Water Level/Discharge (MIC); Complaints (MIC); Violations (MIC); MISD (IWMU); Water<br />

Quality (Water Quality Management Unit); Groundwater (Groundwater Sector); Maintenance<br />

Worksheets (West Sharkiya Directorate); and BCWUA (CDIAS).<br />

Establish Digital Mapping Capacity – A digital mapping program at district and directorate<br />

level will be introduced during Year 1 using Global Positioning System–Geographic<br />

Information System (GPS–GIS)-raster imagery technologies. Staff from the IWMDs, supported<br />

by the directorates, will carry out the work. Staff will be trained, and equipment provided by the<br />

project. The IWMD staff will be trained to do GPS field surveys. The spatial data collected by<br />

the district staff will provide baseline information for accurate delineation of branch canal and<br />

district boundaries in each directorate; visualization of irrigation system layout, including branch<br />

canal irrigable and service areas, water structure locations, groundwater well locations, water<br />

monitoring sites, and district, directorate and BCWUA office locations; and computed urban,<br />

BCWUA, district, and directorate areas. One of the outcomes of the mapping activities will be a<br />

MWRI–MALR agreement on irrigable area for each district. Once agreed upon, these area<br />

figures will be incorporated into the MISD database to provide more accurate water demand<br />

figures.<br />

Monitor Water Flows at the Branch Canal Level – Achieving equitable allocation of water at<br />

the branch canal level requires a mechanism for measuring flow to each branch canal. During<br />

Year 2, after the IWMD and directorate water measurement teams have been formed and<br />

trained, IWRM II will work with the Central Directorate for Water Distribution and the MWRI<br />

Hydraulic Research Institute to select one pilot branch canal in each of the eight target<br />

directorates to test different flow measurement techniques, structures, and types of equipment.<br />

Based on the results, guidelines will be developed for branch canal flow monitoring. IWRM II<br />

will work with the IWMDs, BCWUAs, and MALR to determine the best way to involve water<br />

users in the monitoring program to ensure efficient allocation, equitable distribution, scheduling,<br />

and delivery of irrigation water at the branch canal level.<br />

A flow chart showing the activity schedule, draft indicators, and targets for the LOP is shown in<br />

Figure 9.<br />

.<br />

Annual Work Plan Year 1(January–December 2009) 38