The project will approach the cost-sharing issue in several steps. During Year 1, IWRM II will<br />

work with IWMU and other Ministry units to prepare a draft Ministerial decree to allow<br />

BCWUAs to collect and program resources for branch canal O&M. A review will be conducted<br />

on the work that has already been done under previous projects on cost sharing and local<br />

financing. The experience of BCWUAs that have established a fee or other system to generate<br />

revenue (including in-kind contributions) will be assessed. A plan and procedures for<br />

introducing a locally controlled fee system will be prepared. Information on concepts of costsharing<br />

and turnover will be incorporated into training at all levels. Assuming that the revision<br />

of Law 12/1984 will be in place, in Year 2, after establishment of the new BCWUAs, IWRM II<br />

will work with MWRI to identify BCWUAs in each of the target directorates. And in<br />

collaboration with these BCWUAs, IWRM II will develop a system whereby farmer members<br />

of the Associations share in the cost of branch canal O&M and rehabilitation. This will be<br />

reflected in BCWUA maintenance priorities and action plans.<br />

Some of the specific activities that will be undertaken as part of this task include:<br />

• Introducing procedures for involving BCWUA board members in all maintenance<br />

activities<br />

• Awareness-raising activities, both for MWRI staff and for BCWUAs<br />

• Training BCWUAs in using hand tools in waterways weed control<br />

• Authorizing the BCWUAs to supervise canal deweeding in canals with bed width less<br />

than 2 meters, using laborers they themselves nominate, replacing the local contractors<br />

• Authorizing the BCWUAs to resolve conflicts among users to protect the waterways<br />

inside residential area from dumping of liquid and solid waste<br />

• Introducing the locally controlled fee system, if agreed upon by the users.<br />

In Year 3, based on lessons learned in Years 1 and 2, IRG will facilitate and support the<br />

development and implementation of a plan for complete transfer of the branch canal<br />

maintenance responsibility to the BCWUAs. In the event that the amendment to Law 12 is<br />

passed, implementation of Year 2 work will proceed as described above, working with selected<br />

BCWUAs to develop equitable systems for members to share the costs of O&M and<br />

rehabilitation.<br />

A flow chart showing the activity schedule, draft indicators, and targets for the Life of Project (LOP) is<br />