11.01.2015 Views

draft tomales bay vessel management plan - Gulf of the Farallones ...

draft tomales bay vessel management plan - Gulf of the Farallones ...

draft tomales bay vessel management plan - Gulf of the Farallones ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 1 — PROPOSED ACTIONS SUMMARY TABLE<br />

Issue Strategy Activity<br />

SS-1: Plan for and<br />

implement adequate <strong>vessel</strong>based<br />

sewage services for<br />

Tomales Bay.<br />

SS 1.1 - Establish at least three portable toilet dump stations<br />

adjacent to Tomales Bay.<br />

SS 1.2 - Establish one sewage pumpout station adjacent to<br />

Tomales Bay.<br />

SS-2: Designate Tomales<br />

Bay as a No-Discharge<br />

Zone for Vessel Sewage.<br />

SS 2.1 - Recommend that <strong>the</strong> U.S. Environmental Protection<br />

Agency (EPA) designate Tomales Bay as a No Discharge Zone<br />

(NDZ).<br />

SEWAGE SERVICES (SS)<br />

SS-3: Plan for and<br />

implement additional landbased<br />

sewage services for<br />

Tomales Bay.<br />

SS 3.1 - Recommend that <strong>the</strong> National Park Service (NPS) or<br />

Marin County install and maintain a portable bathroom facility<br />

(i.e. “Port-a-John”) at Grassy Point (NPS-GGNRA 17-<br />

111/Marin County Assessors Parcel No. 104-230-23).<br />

SS 3.2 - Encourage <strong>the</strong> purchase <strong>of</strong> Marconi Cove for <strong>the</strong><br />

installation <strong>of</strong> public boating facilities.<br />

SS-4: Ensure that future<br />

sewage services needs are<br />

met for Tomales Bay<br />

SS 4.1 - Recommend to TBIC agencies that no new waterfront<br />

facilities or expansion <strong>of</strong> existing waterfront facilities be<br />

permitted without documentation/assurance <strong>of</strong> adequate sewage<br />

waste <strong>management</strong> facilities.<br />

SS-5: Develop a boater<br />

outreach <strong>plan</strong> for <strong>vessel</strong><br />

sewage practices.<br />

SS 5.1 - Ensure that a boater outreach <strong>plan</strong> for <strong>vessel</strong> sewage<br />

practices is included as part <strong>of</strong> <strong>the</strong> Tomales Bay Boater<br />

Education and Outreach Program (see Strategy EO-1).<br />

August 23, 2012 <br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!