideration.<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 20


1.<br />

Park Avenue Lane- Existing.<br />

GUNDAGAI PLACE<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

1.<br />

VERNON STREET<br />

PARK AVENUE<br />

ALBANY STREET<br />

COFF STREET<br />

CASTLE STREET<br />

GORDON STREET<br />

HARBOUR DRIVE<br />

EARL STREET<br />

DUKE STREET<br />

Strategy: Rear Lane<br />

Activation (S-RLA)<br />

Principle: Successful cities have demonstrated that a Rear Lane<br />

Activation Strategy can contribute to the economy of a <strong>City</strong> <strong>Centre</strong><br />

by supporting conventional retail and diversifying investment<br />

opportunities.<br />

Finding: The network of public rear lanes has the potential to play<br />

a dynamic and active role in the future of the <strong>City</strong> <strong>Centre</strong> linked to<br />

redevelopment over the long term.<br />

CURACAO STREET<br />

Benefits:<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- A Better <strong>City</strong> for Walking<br />

0m 100 200<br />

Figure 10. Stage 1- Trial Activation- Park Avenue Lane.<br />

N<br />

• To broaden the economic base of a <strong>City</strong>;<br />

• To support traditional retail;<br />

Activated laneways supplement streets and public<br />

spaces to form a network of various experiences and<br />

possibilities.<br />

Park Avenue Lane has small spaces attached<br />

to the laneway that are perfect for quirky<br />

community gathering and event opportunities.<br />

Public art in the <strong>City</strong> <strong>Centre</strong> can function as<br />

protection from sun and frequent rain whilst<br />

activating spaces and promoting local and<br />

youth artwork.<br />

• To attract investment and new residents who are interested<br />

in inner city lifestyle;<br />

• To clean up and improve safety within under utilised public<br />

rear lanes in the <strong>City</strong> <strong>Centre</strong>;<br />

• To reinforce the <strong>City</strong> Square as the focal point of the <strong>City</strong><br />

<strong>Centre</strong> for events;<br />

• To showcase local artists and promote laneway art events;<br />

• To activate a secondary pedestrian movement network; and<br />

• To create a series of engaging and vibrant smaller spaces.<br />

Opportunity for range of evening activation.<br />

GUNDAGAI PLACE<br />

KORFF STREET<br />

SCARBA STREET<br />

WEST HIGH<br />

MURDOCH STREET<br />

LYSTER STREET<br />

MCLEAN STREET<br />

ELIZABETH STREET<br />

GRAFTON STREET<br />

STREET<br />

MARKET STREET<br />

MOONEE STREET<br />

ELBOW STREET<br />

LITTLE STREET<br />

PACIFIC HIGHWAY<br />

VERNON STREET<br />

HARBOUR DRIVE<br />

PARK AVENUE<br />

ALBANY STREET<br />

<strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> <strong>Centre</strong>- A Better <strong>City</strong> for Walking<br />

COFF STREET<br />

CASTLE STREET<br />

GORDON STREET<br />

DUKE STREET<br />

EARL STREET<br />

CURACAO STREET<br />

0m 100 200<br />

Figure 11. Stage 2- Long Term Rear Lane Activation.<br />

N<br />

Projects:<br />

Trial Park Ave Ln as the pilot project for an<br />

‘Artists Laneway Event’ with the <strong>City</strong> Square.<br />

Provide clean- up, lighting and security<br />

measures to promote safe use of Park Ave Ln<br />

and the <strong>City</strong> Square.<br />

Prepare a Rear Lane Activation Strategy for<br />

the balance of the rear lanes.<br />

Provide lighting and security measures in<br />

accordance with the Rear Lane Activation<br />

Strategy and in partnership with private<br />

development as it occurs.<br />

Cost:<br />

$100,000<br />

Refer to (P-<br />

CQ) p. 33<br />

N/A<br />

TBD<br />

Greenery and art add instant life to a space.<br />

Retain the existing network of rear lanes and<br />

encourage additional connections as part of<br />

new and private development in accordance<br />

with Figure 11.<br />

N/A<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 21


Strategy: Development<br />

Incentive Policy (S- DIP)<br />

Principle: To create an incentive for the private sector to<br />

develop within the <strong>City</strong> <strong>Centre</strong> and contribute to the realisation<br />

