a. F<strong>in</strong>ancial and Physical <strong>Performance</strong>s <strong>of</strong> PMGSY <strong>in</strong> <strong>Tamil</strong> <strong>Nadu</strong><br />

In 2000-01, the state received Rs. 150.84 crore under this scheme and spent Rs. 146.22<br />

crore, imply<strong>in</strong>g 96.9 percent fund utilization. 867 k.m lengths <strong>of</strong> new connectivity roads<br />

were constructed and 573.7 k.m. lengths <strong>of</strong> exist<strong>in</strong>g roads were upgraded <strong>in</strong> that year.<br />

The centre provided Rs. 115.46 crore <strong>in</strong> 2001-02, but the state spent Rs.107 crore. Thus,<br />

the fund utilization ratio decl<strong>in</strong>ed to 92.7 percent (Table 3.4).<br />

Year<br />

Table 3.4: F<strong>in</strong>ancial and Physical <strong>Performance</strong>s <strong>of</strong> PMGSY <strong>in</strong> <strong>Tamil</strong> <strong>Nadu</strong>: 2001-<br />

02 to 2007-08<br />

Road Works<br />

Sanctioned<br />

New<br />

Connectivity<br />

(<strong>in</strong> km)<br />

Up<br />

Gradation<br />

(<strong>in</strong> km)<br />

Amount<br />

Cleared by<br />

GOI<br />

(Rs. crore)<br />

Total<br />

Exp.<br />

(Rs.<br />

crore)<br />

Road Works<br />

Completed<br />

New<br />

Connectivity<br />

(<strong>in</strong> km)<br />

Up<br />

Gradation<br />

(<strong>in</strong> km)<br />

Ongo<strong>in</strong>g Works<br />

New<br />

Connectivity<br />

(<strong>in</strong> km)<br />

Up<br />

Gradation<br />

(<strong>in</strong> km)<br />

Exp. as<br />

% <strong>of</strong><br />

Fund<br />

2000-01 867.06 573.70 150.84 146.22 867.06 573.70 n.a n.a 96.94<br />

2001-02 550.86 254.78 115.46 107.01 543.06 254.78 8.00 0.00 92.68<br />

2003-04 1104.42 68.33 161.02 141.51 1079.99 8.60 n.a n.a n.a<br />

2004-05 627.12 176.53 113.67 95.94 601.16 171.46 19.00 6.00 84.40<br />

2005-06 405.81 430.58 180.22 152.56 364.93 416.58 41.00 14.00 84.65<br />

2006-07 48.31 2034.22 465.64 205.30 5.48 511.72 43.00 1522.00 44.09<br />

2007-08 62.07 2969.14 859.00 373.42 0.00 146.96 62.00 2822.00 43.47<br />

2008-09 7.57 26.64 11.33 n.a n.a n.a n.a n.a n.a<br />

2009-10 26.92 577.98 364.00 n.a n.a n.a n.a n.a n.a<br />

Source: http://pmgsy.nic.<strong>in</strong>, n.a: not available<br />

In 2006-07, the centre released Rs. 465.64 crore and the expenditure <strong>in</strong>curred by<br />

the state was Rs. 205.3 crore. The utilization ratio <strong>in</strong> that year decl<strong>in</strong>ed drastically to 44.1<br />

percent. In 2008-09, the centre gave Rs. 859 crore and the expenditures under this<br />

scheme was Rs. 373.42 crore and the ratio further decl<strong>in</strong>ed to 43.47 percent. It is noted<br />

from Table 3.4 that from 2003-04 onwards, road works completed <strong>in</strong> the state was less<br />

than the sanctioned works.<br />

The district wise actual expenditures under the scheme and the amount cleared<br />

by the centre dur<strong>in</strong>g 2003-04 to 2007-08 are shown <strong>in</strong> Tables 3.5 and 3.6.<br />

23