of the <strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong>.<br />

Finding: In the current financial climate, any steps Council<br />

can implement to de-risk development will be attractive to<br />

developers and lenders.<br />

There are a variety of strategies including Developer Incentives,<br />

Development Application Process and Public Improvements<br />

that can provide the incentive. They include:<br />

Developer Incentives:<br />

Development Application Process:<br />

In the current financial climate, de-risking the approval process<br />

for the private sector may provide an incentive for developers<br />

to invest in the <strong>City</strong> <strong>Centre</strong>. Initiatives Council may implement<br />

to assist with this include:<br />

• Reducing or staging DA fees;<br />

• Streamlining the DA process to provide certainty on<br />

timeframes; and<br />

• Provide DA lodgment assistance.<br />

• Council recognises that public life and creative events<br />

contribute to economic resilience and strengthen<br />

local spending. Events also create opportunities for<br />

community and business participation on a broad<br />

scale. It is also recognised that major events can deliver<br />

significant tourism benefits. A diverse events calendar<br />

adds a further layer of experience for visitors to <strong>Coffs</strong><br />

<strong>Harbour</strong> and can provide the impetus for an initial<br />

visit, a return visit, or a longer stay. As such, Council<br />

has a Creative Event Sponsorship Program aimed to<br />

complement local initiatives rather than providing all<br />

the funding.<br />

• Whilst some incentives exist, such as an increase in<br />

building height and FSR the opportunity exists to<br />

improve the effectiveness of these actions by clearly<br />

articulating the additional building capacity that will be<br />

approved if specific public benefits are provided in the<br />

<strong>City</strong> <strong>Centre</strong>. Benefits typically include:<br />

--<br />

Provision of on-site affordable housing;<br />

--<br />

On-site civic support spaces dedicated to culture, the<br />

arts, bicycle infrastructure;<br />

--<br />

Green buildings that exceed the standard rating<br />

under the Commercial BASIX Code;<br />

--<br />

Create new public space identified by the<br />

<strong>Masterplan</strong>, including plazas, pedestrian passages<br />

and new connections;<br />

--<br />

Building height bonuses that are proportionate to<br />

the permitted height; and<br />

--<br />

The viability of fine grain redevelopment of the <strong>City</strong><br />

<strong>Centre</strong> is difficult because of the necessity to provide<br />

on-site parking. Council could remove the necessity<br />

for sites of a certain size to provide any on-site<br />

parking. Instead, a discounted cash contribution to a<br />

Public Parking Fund shall be provided.<br />

Public Improvements:<br />

There are a variety of strategies that can provide incentives<br />

for existing owners or tenants to deliver the <strong>City</strong> <strong>Centre</strong><br />

<strong>Masterplan</strong>. They include:<br />

• Council recognises that shopfronts without awnings<br />

reduce the pedestrian experience, protection from the<br />

elements and alfresco dining. Through the Awning<br />

Addition Grant Program Council seeks to encourage<br />

owners or tenants to add an awning to a shopfront<br />

which, without financial assistance, may not be able to<br />

occur. The applicant must make a matched contribution<br />

of cash only, not ‘value-in-kind’, to the project. Matched<br />

grants would be considered for this program.<br />

• Council recognises that blank walls detract from<br />

pedestrian life and a sense a safety. Through the Blank<br />

Wall to Active Frontage Grant Strategy Council seeks<br />

to encourage owners or tenants to activate blank walls<br />

through public art, including opening new shopfronts<br />

onto streets, murals, lighting and other measures which,<br />

without financial assistance, may not be able to occur.<br />

The applicant must make a matched contribution of<br />

cash only, not ‘value-in-kind’, to the project. Matched<br />

grants would be considered for this program.<br />

Projects:<br />

Develop and adopt a Developer Incentives<br />

Program.<br />

Develop and adopt a Parking Discount<br />

Program and Public Parking Fund.<br />

Develop and adopt an Awning Addition<br />

Grant Program (refer to Appendix 1:<br />

Landscape Materials and <strong>Masterplan</strong>ning for<br />

detailed specifications).<br />

Develop and adopt a Blank Wall to Active<br />

Frontage Grant Strategy.<br />

Develop and adopt a Creative Event<br />

Sponsorship Program linked to the <strong>City</strong><br />

<strong>Centre</strong> Events Program<br />

Cost:<br />

$100,000<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 22


No space for tree<br />

planting.<br />

Strategy: Resilience and<br />

Flood Plan (S-RFP)<br />

+0.5M Freeboard<br />

1:100 ARI<br />

Elevated shops do not<br />

welcome passersby.<br />

Kerb as a<br />

barrier for<br />

drivers to<br />

access the<br />

footpath.<br />

Level change infrastructure consumes the public domain.<br />

Principle: Flood planning and development solutions must be<br />

balanced with a retail and public domain interface that facilitates<br />

the highest levels of retail performance within a mixed use<br />

environment and the best <strong>City</strong> <strong>Centre</strong> function on a daily basis.<br />

Finding: The majority of the <strong>City</strong> <strong>Centre</strong> is subject to 100-<br />

year ARI flood event and therefore requires development in<br />

accordance with the flood planning level defined as the level of a<br />

1:100 ARI flood event plus 0.5 metre freeboard.<br />

Benefits:<br />

• To put in place resilience- planning for the <strong>City</strong> <strong>Centre</strong>;<br />

Ad- hoc, cluttered public<br />

domain- stairs, ramps, railing.<br />

Insufficient space for<br />

tree planting.<br />

• To promote high patronage of shops within the <strong>City</strong><br />

<strong>Centre</strong> by retaining a direct relationship between the<br />

footpath and adjoining retail shops;<br />

Figure 12. Section 1: Typical flood design resolution under current policy.<br />

• To promote a quality and consistent public domain,<br />

particularly where multiple land ownership and<br />

development may lead to ad- hoc solutions;<br />

• To maximise public and private interaction on streets and<br />

public spaces; and<br />

Merchandise safe zone<br />

during infrequent flood<br />

events.<br />

Flood planning level<br />

resolved internally.<br />

Manageable level<br />

change for drivers to<br />

access shops directly.<br />

<strong>Coffs</strong> <strong>Harbour</strong> Flooding Extents Map, 2006.<br />

• To minimise financial impacts on retailers resulting from<br />

water exposure.<br />

Projects:<br />

Adopt a resiliency strategy to ensure that<br />

planning for periodic flooding does not<br />

adversely impact on the <strong>City</strong> <strong>Centre</strong> on a daily<br />

basis.<br />

Cost:<br />

N/A<br />

Extension of shopfront<br />

into the public realm.<br />

Lead a public/ private partnership to provide<br />

advice to shop owners regarding flood<br />

planning options and consider a grant<br />

scheme for key flood path properties.<br />

N/A<br />

+0.5M Freeboard<br />

1:100 ARI<br />

Assist property owners in retro- fitting of<br />

flood mitigation devices such as flood gates<br />

to existing developments.<br />

TBD<br />

Flood capable zone.<br />

Figure 13. Section 2: Alternative food design resolution- internal.<br />

Usable footpath width retained for<br />

people and trees as buffer to street.<br />

Flood planning level achieved within the shop.<br />

<strong>City</strong> <strong>Centre</strong> drainage by-pass (concept and<br />

cost/ benefit analysis).<br />

Resolve <strong>Harbour</strong> Dr /Gordon St overland<br />

flow path as part of <strong>Coffs</strong> Central.<br />

$1.9<br />

million<br />

$700,000<br />

<strong>City</strong> <strong>Centre</strong> <strong>Masterplan</strong> <strong>2031</strong> • <strong>Coffs</strong> <strong>Harbour</strong> <strong>City</strong> Council • 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!